ML20003E796

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Investigation Repts 50-508/80-14 & 50-509/80-14.Requests Addl Info Re Contractor Performance Improvement & Planned Actions Re QA Records
ML20003E796
Person / Time
Site: Satsop
Issue date: 02/23/1981
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20003E794 List:
References
NUDOCS 8104100615
Download: ML20003E796 (2)


See also: IR 05000508/1980014

Text

w 4kL

-

... %.

![ , Ic

UNITED STATES

g

g

NUCLEAR REGULATORY COMMISSION

.-

r

REF,0N V

~

I'

8

1990 N, CALIFt ANtA BOULEVARD

.

SulTE 202, W NLNUT CREEK PLAZA

  • ,,,e

WALNUT CP 4EK, CALIFORNIA 94596

FEB 2 31981

g

-

3

nr

k

4

'

Docket Nos. 50-508

7

e.] o,'M. pG[0 ISgI[

S

50-509

211

.>.

'%e .4,,,',,

%,,r g

.

.

c

.

Washington Public Power Supply System

.1

e,

A

P. O. Box 1223

Q?

[k

Elma, Washington 98541

'

Attention: Mr. D. E. Dobson

WNP-3/5 Program Director (Acting)

References:

1.

WPPSS letter from D. E. Dobson to R. H. Engelken

of January 9,1981, No. G03-80-059

'

2.

NRC letter from R. H. Engelken to F. D. McElwee

of December.15, 1980, forwarding Inspection Report

No. 80-14

-

Gentlemen:

Thank you for your letter, Reference 1, responding to the item of

noncompliance provided to you by Reference 2.

Your written response

.

ha. Nen reviewed and was found to lack sufficient information to

permit our assessment of your overall corrective actions.

By Reference 2, you were requested to include in your response to

,

the item of noncompliance a discussion of those actions being taken

-

at WNP-3/5 to implement the lessons learned at WNP-2 to improve contractor

performance. You were further requested to include a description

of those actions taken or planned to assure that a complete file of

all quality assurance records generated will be maintained and available

for inspection at all times and that all such records will accurately

reflect the status of the activities covered. This additional infonnation

.

was requested from you because our investigation had substantiated

an allegation that quality records were withheld from NRC inspection

by one of your contractors.

Your response to our request for the additional infonnation did address

the actions you intend to take to utilize the lessons learned from

WNP-2. These actions will be exanined following your implementation

in March 1981. Your response, however, did not address your taken

or planned actions which assure the maintenance, availability, and

accuracy of quality records. Accordingly, you are requested to submit

. . .:

8 e4 2 0061s

_ . ' . _ _

2

.

-

.

.-

-

.

. . . -

. - - -

.

.-.

.

_

_

.

o

..

.

-

.

.

.

,

FE3 23 Es1

Washington Public Power Supply System

-2-

to this office, within twenty-five (25) days of the date of this letter,

-

a written statement or explanation' addressing your taken or planned

actions in this area. .

Your written response to the specific itc= of nonccmpliance (failure

to calibrate equipment within specified frequency) is satisfactory.-

The implementation and effectiveness of the actions identified will

be examined in a subsequent NRC insoection.

Please contact us if you have any questions regarding the above.

Sincerely,

"

R. H. Engelken

-,

Director

,

.

,

cc: