ML20003J394
ML20003J394 | |
Person / Time | |
---|---|
Site: | Phipps Bend |
Issue date: | 04/09/1981 |
From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Parrish H TENNESSEE VALLEY AUTHORITY |
Shared Package | |
ML20003J395 | List: |
References | |
NUDOCS 8105110361 | |
Download: ML20003J394 (1) | |
Similar Documents at Phipps Bend | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20235B4531987-09-22022 September 1987
[Table view]Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20235B3621987-08-25025 August 1987 FOIA Request for Listed Documents for Specified Dockets ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20211K5531986-12-0303 December 1986 Partial Response to FOIA Request for Records from Vendor Insp Branch,Ie,Re Tdi.Documents Identified in App C Available in Pdr.Documents in App D Available in PDR Under FOIA Number 86-656 & Requester Name ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20065S3791982-10-26026 October 1982 Informs of Discussions Re Leasing Portions of Site to Lansdowne Steel & Iron Co for 10 Yrs.Description of Site Portions Under Consideration Encl.Cp for Sites Withdrawn ML20055C0611982-08-0606 August 1982 Forwards Info Re QA for Deferred Plants,In Response to NRC .Possible Cancellation of Some Units Will Be Discussed at Future Meeting of TVA Board of Directors ML20054M2121982-06-29029 June 1982 Responds to Appeal Re Denial of FOIA Request for Documents Re Atlas Machine & Iron Works,Inc.Forwards Me Resner 811109 & 820113 Memos to File ML20054K1531982-06-23023 June 1982 Informs That Final Deficiency Repts for Listed Nonconformances Will Not Be Submitted Until Final Decision Is Made Re Const of Projects ML20052G5671982-05-13013 May 1982 Part 21 Rept Re Potential Defect in Component of Dsrv or Dsr Standby Diesel Generator.Potential Problem Exists in Starting Air Valve Assembly Which Could Result in Engine Nonavailability.All Cognizant Parties Notified ML20049J0481982-02-26026 February 1982 Ack Receipt of W/Revision 2 of Geologic Foundation Rept,Fault Descriptions for Plant.Licensing Review Suspended Due to Const Deferral ML20054D6501982-02-19019 February 1982 Submits Final Response Re IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Westinghouse Type Switches Used in Facilities ML20040G8151982-02-0404 February 1982 Forwards Revision 2 to, Geologic Foundation Rept,Fault Descriptions, Per 780531 Meeting Request ML20039A2811981-12-0404 December 1981 Notifies That Environ Const Noise Monitoring Procedures Will Be Revised at Hartsville & Yellow Creek & Terminated at Phipps Bend.Changes Caused by Slowdown & Cessation of Const. Summary of Const Noise Monitoring Program History Encl ML20033C6681981-11-25025 November 1981 Proposes That Monitoring of Const Effects on Holston River Macrophytes Be Ended in 1982.Preliminary Results Show No Change in Eelgrass Abundance Due to Const Activities.Final Rept Will Be Submitted by Dec 1981.Concurrence Requested ML20040C2651981-11-16016 November 1981 Submits Final Response to IE Bulletin 81-02,Suppl 1,re Potentially Deficient Valves.No Subj Valves Installed at Plants ML20032D5571981-10-16016 October 1981 Submits Final Response to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Potentially Deficient Valves Identified in Subj Bulletin Are to Be Supplied for Facilities ML20032B6671981-10-15015 October 1981 Requests Util Compare Fire Protection Program w/10CFR50 App R.Deviations from App Should Be Identified & Justified as Soon as Possible.Fr Notice,Dtd 801119,encl ML20031F8581981-10-0101 October 1981 Forwards IE Insp Repts 50-553/81-07 & 50-554/81-07 on 810921-23.No Noncompliance Noted IR 05000553/19810061981-08-31031 August 1981 