05000302/LER-1980-057-03, /03L-0:on 801218,seal Matl Fabricated from Nonapproved Matls Found Installed in Approx 13 Hydraulic Snubbers.Caused by Failure to Identify Nonconforming Matls in Receiving Insp.Personnel Received Training

From kanterella
(Redirected from ML20002D923)
Jump to navigation Jump to search
/03L-0:on 801218,seal Matl Fabricated from Nonapproved Matls Found Installed in Approx 13 Hydraulic Snubbers.Caused by Failure to Identify Nonconforming Matls in Receiving Insp.Personnel Received Training
ML20002D923
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/19/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20002D919 List:
References
LER-80-057-03L, LER-80-57-3L, NUDOCS 8101230455
Download: ML20002D923 (2)


LER-1980-057, /03L-0:on 801218,seal Matl Fabricated from Nonapproved Matls Found Installed in Approx 13 Hydraulic Snubbers.Caused by Failure to Identify Nonconforming Matls in Receiving Insp.Personnel Received Training
Event date:
Report date:
3021980057R03 - NRC Website

text

.

. w:.

u m::av ::w.:.2.c o.m l

' t.lCENSEG EVENT RE.:CRT EXHlalT ;

,]

cour:':L stcco l I

l l

l l

trtras mmr ca Tvre At'.are: r:so s~romanens v

lo Iii 17 i LI Q Rl ?! 3 Igl 010-l-l 010l 0 l 0l 0 l -l0 g 0lgg 4 l I 1. gl l 1 g[ -;.; g g

g c ~..c==.

a mum,-...

a a

,, m CON **

,.,g Qg[ 0 i 5101 -10131012 gi 2 r 1 18 : 8: 0 @l Oi il 11 9' 81 7

l losil 1l!@ -

?

4 ee cocasr %v. sa.

se a n =r :.r3 ra s

o s.;a r :.r t s

IVINT ciscasPTICN A.NQ 'mCS A3LZ CONstC JENCIS Otc go,:, [ At 0830 during normal operation it Ms discovered that seal material fabricated from g,non-approved materials' had been installed in approximately thirteen (13) hydraulic

.,,,3, i

go..j isnubbers. This created an event contrary to T.S. 3.7.9.1.

There was no effect upot Io # s i i the health or safety of the general 'public. This was the first occurrence of non-t

,,,,,, approved seal material and the third event reported under this specificatior.

lo a rl i f

s c ia ! I I

r es y

'un"

  • t:W J.'N'.
  • m in, zl Zi@ l A l@ [X J@ [S IU i P i 0 i R I T [@ @@ c$"@,

c:..c,ist::=.

ioi.i i

=

"#e'nW

      • E!s'*

M

"' ;'f *'

@,a'g.

,w r-u.

t-J 1085171 1-I 1013!

W I!

101 u

1.8101 u

u u

v u

.= =

et.':m, ww

.., @ m:n1:.;;.x,

,~.w

..c=:.,;c:,.

LLl@L&J@

. %. @ p @

1,0101010I I Yl@

l l A l@

lPI3l117l(

IN l u

a

~

csusx ctscansven sn c:ans:nvs.scucns :s t

,o,1 The cause of th'is event is attributed to failure to identify nonconforming materialg g,,,,, in the receiving inspection. The material properties have been identified; NRC I' f.1J l, approval has been obtained; operability was restored at 1700 on 12/19/80.

The I

,,,, gehls will be replaced during the next refuelling outage.

Quality Operating Pro-g cedures have been revised to improve control.

Personnel have received training.

t 8 9 5

% Ot*

CTJg. sT.T*,:s a v' s

.gggy gn, ;g3cy.
g, Ii i s i (Ej@ l 01 918 l@l NA J

[ Z l@l Engineering review I

r 5,&,,,,,

ejd.,,,

'J

=

e i.

l ' I

  • l ll ] @e. ruurl.ZJ@l

...ws, e..m r @ l im,,ose....,o,@

..uu.

NA

[

NA l

,s.sossden.c.Su l i t r i 101010 l@[Z,J@l :::.. e,@ NA l

  • ',,..:%,'6,m'!.u
- D*

9 1

d Ib

n: -es@

M JQ #

w -se.

T1 I, i r l 1010101@l NA me 6

l r

eo W.',** *"?@i.'R "" @

a l: (. I l Z l@l NA-l IeI[JLf@1,;....,@

~ e use mv l

NA I 'lIIIIIIII8 II I I:

"Name of Preparer:

]

[g' ')*

l 8 ]() y g pg (SEE AITAr:TM SUPPI.D'EC.GI IN70FFEICN 5--- 4

SUPPLEMENTARY INFORMATION

)

Report No.:

50-302/80-057/03L-0 J

Facility:

Crystal River Unit 3 Report Date:

January 19, 1981 Occurrence Date:

December 18, 1980.

Identification of Occurrence:

Failure to use approved seal material in snubbers contrary to Technical Specification 3.7.9.1.

Conditions Prior to Occurrence:

Mode 1 p<m 3roperation(98%).

Description of Occurrence:

At 0830 during normal operation it was discovered that approximately thirteen (13) snubbers had 0-rings installed that were not fabricated from ethylene propylene or other approved material.

Designation of Apparent Cause:

The cause of this event is attributed to failure to identify nonconforming materials in the receiving inspection.

Analysis of Occurrence:

There was no effect upon the health or safety of the general public. The snubbers were determined to have Buna-N 0-rings installed. The material in the 0-rings was evaluated to be compatible with the operating environment.

Corrective Action

A letter requesting approval of the Buna-N seal material for use until the fall 1981 refuelling outage was sent to the USNRC. Approval was granted; operability was restored at 1700 on December 19, 1980. The seals will be replaced during the next refuelling outage. Quality Operating Procedures have been revised to improve control. Personnel have received training.

Failure Data:

This was the first occurrence of non-approved seal material and the third event reported under this Specification.

/rc