Forwards IE Insp Repts 50-553/80-18 & 50-554/80-16 on 801217-19 & Notice of Violation
ML20003J405
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 02/03/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20003J395 List:
References
NUDOCS 8105110377
Download: ML20003J405 (2)


See also: IR 05000553/1980018

Text

.

jf

%

5

UNITED STATES

~h

4

NUCLEAR REGULATORY COMMISS ON

( x5

'"

o

REGION 11

(j U

'f

101 MARIETTA ST., N.W., SUITE 310o

( ...../

a'ga 9og *a'a'

.

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

SUBJECT: Report Nos. 50-553/80-18 and 50-554/80-16

This refers to the routine inspection conducted by J. R. Harris of this office

on December 17-19, 1980, of activities authorized by NRC Construction Permit

Nos. CPPR-162 and CPPR-163 for the Phipps Bend facility. Our preliminary findings

were discussed with W. P. Kelleghan at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

l

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included in your respouse are delineated in Appendix A.

l

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

l

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

l

make a written application within 20 days to this office to withhold such informa-

tion from public disclosure. Any such application an2st include the basis for

claiming that the information is proprietary and the proprietary information

should be contiined in a separate part of the document. If we do not hear from

j

you in this regard within the specified period, the report will be placed in the

Public Document Room.

,

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Charles E. M

, Chief

l

Reactor Construction & Engineeriag

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos.

l

50-553/80-18 and 50-554/80-16

'81051103 N

-

.

. _. . _ .

_ _

_ -. -

_ - _ .

.

. ._

_ .-

.

_

-- .

_

_

'

.

.

n-

I

Tennessee Valley Authority

-2-

FEB - 3 E

i

!

cc w/ enc 1:

,

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J. E. Wills, Project Engineer

l

H. N. Culver, Chief, Nuclear

'

!

Safety Review Staff

i

H. J. Green, Division Director

!

.

.

,

i

i

l

I

i

1

i

i

!'

.

!

.

i

i

I

i

i

i

j

i

l

t

t

--- we

7,

.,

-**

,--ey

,9

.---a.,e

w,y ,

a.-

- , - -p+.-

--p

-,.-~y--v%

c----,,y-.-,

,w,m-e,-w-

,---w-,,,e--+,,w-e-,ve-%

%- w er v.re -c--e

we, , - , . ,e