Forwards IE Insp Repts 50-553/81-06 & 50-554/81-06 on 810818-21.No Noncompliance Noted ML20010H3481981-08-14014 August 1981 Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. No Subj Switches Have Been Identified at Facilities.Util Awaits Info from GE for Final Resolution.Next Response by 811030 ML20009H0921981-07-28028 July 1981 Requests Consideration of More Severe Kinds of Very Low Probability Accidents Physically Possible in Eias Required by Nepa.Analyses Should Be Presented in Environ Rept. Statement of Interim Policy (45FR40101) Encl ML20009G2751981-07-24024 July 1981 Forwards IE Circular 81-11, Inadequate Decay Heat Removal During Reactor Shutdown. No Written Response Required ML20009G3291981-07-23023 July 1981 Submits Final Response to IE Bulletin 80-21,per NRC .Ge & Valve Vendors Indicate No safety-related Valves Have Parts Mfg by Malcolm Foundry Co,Inc ML20009G1271981-07-15015 July 1981 Interim Deficiency Rept Re High Pressure Core Spray Component Wiring Discrepancies.Corrective Action Date for Hardware & Software Will Be 810730 Instead of 810630. Revised Vendor Drawings Have Not Been Received ML20009D9311981-07-0808 July 1981 Forwards Response to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel) ML20009D7321981-07-0808 July 1981 Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Deficient Valves Are Being Supplied for Use at Facility.Addl Rept Will Be Provided by 811016 ML20009A4881981-07-0202 July 1981 Forwards Info Re Implementation of NUREG-0313,Revision 1,in Response to NRC .Addl Info for Hartsville & Phipps Bend Will Be Provided in Respective FSARs Tentatively Scheduled for Sept 1983 Submittal ML20030D4751981-06-30030 June 1981 Forwards IE Insp Repts 50-553/81-05 & 50-554/81-05 on 810505-08 & Notice of Violation ML20032B2761981-06-29029 June 1981 Advises of Unsuccessful First Attempt to Load Computer Program in May 1981 for Use as Aid in Drawing Control,In Response to Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02.Program Loaded as of 810612 ML20009D9461981-06-15015 June 1981 Submits Third Interim Response to IE Bulletin 80-20 Re Failure of Westinghouse W-2 Control Switches.Work Continuing W/Westinghouse on Resolution of Control Switches. GE Collecting Requested Info.Final Rept Ready by 810814 ML20004F4951981-06-0808 June 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02 ML20004E9381981-05-27027 May 1981 Submits Second Interim Response to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No Valves W/Vendor Parts Found at Plants.Final Rept,Including GE Input on NSSS Valves, Will Be Filed by 810731 ML20004D1771981-05-26026 May 1981 Advises That Completion of CP Proceedings Means Transmittal of Correspondence W/Util Will Be Discontinued.Cites Document Availability in Lpdrs & Issuance of Public Announcements ML20126L0161981-05-22022 May 1981 Forwards Addl Info Re Flammability of Suspended Ceiling Tile in Control Rooms & Replacement Panels to Be Used at Browns Ferry.Interim Rept on Hartsville & Phipps Bend Sent 810114. Info Constitutes Final Response to ML20004F4991981-05-0707 May 1981 Responds to NRC 810410 Ltr Re Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02.Corrective Actions: Computer Program Developed to Control Receipt & Issuance of Drawings & Other Documents ML20004F5641981-04-23023 April 1981 Forwards IE Info Notice 81-16, Control Rod Drive Sys Malfunctions. No Specific Response or Action Required ML20004F5021981-04-10010 April 1981 Forwards IE Insp Repts 50-553/81-03 & 50-554/81-02 on 810318-20 & Notice of Violation ML20003J3941981-04-0909 April 1981 Ack Receipt of 810226 & 0327 Ltrs Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16 ML19347E3341981-04-0808 