Suppls Response to NRC Re Violations Noted in IE Insp Repts 50-508/81-01 & 50-509/81-01.Corrective Actions: Ferrule Matl Removed from Areas Stud Welded on 810117 But Not Yet Imbedded in Concrete
ML20003E017
Person / Time
Site: Satsop
Issue date: 03/17/1981
From: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20003E014 List:
References
GO3-81-756, NUDOCS 8104020070
Download: ML20003E017 (1)


Text

W-

[ wiriip[mg C

.h EP W shington Public Power Supply System a

g x.

{f y A JO NT OPERATING AGENCY y

(

e S

- c& S,4

/

e h

5 1 P. O. 8011223 E L M 4, W ASHINGTON 98541 P

March 17,1981 G03-81-756 Nuclear Regulatory Commission, Region V Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Attention:

Mr. D. H. Faulkenberry Chief, Reactor Construction Projects Branch Gentl emen:

t

Subject:

WPPSS NUCLEAR PROJECTS 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509

References:

1) Letter, G. S. Spencer to D. E. Dobson, "NRC Inspection at WNP-3/5 during January 13-16, 1981,"

dated February 12, 1981.

J

2) G03-81-620, letter, D. E. Dobson to G. S. Spencer, same subject, dated March 2,1981.

Reference 2) provided a response to the notice of violation included in Reference I L We have determined that this response did not include all the corrective actions implemented to correct the noncompliance. Speci-fically, the response did not address removal of ferrule material from areas stud welded prior to January 17, 1981 but not yet embedded in concrete.

This action was initiated through CAR 263-004 and was completed on March 3,1981.

Very truly y Grs, D. E.

OBSON Project Manager, WNP-3/5 cc:

D. Smithpeter - BPA Ebasco - New York WNP-3/5 - Richland 8104020070 Kl.31