OV APPENDIX A NOTICE OF VIOLATION Alabama Power Company Docket No. 50-348 Farley 1 License No. NPF-2 As a result of the inspection conducted on January 12-16, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.

Technical Specification 6.8.1 requires written procedures shall be established, implemented and maintained.

FNP-0-AP-6, Procedure Adherence, Revision 1, dated 4/77 requires that deviations from plant procedures be documented and approved by appropriate plant personnel.

Contra ry to the above, written procedures were not being maintaiced.

FNP-1-SOP-23.0, Component Cooling Water System, Revision 2 dated 11/79, required the position of valve QlP17V189 RHR pump 1A seal Hx CCW inlet line drain to be open (it should be closed for normal system operation). The most recent valve lineup of the CCW system identified that the valve was in the closed position and the valve lineup had a correction written into the required valve position column. 1No temporary change notice or other docu-mentation was initiated as required by FNP-0-AP-6, Procedure Adherence.

This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the provisions of 10 CFR 2.201, Alabama Power Company is hereby required

' to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violation;. (2) the reasons.for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which~

will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act

- of 1954, as amended, this response shall be submitted under oath or affirmation.