April 1981 Forwards Facility Deficiency Rept Re Work Performed by Atlas Machine & Iron Works.Rept Raises Questions Concerning Validity of American Inst of Steel Const Quality Certification Program ML19347E0911981-04-0303 April 1981 Forwards Justification for Delay in Meeting 821001 Date for Having Operational Upgraded Emergency Response Facility,As Required by Item III.A.1.2 of NUREG-0737.Response for Hartsville & Phipps Bend Will Be Provided by 811009 ML19347E8381981-04-0202 April 1981 Forwards IE Insp Repts 50-553/81-02 & 50-554/81-03 on 810311-13.No Noncompliance Noted ML19347E0051981-04-0101 April 1981 Forwards Response to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Valcor Valves Cited in Bulletin Are Not in Use at Plants ML20004F5681981-03-31031 March 1981 Forwards IE Info Notice 81-12, Guidance on Order Issued 810109 Re Automatic Control Rod Insertion on Low Control Air Pressure. No Specific Action or Response Required ML20003J3991981-03-27027 March 1981 Forwards Supplemental Response Re Violations Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16.Corrective Actions: Rebar Verification Group Established to Work Directly W/Const Forces During Installation Processes ML20008F0711981-03-0202 March 1981 Responds to 810114 & 25 Repts Re Discovery of Faults During Excavation for Const of Cooling Towers.Faults Believed Formed During Tectonic Event,Appalachian Orogeny,250 Million Yrs Ago.Rept Not Necessary for Similar Faults Uncovered ML20003J4021981-02-26026 February 1981 Responds to NRC 810203 Ltr Re Violations Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16.Corrective Actions: Personnel Instructed to Utilize Necessary Drawings & Make Detailed Drawing Reviews ML19341C2861981-02-24024 February 1981 Forwards Info Re Faults 26 & 27 in Foundation Piers 34 & 19 of Unit 1 Cooling Tower,Initially Reported on 810113 & 22. Neither Fault Is Capable within Meaning of App a to 10CFR100 ML20008F3971981-02-17017 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required ML20008F4801981-02-13013 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at BWR, to Inform of Actions No Longer Required 1987-09-22 Category:NRC TO UTILITY MONTHYEARML20235B4531987-09-22022 September 1987
[Table view]Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20049J0481982-02-26026 February 1982 Ack Receipt of W/Revision 2 of Geologic Foundation Rept,Fault Descriptions for Plant.Licensing Review Suspended Due to Const Deferral ML20032B6671981-10-15015 October 1981 Requests Util Compare Fire Protection Program w/10CFR50 App R.Deviations from App Should Be Identified & Justified as Soon as Possible.Fr Notice,Dtd 801119,encl ML20031F8581981-10-0101 October 1981 Forwards IE Insp Repts 50-553/81-07 & 50-554/81-07 on 810921-23.No Noncompliance Noted IR 05000553/19810061981-08-31031 August 1981 Forwards IE Insp Repts 50-553/81-06 & 50-554/81-06 on 810818-21.No Noncompliance Noted ML20009H0921981-07-28028 July 1981 Requests Consideration of More Severe Kinds of Very Low Probability Accidents Physically Possible in Eias Required by Nepa.Analyses Should Be Presented in Environ Rept. Statement of Interim Policy (45FR40101) Encl ML20009G2751981-07-24024 July 1981 Forwards IE Circular 81-11, Inadequate Decay Heat Removal During Reactor Shutdown. No Written Response Required ML20030D4751981-06-30030 June 1981 Forwards IE Insp Repts 50-553/81-05 & 50-554/81-05 on 810505-08 & Notice of Violation ML20004F4951981-06-0808 June 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02 ML20004F5641981-04-23023 April 1981 Forwards IE Info Notice 81-16, Control Rod Drive Sys Malfunctions. No Specific Response or Action Required