Responds to NRC Re Violations Noted in IE Insp Repts 50-348/81-01 & 50-364/81-01.Corrective Actions: Procedure Change to FNP-1-SOP-23.0 Initiated on 810115
ML20003E548
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/04/1981
From: Clayton F
ALABAMA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003E545 List:
References
NUDOCS 8104060118
Download: ML20003E548 (2)


Text

Alabama Power Company 600 North 18th Street Post Offic] Box 2641 Birmingham, Alabama 35291

..uCO Telephone 205 250-1000

'O'l' b

F. L CLAYTON, JR.

'\\ 'd *'

Senior Vice President

G J Alabama Power the southem ehrtre svstem March 4, 1981 J. M. Farley Nuclear Plant NRC Inspection of January 12-16, 1981 Mr. R. C. Lewis U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303 RE:

Report Number 50-348/81-01 Report Number 50-364/81-01

Dear Mr. Lewis:

This letter is Alabama Power Comapny's response to the viclation in the subject inspection report which states:

" Technical Specification 6.8.1 requires written procedures shall be established, implemented and maintained.

FNP-0-AP-6, Procedure Ad-herence, Revision 1, dated 4/77 requires that deviations from plant procedures be documented and approved by appropriate plant personnel.

Contrary to the above, written procedures were not being maintained.

FNP-1-S0P-23.0, Component Cooling Water System, Revision 2 dated 11/79, required the position of valve QIP17V189 RHR pump 1A seal Hx CCW inlet line drain to be open (it should be closed for normal system operation).

The most recent valve lineup of the CCW system identified that the valve was in the closed position and the valve lineup had a correction 3ritten into the required valve position column. No temporary change notice or other documentation was initiated as required by FNP-0-AP-6, Procedure Adherence."

Reason for Violation The violation resulted from the failure of an operator to initiate a procedure change request upon discovery of the procedure error.

Corrective Action A change to procedure FNP-1-S0P-23.0 was initiated on January 15, 1981.

g3.04060

  • /

Mr. 9. C. Lewis March 4,1981 Page Two Results Achieved The correct position for valve QIPl7V189 was incorporated in the pro-cedure.

Steps Taken to Avoid Further Violations A memorandum was issued to all operating personnel on February 27, 1981 requiring them to review FNP-0-AP-6 to refamiliarize themselves with the re-quirements of procedural adherence and documentation necessary when deviating from plant procedures.

Date of Full Compliance February 27, 1981.

If you have any questions, please advise.

Very truly yours, A _

  • e, F. L. Clayton, FLCJr/JRC:nac xc: Mr. J.. M. Farley Sworn to and subscribed before me Mr. W. O. Whitt Y day of [I

, 1981.

Mr. W. H. Bradford this Mr. H. O. Thrash Mr. O. D. Kingsley Mr. J. R. Campbell

[,

Mr. W. G. Hairston Mr. J. W. McGowan Notary Public File c gg

3) '

My Ccmmission Expires:

y, e

y

,