ML20004F638

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-006/03L-0,81-008/03L-0 & 81-013/03L-0
Date released: 01/18/2020 Download: ML20004F638


LER 81-013/03L-0:on 810505 & 06,lube Oil & Fuel Oil Leaks Found on Diesel Generator 2B.First Caused by Leaking O-ring on Lube Oil Strainer;Second by Fatigue Failure of Compression Fitting on Copper Line.Ring & Line Replaced
ML20004F644
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F644 (2)
LER 81-008/03L-0:on 810422,diesel Generator 2C Sequencer B2J Failed to Meet Time Requirements for Picking Up Step 2. Caused by Agastat Timer Setpoint Drift.Setpoint Adjusted
ML20004F643
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F643 (1)
LER 81-006/03L-0:on 810421 & 22,diesel Generator 2B Failed to Reach Rated Speed in Required Time.Cause Not Stated.Fuel Oil Day Tank Foot Valve Replaced & Fuel Line Check Valves Cleaned
ML20004F640
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F640 (2)
Forwards LERs 81-006/03L-0,81-008/03L-0 & 81-013/03L-0
ML20004F637
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1981
From: Clayton F
ALABAMA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20004F637 (1)