ML20004F5021981-04-10010 April 1981 Forwards IE Insp Repts 50-553/81-03 & 50-554/81-02 on 810318-20 & Notice of Violation ML20003J3941981-04-0909 April 1981 Ack Receipt of 810226 & 0327 Ltrs Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16 ML19347E8381981-04-0202 April 1981 Forwards IE Insp Repts 50-553/81-02 & 50-554/81-03 on 810311-13.No Noncompliance Noted ML20004F5681981-03-31031 March 1981 Forwards IE Info Notice 81-12, Guidance on Order Issued 810109 Re Automatic Control Rod Insertion on Low Control Air Pressure. No Specific Action or Response Required ML20008F0711981-03-0202 March 1981 Responds to 810114 & 25 Repts Re Discovery of Faults During Excavation for Const of Cooling Towers.Faults Believed Formed During Tectonic Event,Appalachian Orogeny,250 Million Yrs Ago.Rept Not Necessary for Similar Faults Uncovered ML20008F3971981-02-17017 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required ML20008F4801981-02-13013 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at BWR, to Inform of Actions No Longer Required ML20003D1231981-02-11011 February 1981 Forwards IE Insp Repts 50-553/81-01 & 50-554/81-01 on 810120-23.No Noncompliance Noted ML20003J4051981-02-0303 February 1981 Forwards IE Insp Repts 50-553/80-18 & 50-554/80-16 on 801217-19 & Notice of Violation ML19341C3681981-01-0202 January 1981 Forwards IE Insp Rept 50-553/80-17 on 801117-20.No Noncompliance Noted ML20002C4931980-12-24024 December 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/80-15 & 50-554/80-16 ML19340D7181980-12-19019 December 1980 Forwards IE Bulletin 80-25, Operating Problems W/Target Rock Safety Relief Valves at Bwrs. No Response Required ML20002C8791980-12-19019 December 1980 Requests Util Perform Ultimate Capacity Analysis of Mark III Containment for NRC Generic Review Re Effects of Hydrogen Evolving from Postulated Accident ML20002B8551980-12-18018 December 1980 Forwards Suppl 4 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19340E0131980-12-17017 December 1980 Forwards IE Info Notice 80-45, Potential Failure of BWR Backup Manual Scram Capability. No Response Required ML19340D9271980-12-0505 December 1980 Forwards IE Info Notice 80-43, Failures of Continuous Water Level Monitor for Scram Discharge Vol at Dresden Unit 2. No Response Required ML19341B6221980-12-0202 December 1980 Forwards IE Insp Repts 50-553/80-16 & 50-554/80-15 on 801105-06.No Noncompliance Noted ML19290G6321980-12-0101 December 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/80-13 & 50-554/80-13 ML20002C5111980-11-21021 November 1980 Forwards IE Insp Repts 50-553/80-15 & 50-554/80-16 on 800929-1002 & Notice of Violation ML19345E0001980-11-0404 November 1980 Ltr to All CP & OL Holders for BWRs Re Requirement for Implementation of Odyn Code for Licensing Basis Calculations Performed by Ge.Applicable to All License Applications & Proposed Amends,Including Core Reloads ML19290G6351980-10-20020 October 1980 Forwards IE Insp Repts 50-553/80-13 & 50-554/80-13 on 800812-15 & Notice of Violation ML19344E9001980-08-22022 August 1980 Forwards Suppl 3 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required ML19343A0841980-08-19019 August 1980 Forwards IE Info Notice 80-30, Potential for Unacceptable Interaction Between Control Rod Drive Scram Function & Nonessential Control Air at Certain GE BWR Facilities. No Specific Action or Response Requested ML19330B9371980-07-22022 July 1980 Forwards Suppl 2 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19337A2021980-07-21021 July 1980 Forwards IE Insp Repts 50-553/80-10 & 50-554/80-09 on 800623-27.No Noncompliance Noted ML19331B4051980-07-18018 July 1980 Forwards Suppl 1 