Forwards IE Insp Repts 50-508/81-01 & 50-509/81-01 on 810113-16 & Notice of Violation
ML20003E021
Person / Time
Site: Satsop
Issue date: 02/12/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20003E014 List:
References
NUDOCS 8104020092
Download: ML20003E021 (2)


See also: IR 05000508/1981001

Text

h ) & h fA >

[4p tecy

UNITED STATES

' o

0V

' }; e

NUCLEAR REGULATORY COMMISSION

REGION V

[c

,

1990 N. CAllFORNI A BOULEVARD

0,,

t

e

SUITE 202, WALNUT CREEK PLAZA

o.

,a

WALNUT CREE K, CALIFORNI A 94596

-

FE8121931

Docket No. 50-508 50-509

[

%,N

b)!

f, 0}lbSjk:,

lg}lNEfiped "

I

"

Washington Public Power Supply System

.

,

'

P. O. Box 1223

A

/

Elma, Washington 98541

"{,c

4

g

w*.o j

Attention: Mr. D. E. Dobson

-

Program Director, WNP-3/5 (Acting)

Gentlemen:

Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5

This refers to the inspection conducted by Messrs. D. P. Haist and

G. Hernandez of this office on January 13-16, 1981 of activities authorized

by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion

of our findings with Mr. D. E. Dobson and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of. procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

This

item of noncompliance has been categorized into a level as described in

the Federal Register Notice (45 FR 66754) dated .0ctober 7,1980.

In accordance with section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

- necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure. * The application must include a full statement of

L8104 0 2 0 09 2

m

,

.

.

FEB 121981

-

Washington Public Power Supply System

-2-

the reasons why it is claimed that the information is proprietary.

The

application should be prepared so that any proprietary information identified

- is contained in an enclosure to the application, since the application without

the enclosure will also bc placed in the Public Document Room.

If we do not

hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely.

,

.

/

'

we

G. S. Spencer, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

A. Notice of Violation

B. IE Inspection Report

No. 50-508/81-01

50-509/81-01

cc w/o enclosure B:

M. E. Witherspoon, WPPSS

-

- - - - -

.