ML20003E021
| ML20003E021 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 02/12/1981 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Dobson D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML20003E014 | List: |
| References | |
| NUDOCS 8104020092 | |
| Download: ML20003E021 (2) | |
See also: IR 05000508/1981001
Text
h ) & h fA >
[4p tecy
UNITED STATES
' o
0V
' }; e
NUCLEAR REGULATORY COMMISSION
REGION V
- [c
,
1990 N. CAllFORNI A BOULEVARD
0,,
t
e
SUITE 202, WALNUT CREEK PLAZA
o.
,a
WALNUT CREE K, CALIFORNI A 94596
-
FE8121931
Docket No. 50-508 50-509
[
%,N
b)!
f, 0}lbSjk:,
lg}lNEfiped "
I
"
Washington Public Power Supply System
.
,
'
P. O. Box 1223
A
/
Elma, Washington 98541
"{,c
4
g
w*.o j
Attention: Mr. D. E. Dobson
-
Program Director, WNP-3/5 (Acting)
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5
This refers to the inspection conducted by Messrs. D. P. Haist and
G. Hernandez of this office on January 13-16, 1981 of activities authorized
by NRC Construction Permit Nos. CPPR-154 and CPPR-155, and to the discussion
of our findings with Mr. D. E. Dobson and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of. procedures and representative records, interviews with personnel, and
observations by the inspector.
Based on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
This
item of noncompliance has been categorized into a level as described in
the Federal Register Notice (45 FR 66754) dated .0ctober 7,1980.
In accordance with section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you believe to be proprietary, it is
- necessary that you submit a written application to this office, within 20
days of the date of this letter, requesting that such information be withheld
from public disclosure. * The application must include a full statement of
L8104 0 2 0 09 2
m
,
.
.
FEB 121981
-
Washington Public Power Supply System
-2-
the reasons why it is claimed that the information is proprietary.
The
application should be prepared so that any proprietary information identified
- is contained in an enclosure to the application, since the application without
the enclosure will also bc placed in the Public Document Room.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely.
,
.
/
'
we
G. S. Spencer, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
B. IE Inspection Report
No. 50-508/81-01
50-509/81-01
cc w/o enclosure B:
M. E. Witherspoon, WPPSS
-
- - - - -
.