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19327A4361980-07-16016 July 1980 Ack Receipt of 800612 Lr Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-07 & 50-554/80-06 ML19331C3891980-07-10010 July 1980 Forwards IE Insp Repts 50-553/80-09 & 50-554/80-08 on 800617-20.No Noncompliance Noted ML19327A6171980-07-0303 July 1980 Forwards IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19320C8781980-07-0202 July 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-08 & 50-554/80-07 ML19320C6811980-06-19019 June 1980 Responds to Tv Abbatiello 800606 Telcon Re IE Investigation Repts 50-553/80-05 & 50-554/80-04.Error in Paragraphs 2 & 3 of Attachment a of Subj Repts Has Been Corrected,Changing Assistant Const Engineer to Assistant Const Superintendent ML19318C2221980-06-13013 June 1980 Advises of Reorganization of Ofc of Nuclear Reactor Regulation,Effective 800428.Mgt of All Licensing Matters for Facilities Has Been Assigned to D Scaletti.Organizational Description Encl ML19329G2871980-06-12012 June 1980 Forwards IE Bulletin 80-14, Degradation of BWR Scram Discharge Vol Capability. No Written Response Required ML19320C6881980-05-29029 May 1980 Forwards IE Investigation Repts 50-553/80-05 & 50-554/80-04 on 800220-22.No Noncompliance Noted ML19320C8841980-05-28028 May 1980 Forwards IE Insp Repts 50-553/80-08 & 50-554/80-07 on 800507-09 & Notice of Violation ML19312E2501980-05-21021 May 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/79-17 & 50-554/79-16 ML19327A4411980-05-21021 May 1980 Forwards IE Insp Repts 50-553/80-07 & 50-554/80-06 on 800429-0502 & Notice of Violation ML19337A1551980-05-13013 May 1980 Forwards IE Bulletin 80-07,Suppl 1, BWR Jet Pump Assembly Failure. No Response Required ML19323E0261980-05-0505 May 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Rept 50-553/80-04 IR 05000553/19790171980-04-29029 April 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/79-17 & 50-554/79-16 1987-09-22 Category:OUTGOING CORRESPONDENCE MONTHYEARML20235B4531987-09-22022 September 1987
[Table view]Final Response to FOIA Request for Documents Re Specified Dockets.Documents in App a Already Available in Pdr.Forwards App B Documents.App B Documents Also Available in Pdr. Documents for Listed Dockets Could Not Be Located ML20215A1581986-12-0909 December 1986 Final FOIA Response to Request for Documents Re Welding,Mfg & Const Deficiencies Concerning Tdi.Forwards App E Documents.Documents Also Available in PDR ML20211K5531986-12-0303 December 1986 Partial Response to FOIA Request for Records from Vendor Insp Branch,Ie,Re Tdi.Documents Identified in App C Available in Pdr.Documents in App D Available in PDR Under FOIA Number 86-656 & Requester Name ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20054M2121982-06-29029 June 1982 Responds to Appeal Re Denial of FOIA Request for Documents Re Atlas Machine & Iron Works,Inc.Forwards Me Resner 811109 & 820113 Memos to File ML20049J0481982-02-26026 February 1982 Ack Receipt of W/Revision 2 of Geologic Foundation Rept,Fault Descriptions for Plant.Licensing Review Suspended Due to Const Deferral ML20032B6671981-10-15015 October 1981 Requests Util Compare Fire Protection Program w/10CFR50 App R.Deviations from App Should Be Identified & Justified as Soon as Possible.Fr Notice,Dtd 801119,encl ML20031F8581981-10-0101 October 1981 Forwards IE Insp Repts 50-553/81-07 & 50-554/81-07 on 810921-23.No Noncompliance Noted IR 05000553/19810061981-08-31031 August 1981 Forwards IE Insp Repts 50-553/81-06 & 50-554/81-06 on 810818-21.No Noncompliance Noted ML20009H0921981-07-28028 July 1981 Requests Consideration of More Severe Kinds of Very Low Probability Accidents Physically Possible in