05000311/LER-1981-027-03, /03L-0:on 810523,valve 2PR6 Position Indication Malfunctioned.Caused by Motor Operator Limit Switch Being Out of Adjustment.Switch Adjusted

From kanterella
(Redirected from ML20005B066)
Jump to navigation Jump to search
/03L-0:on 810523,valve 2PR6 Position Indication Malfunctioned.Caused by Motor Operator Limit Switch Being Out of Adjustment.Switch Adjusted
ML20005B066
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/22/1981
From: Espey J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20005B061 List:
References
LER-81-027-03L, LER-81-27-3L, NUDOCS 8107060274
Download: ML20005B066 (1)


LER-1981-027, /03L-0:on 810523,valve 2PR6 Position Indication Malfunctioned.Caused by Motor Operator Limit Switch Being Out of Adjustment.Switch Adjusted
Event date:
Report date:
3111981027R03 - NRC Website

text

-

(7 77)

LICENSEE EVENT REPORT CONTROL BLOCK: l l

l l

l l

lh (PLEASE PRINT CR TYPE ALL REQUIRED INFORMATION) 1 6

(M l N l J l S l G l S l 2 l@l 0 l0 l-l 0 l0 l0 l0 l0 l-l0 l0 l@l4 l1l1l1l1lh!

l l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUM8ER 26 26 LsCLNSE TYPE JO 67 C A T $8 COWT jgl 0 6 l2 l 2 l 8 l 1 l@

l o l il 3{,CE l L @l0 l 5 l0 l0 l0 l3 l1 l1 @l0 l5 l2 l3 l8 l1 1

7 8

60 61 DOCKET NUM8ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DF.SCRIPTION AND PROB ABLE CONSEQUENCES h l o l 2 l ytion Statement 3.4.5.b was entered at 1551 hours0.018 days <br />0.431 hours <br />0.00256 weeks <br />5.901555e-4 months <br /> on May 23, 1981, when valve i

gposi$ ion indication could not be obtained when valve 2PR6 was repositioned.

The l

g o,3,

1o I4l l valve was declared inoperable and power to the valve operator was removed.

l l

10151 I l

lo !6 l l 1

1o171 1 I

10181I 80 DE CODE S BC E COMPONENT CODE SUBC DE S

E lol9l lC lJ lh [h Qh l V l A l L lV l E l X lh lE lh d h 7

8 9

to 11 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT NO.

CODE TYPE N C.

h REP l8]ll l0l2l7l y

l0 l3 l y

b l0 l

_2' 22 23 24 26 27 28 29 30 31 32 AKE AC ON ON PL NT METH HOURS S 8 iT FOR b.

SUPPLIE MAN FACTU ER IE l@Lzl@

Lz_J@

I zlO 101010101 Ly_J@

Ivl@

L2J@

I v 101815 I@

33 34 35 36 33 40 di 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 was issued to investigate and repair I

g ; o l l Maintenance Depart 2nent Work Order #MD947233 [i [i j [ failed valve 2PR6. The motor operator limit switch was adiusted and 2PR6 was res*od j

11, 1981. l l satisfactorily. Action Statement 3.4.5.b was terminated at 2305 hours0.0267 days <br />0.64 hours <br />0.00381 weeks <br />8.770525e-4 months <br /> on June

,,,7, I

Li_L3J l I

ii i4 i i 80 7

8 9 ST S

% POWER OTHER ST ATUS DISCO R DISCOVERY DESCRIPTION

[ h l0l0l0lhl N/A l

y hl Personnel Observataon l

1 5 AMOUNT OF ACTiviTv @ l ACTIVITY CO TENT LOCATION OF RELEASE

  • EtE ASED Or RE.E ASE N/A l

N/A l

d h Whl 1 6 80 7

8 9 10 11 44 45 PERSONNEL E XPOSURES NUMB E R TYPE

DESCRIPTION

l l0l0l0lh d @l N/A 1 7

,ERSON~d',N,ULS oESCRiPT ON@

l

. UMBER l0l0l0l@l N/A 1 x 7

8 9 11 12 LOSS OF OR DAMAGE TO FACILITY l

TYPE DE SCRIPTION l1l9]

hl N/A 7

8 9 10 N R C USE ON L Y PUBLICITY N/A l

llllllllllIIIi [N_jh[,ESCRIPTION ISSUE D D

2 o 68 69 80 5 y

a o in o

8107060274 810622 609-935-099A g

J. J. Espey PHONE:

PDR ADOCK C5000311 lER S

PDR