ML20003E551
| ML20003E551 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/11/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20003E545 | List: |
| References | |
| NUDOCS 8104060123 | |
| Download: ML20003E551 (2) | |
See also: IR 05000348/1981001
Text
,
h
'
\\
's Ucy;
n
[
UNITED STATES
'
o,
8"
flUCLEAR REGULATORY COMMISSION
~
n
$
FIEGION 11
- I
101 MARIETTA sT.. N.W., sulTE 3100
g
ATLANTA, GEORGIA 3C303
FEB 11 1991
+..s
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
Subject: Report Nos. 50-348/81-01 and 50-364/81-01
This refers to the routine safety inspection conducted by P. H. Skinner of this
office on January 12-16, 1981, of activities authorized by NRC License No. NPF-2
and Construction Permit No. CPPR-86 for the Farley facility. Our preliminary
. findings were discussed with W. G. Hairston, III at the conclusion of the ins},ec-
tion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within 'these areas, the inspection consisted of
selective examinations of procedures and representative records, intervisws with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent require-
ments are listed in the Notice of Violation enclosed herewith as Appendix A.
- Elements to be included in your response are delineated in Appendix A.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10,' Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed ie the NRC Public Document Room. If this report contains
any information that you believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold such infor-
[
mation from public disclosure. Any such application must include the basis for
l
claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
l
you in this regard within the specified period, the report will be placed in the
Public Document Room.
i
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely
.6.
R. C.
wis, Acting Chief
Reactor Operations and Nuclear
.
Support Branch'
Enclosures:
See Page 2
l
8104060
L
-
_.
.
.
Alabama Power Company
-2-
pgg i 1 ggg)
Enclosures:
1.
Appendix A, Notice of Violation
. 2.
Inspection Report Nos. 50-348/81-01
and-50-364/81-01
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
>
'
O. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan Manager-Operations
Quality Assurance
W. G. Hairston, III,. Plant Manager
W. C. Petty, Manager-Ouality Assurance
(Design and Construction)
R. E. Hollands , . Jr. , QA Supervisor
1