ML20003E551

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/81-01 & 50-364/81-01 on 810112-16 & Notice of Violation
ML20003E551
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 02/11/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20003E545 List:
References
NUDOCS 8104060123
Download: ML20003E551 (2)


See also: IR 05000348/1981001

Text

,

h

'

\\

's Ucy;

n

[

UNITED STATES

'

o,

8"

flUCLEAR REGULATORY COMMISSION

~

n

$

FIEGION 11

I

101 MARIETTA sT.. N.W., sulTE 3100

g

ATLANTA, GEORGIA 3C303

FEB 11 1991

+..s

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

Subject: Report Nos. 50-348/81-01 and 50-364/81-01

This refers to the routine safety inspection conducted by P. H. Skinner of this

office on January 12-16, 1981, of activities authorized by NRC License No. NPF-2

and Construction Permit No. CPPR-86 for the Farley facility. Our preliminary

. findings were discussed with W. G. Hairston, III at the conclusion of the ins},ec-

tion.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within 'these areas, the inspection consisted of

selective examinations of procedures and representative records, intervisws with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent require-

ments are listed in the Notice of Violation enclosed herewith as Appendix A.

- Elements to be included in your response are delineated in Appendix A.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10,' Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed ie the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such infor-

[

mation from public disclosure. Any such application must include the basis for

l

claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

l

you in this regard within the specified period, the report will be placed in the

Public Document Room.

i

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely

.6.

R. C.

wis, Acting Chief

Reactor Operations and Nuclear

.

Support Branch'

Enclosures:

See Page 2

l

8104060

L

-

_.

.

.

Alabama Power Company

-2-

pgg i 1 ggg)

Enclosures:

1.

Appendix A, Notice of Violation

. 2.

Inspection Report Nos. 50-348/81-01

and-50-364/81-01

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

>

'

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan Manager-Operations

Quality Assurance

W. G. Hairston, III,. Plant Manager

W. C. Petty, Manager-Ouality Assurance

(Design and Construction)

R. E. Hollands , . Jr. , QA Supervisor

1

I

k

. . . _ . _ . _ ,