Responds to NRC 810212 Ltr Re Violations Noted in IE Insp Repts 50-508/81-01 & 50-509/81-01.Corrective Actions: Training Session Held,Emphasizing Requirements for Removal of Ferrules & Bending of First Two Studs
ML20003E019
Person / Time
Site: Satsop
Issue date: 03/02/1981
From: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20003E014 List:
References
GO3-81-620, NUDOCS 8104020084
Download: ML20003E019 (4)


Text

.h, .

O

P F W shington Public Power Supply System A JOINT OPERATING AGENCY S

P. O. 40X 1223 ELM A, W A5HINGTON 98541 PHON! [206] 249-5001 March 2, 1981 G03-81-620 Nuclear Regulatory Commission, Region V Suite 202, Walnut Creek Plaza 1990 N. Californfa Boulevard Walnut Creek, California 94596 Attention: Mr. G.S. Spencer, Chief Reactor Construction and Engineering Support Branch Gentl emen:

Su bject: WPPSS NUCLEAR PROJECTS 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509

Reference:

1). Letter, G.S. Spencer to D.E. Dobson, NRC Inspection at WNP-3/5, dated February 12, 1981.

This letter is in response to your letter of February 12,1981, which discussed the results of the inspection conducted January 13.thru 16, 1981, of activities authorized by Nuclear Regulatory Commission Construc-tion Permit Numbers CPPR-154 and CPPR-155. The letter identified one (1) item of noncompliance and required the Supply System to provide a response to these items.

The specific Nuclear Regulatory Commission Finding, as stated in your t letter, and the Supply System response is provided in Attachment I of this letter.

Should you have any questions or desire further information, please feel free to contact me directly.

Very truly yours, MD.E. Dobson -

Acting Program Director, WNP-3/5 Attachment cc: D. Smithpeter - BPA t Ebasco - New York -

e WNP-3/5 Files - Richland

95g N'.g-o C s @

W 8104 oso 08 4 - em. %l- M

o- t ,

~ ATTACHMENT I NUCLEAR REGULATORY COMMISSION FINDING:

As a result of the inspection conducted on January 13 to 16,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),

the following violation was identified:

10 CFR 50, Appendix B, Criterion V, as implemented by Section 17.4.5 of the Quality Assurance Program documented in the approved PSAR deviation 18-WP, states, in part, that " Activities affecting quality. ..shall be occomplished in accordance with... instructions, procedures or drawings."

Morrison-Knudsen Administrative Instruction Procedure Number 15,

" Stud Welding Inspection Procedure," states in paragraph 6.3 that, "Each operator shall bend the first two studs on each day's production to 300 and the first two studs on each member to 30 0", in paragraph 6.8 that, "The operator shall circle with a paint stick, or paint a line up the shank of the first two studs bent on each new mea,ber", and in paragraph 6.5 that, "All ferrules must be broken off by the operator prior to inspection".

Contrary to the above, on. January 14, 1981 on the southside of Un;t 5 elevation 362', the inspectors observed the following:

(1) A stui welding operator welding on a member between columns Nos. CA-12 and CA-13 had welded approximately sixty studs without bending the first two studs.

(2) A number of studs were found which were bent, but had not received 'the necessary paint mark. It was later discovered that the Quality Control Inspector had been marking the studs, not the operator.

(3) Numerous studs were found with parts of the ferrules still in pl ac e. These studs had been inspected and accepted by the Morrison-Knudsen Quality Control Inspector.

This is a Severity Level V violation.

Corrective Steps Which Have Been Taken And The Results Achieved.

A training session on Morrison-Knudsen procedure AI-15, revision 2 was conducted on January 15, 1981. This session emphasized the requirements for removal of ferrules and the operator marking of the first two studs bent. Applicable Quality Control inspectors and construction personnel were in attendance. Morrison-Knudsen construction was directed to remove all ferrule material in placement ABS 017 362.5 prior to placing rebar.

The removal of this material will be documented on Morrison-Knudsen form QC-19. -

Construction personnel have been issued direction concerning the marking of studs bent by the operator.

Corrective Steps Which Will Be Taken To Avoid Further Items of Noncompliance:

The additional training conducted on January 15, 1981, supplemented with

,s . s .

written direction to construction supervision on January 15, 1981 should preve

  • recurrance.

The ' .. When Full Compliance Will Be Achieved:

Full compliance was achieved on. January 27, 1981.

W 9

D.E. DOBSON, Being first duly sworn, deposes and says: That he is the Acting Program Director, WNP-3/5, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the fore-going and knows the contents thereof; and believes the same to be true to the best of-his knowledge.

' DATED d 9 E6c.mru , 1981.

)

h-D.E. DOBSON

' STATE OF WASHINGTON )

) ss COUNTY 0F GRAYS HARBOR)'

~

. On. this day personnally appeared before me D.E. DOBSON to me known to

~

s be t ' individual who executed the foregoing instrument and acknowledged th igned the same as his free act and deed for .the uses and purposes tu. .. mentioned.

- GIVEN under my hand' and seal this eM day of. , E.lyvow , 1981.

z. c. . .s . ., ,

4 J A D.

j N.

[

Notary Public in and for the State of Washington j , Residing at bra

\ ;,6

.sc

e

~'

u . __

.'- -pii

{ ,

s

.~

M w '( .h u - *! '- - 'wj* ,- E $ J ty - -

mn .

, . =: . . :w_ / + . . , . m we c . y -

Q

~

e . :_ - - n ' 1 MacLa

. _;g  : ,1 . .