ML20004F637

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-006/03L-0,81-008/03L-0 & 81-013/03L-0
ML20004F637
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/12/1981
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20004F638 List:
References
NUDOCS 8106190320
Download: ML20004F637 (1)


Text

-.

+.

8 Mailing Address Alaotm3 Power Company 600 Norm 10th Street Post Ottice Box 2641 Birt ingham. Alabama 35291 A

Telephore 205 733-6061

(

F. L. C!ay*on, Jr.

Sen.or Vice President Alabama Power Flintncge Building the Sout.W cieC nc syt??m June 12, 1981 Docket No. 50-364 x

U. S. Nuclear Regulatory Coc: mission Il Office of Inspection and Enforcement w.,

gU )g d Region II j

A 101 Marietta Street, N.W.

Suite 3100 ve' b[I'

/$')

Atlanta, Georgia 30303

/

Dear Sir:

W\\

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Reports Ncs.

LER 81-006/03L-0, LER SI-008/03L-0, and LER 81-013/03L-0 are forwarded with three (3) copies of each, in accordance with my letter to Mr. J. P.

O'Reilly dated June 10, 1981 and FNP Technied Specification 6.9 to pro-vide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly,

. L. Clayton Jr.

FLCJr/JRC:nac Enclosures xc: 6 (30 copiesj Director, MIPC (3 copies)

Ak

//

810619032 0 3

..