Eias Required by Nepa.Analyses Should Be Presented in Environ Rept. Statement of Interim Policy (45FR40101) Encl ML20009G2751981-07-24024 July 1981 Forwards IE Circular 81-11, Inadequate Decay Heat Removal During Reactor Shutdown. No Written Response Required ML20030D4751981-06-30030 June 1981 Forwards IE Insp Repts 50-553/81-05 & 50-554/81-05 on 810505-08 & Notice of Violation ML20004F4951981-06-0808 June 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/81-03 & 50-554/81-02 ML20004D1771981-05-26026 May 1981 Advises That Completion of CP Proceedings Means Transmittal of Correspondence W/Util Will Be Discontinued.Cites Document Availability in Lpdrs & Issuance of Public Announcements ML20004F5641981-04-23023 April 1981 Forwards IE Info Notice 81-16, Control Rod Drive Sys Malfunctions. No Specific Response or Action Required ML20004F5021981-04-10010 April 1981 Forwards IE Insp Repts 50-553/81-03 & 50-554/81-02 on 810318-20 & Notice of Violation ML20003J3941981-04-0909 April 1981 Ack Receipt of 810226 & 0327 Ltrs Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-18 & 50-554/80-16 ML19347E3341981-04-0808 April 1981 Forwards Facility Deficiency Rept Re Work Performed by Atlas Machine & Iron Works.Rept Raises Questions Concerning Validity of American Inst of Steel Const Quality Certification Program ML19347E8381981-04-0202 April 1981 Forwards IE Insp Repts 50-553/81-02 & 50-554/81-03 on 810311-13.No Noncompliance Noted ML20004F5681981-03-31031 March 1981 Forwards IE Info Notice 81-12, Guidance on Order Issued 810109 Re Automatic Control Rod Insertion on Low Control Air Pressure. No Specific Action or Response Required ML20008F0711981-03-0202 March 1981 Responds to 810114 & 25 Repts Re Discovery of Faults During Excavation for Const of Cooling Towers.Faults Believed Formed During Tectonic Event,Appalachian Orogeny,250 Million Yrs Ago.Rept Not Necessary for Similar Faults Uncovered ML20008F3971981-02-17017 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required ML20008F4801981-02-13013 February 1981 Forwards Suppl 5 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at BWR, to Inform of Actions No Longer Required ML20003D1231981-02-11011 February 1981 Forwards IE Insp Repts 50-553/81-01 & 50-554/81-01 on 810120-23.No Noncompliance Noted ML20003J4051981-02-0303 February 1981 Forwards IE Insp Repts 50-553/80-18 & 50-554/80-16 on 801217-19 & Notice of Violation ML19341C3681981-01-0202 January 1981 Forwards IE Insp Rept 50-553/80-17 on 801117-20.No Noncompliance Noted ML20002C4931980-12-24024 December 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/80-15 & 50-554/80-16 ML20002C8791980-12-19019 December 1980 Requests Util Perform Ultimate Capacity Analysis of Mark III Containment for NRC Generic Review Re Effects of Hydrogen Evolving from Postulated Accident ML19340D7181980-12-19019 December 1980 Forwards IE Bulletin 80-25, Operating Problems W/Target Rock Safety Relief Valves at Bwrs. No Response Required ML20002B8551980-12-18018 December 1980 Forwards Suppl 4 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19340E0131980-12-17017 December 1980 Forwards IE Info Notice 80-45, Potential Failure of BWR Backup Manual Scram Capability. No Response Required ML19340D9271980-12-0505 December 1980 Forwards IE Info Notice 80-43, Failures of Continuous Water Level Monitor for Scram Discharge Vol at Dresden Unit 2. No Response Required ML19341B6221980-12-0202 December 1980 Forwards IE Insp Repts 50-553/80-16 & 50-554/80-15 on 801105-06.No Noncompliance Noted ML19290G6321980-12-0101 December 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-553/80-13 & 50-554/80-13 ML20002C5111980-11-21021 November 1980 