UNITED STATES
g
g
NUCLEAR REGULATORY COMMISSION
.-
r
REF,0N V
~
I'
8
1990 N, CALIFt ANtA BOULEVARD
.
SulTE 202, W NLNUT CREEK PLAZA
- ,,,e
WALNUT CP 4EK, CALIFORNIA 94596
FEB 2 31981
g
-
3
nr
k
4
'
Docket Nos. 50-508
7
e.] o,'M. pG[0 ISgI[
S
50-509
211
- .>.
'%e .4,,,',,
%,,r g
.
.
c
.
Washington Public Power Supply System
.1
e,
A
P. O. Box 1223
Q?
[k
Elma, Washington 98541
'
Attention: Mr. D. E. Dobson
WNP-3/5 Program Director (Acting)
References:
1.
WPPSS letter from D. E. Dobson to R. H. Engelken
of January 9,1981, No. G03-80-059
'
2.
NRC letter from R. H. Engelken to F. D. McElwee
of December.15, 1980, forwarding Inspection Report
No. 80-14
-
Gentlemen:
Thank you for your letter, Reference 1, responding to the item of
noncompliance provided to you by Reference 2.
Your written response
.
ha. Nen reviewed and was found to lack sufficient information to
permit our assessment of your overall corrective actions.
By Reference 2, you were requested to include in your response to
,
the item of noncompliance a discussion of those actions being taken
-
at WNP-3/5 to implement the lessons learned at WNP-2 to improve contractor
performance. You were further requested to include a description
of those actions taken or planned to assure that a complete file of
all quality assurance records generated will be maintained and available
for inspection at all times and that all such records will accurately
reflect the status of the activities covered. This additional infonnation
.
was requested from you because our investigation had substantiated
an allegation that quality records were withheld from NRC inspection
by one of your contractors.
Your response to our request for the additional infonnation did address
the actions you intend to take to utilize the lessons learned from
WNP-2. These actions will be exanined following your implementation
in March 1981. Your response, however, did not address your taken
or planned actions which assure the maintenance, availability, and
accuracy of quality records. Accordingly, you are requested to submit
. . .:
8 e4 2 0061s
_ . ' . _ _
2
.
-
.
.-
-
.
. . . -
. - - -
.
.-.
.
_
_
.
o
..
.
-
.
.
.
,
FE3 23 Es1
Washington Public Power Supply System
-2-
to this office, within twenty-five (25) days of the date of this letter,
-
a written statement or explanation' addressing your taken or planned
actions in this area. .
Your written response to the specific itc= of nonccmpliance (failure
to calibrate equipment within specified frequency) is satisfactory.-
The implementation and effectiveness of the actions identified will
be examined in a subsequent NRC insoection.
Please contact us if you have any questions regarding the above.
Sincerely,
"
R. H. Engelken
-,
Director
,
.
,
cc:
R. L. Ferguson,
Managing Director
M. E. Witherspoon,
Quality Assurance Director
- *
. . .
.