ML20003J405
| ML20003J405 | |
| Person / Time | |
|---|---|
| Site: | Phipps Bend |
| Issue date: | 02/03/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20003J395 | List: |
| References | |
| NUDOCS 8105110377 | |
| Download: ML20003J405 (2) | |
See also: IR 05000553/1980018
Text
.
jf
%
5
UNITED STATES
~h
4
NUCLEAR REGULATORY COMMISS ON
( x5
'"
o
REGION 11
(j U
'f
101 MARIETTA ST., N.W., SUITE 310o
( ...../
a'ga 9og *a'a'
.
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
SUBJECT: Report Nos. 50-553/80-18 and 50-554/80-16
This refers to the routine inspection conducted by J. R. Harris of this office
on December 17-19, 1980, of activities authorized by NRC Construction Permit
Nos. CPPR-162 and CPPR-163 for the Phipps Bend facility. Our preliminary findings
were discussed with W. P. Kelleghan at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
l
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your respouse are delineated in Appendix A.
l
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
l
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you
l
make a written application within 20 days to this office to withhold such informa-
tion from public disclosure. Any such application an2st include the basis for
claiming that the information is proprietary and the proprietary information
should be contiined in a separate part of the document. If we do not hear from
j
you in this regard within the specified period, the report will be placed in the
Public Document Room.
,
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
Charles E. M
, Chief
l
Reactor Construction & Engineeriag
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos.
l
50-553/80-18 and 50-554/80-16
'81051103 N
-
.
. _. . _ .
_ _
_ -. -
_ - _ .
.
. ._
_ .-
.
_
-- .
_
_
'
.
.
n-
I
Tennessee Valley Authority
-2-
FEB - 3 E
i
!
cc w/ enc 1:
,
W. P. Kelleghan, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
l
H. N. Culver, Chief, Nuclear
'
!
Safety Review Staff
i
H. J. Green, Division Director
!
.
.
,
i
i
l
I
i
1
i
i
!'
.
!
.
i
i
I
i
i
i
j
i
l
t
t
--- we
7,
.,
-**
,--ey
,9
.---a.,e
w,y ,
a.-
- , - -p+.-
--p
-,.-~y--v%
c----,,y-.-,
,w,m-e,-w-
,---w-,,,e--+,,w-e-,ve-%
%- w er v.re -c--e
we, , - , . ,e