Forwards IE Insp Repts 50-553/80-15 & 50-554/80-16 on 800929-1002 & Notice of Violation ML19345E0001980-11-0404 November 1980 Ltr to All CP & OL Holders for BWRs Re Requirement for Implementation of Odyn Code for Licensing Basis Calculations Performed by Ge.Applicable to All License Applications & Proposed Amends,Including Core Reloads ML19290G6351980-10-20020 October 1980 Forwards IE Insp Repts 50-553/80-13 & 50-554/80-13 on 800812-15 & Notice of Violation ML19344E9001980-08-22022 August 1980 Forwards Suppl 3 to IE Bulletin 80-17, Failure of Control Rods to Insert During Scram at Bwr. No Written Response Required ML19343A0841980-08-19019 August 1980 Forwards IE Info Notice 80-30, Potential for Unacceptable Interaction Between Control Rod Drive Scram Function & Nonessential Control Air at Certain GE BWR Facilities. No Specific Action or Response Requested ML19330B9371980-07-22022 July 1980 Forwards Suppl 2 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19337A2021980-07-21021 July 1980 Forwards IE Insp Repts 50-553/80-10 & 50-554/80-09 on 800623-27.No Noncompliance Noted ML19331B4051980-07-18018 July 1980 Forwards Suppl 1 to IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19327A4361980-07-16016 July 1980 Ack Receipt of 800612 Lr Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-07 & 50-554/80-06 ML19331C3891980-07-10010 July 1980 Forwards IE Insp Repts 50-553/80-09 & 50-554/80-08 on 800617-20.No Noncompliance Noted ML19327A6171980-07-0303 July 1980 Forwards IE Bulletin 80-17, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. No Written Response Required ML19320C8781980-07-0202 July 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in IE Insp Repts 50-553/80-08 & 50-554/80-07 ML19320C6811980-06-19019 June 1980 Responds to Tv Abbatiello 800606 Telcon Re IE Investigation Repts 50-553/80-05 & 50-554/80-04.Error in Paragraphs 2 & 3 of Attachment a of Subj Repts Has Been Corrected,Changing Assistant Const Engineer to Assistant Const Superintendent ML19318C2221980-06-13013 June 1980 Advises of Reorganization of Ofc of Nuclear Reactor Regulation,Effective 800428.Mgt of All Licensing Matters for Facilities Has Been Assigned to D Scaletti.Organizational Description Encl ML19329G2871980-06-12012 June 1980 Forwards IE Bulletin 80-14, Degradation of BWR Scram Discharge Vol Capability. No Written Response Required ML19320C6881980-05-29029 May 1980 Forwards IE Investigation Repts 50-553/80-05 & 50-554/80-04 on 800220-22.No Noncompliance Noted 1987-09-22 |
See also: IR 05000553/1980018
Text
-
.
..
!
[ga aec
o
'o
UNITED STATES
[ j
,_. ,
'
NUCLEAR REGULATORY COMMISSION
c
REGION ll
' ~
- 3 h'!
101 MARIE TT A ST.. N.W.. SUlTE 3100
o
'%s
AT L ANTA. G EORGI A 30303
m
o
~
pf'. $
A?R 0 91981
e
Tennessee Valley Authority
g/s
pg
ATIN:
H. G. Parri s
s-
Manager of Power
(
APR 3 g ggOI' :8
500A Chestnut Street Tower II
"
( u.s,D@roo [
Chattanooga, TN 37401
Gentlemen:
9
g
Subject: Report Nos.
M 4/80- h
Thank you for your letters of February 26, 1981 and March 27, 1931, 'nforming us
of steps you have taken to correct the violation concerning activities under NRC
Construction Permit Nos. CPPR-162 and C?PR-163 brought to your attention in cur
letter of February 3,
1981. We will examine your corrective actions and plans
during subsequent inspections.
We appreciate your cooperation with us.
Sincerely,
/9
,/
/
.l
'I^
/
Y
sf
. ,- : 3 -
i,
C?
' AcTi r Di ector
s,
Divisio
f Resident and
Reactor Project Inspection
cc:
H. J. Green, Division Director
W. P. Kelleghan, Project Manager
J. F. tox, Supervi sor, Nuclear
Licensing Section
J. E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear
Safety Review Staff
81=11o m
P00R ORIGINAL
q