jo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

)

o

$

REGION ll

g

g

o,

,[

101 MARIETTA sT

N.W., SUITE 3100

g

ATLANTA, GEORGIA 30303

SEP 171980

In Reply Refer To:

RII:TCM

-

50-321/80-32

50-366/80-32

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

'

This refers to the inspection conducted by T. C. MacArthur of this office on

July 31, 1980. A shipment of radioactive waste from your Hatch facility was

inspected upon arrival at the Chem-Nuclear Systems, Inc. , Barnwell, SC disposal

site.

Areas examined during the inspection and our findings are discussed in the

enclosed Inspection Report. Within these areas, the inspection consisted of a

review of the shipping papers, placarding and labeling requirements, radiation

measurements, selective contamination surveys, and observation by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Loom.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

.

that proprietary information identified in the application is ec"ained in a

separate part of the document. If we do not hear from you in thu regard within

the specified period, the report will be placed in the Public Document Room.

P 1010 7033Ih

.

.. - .

.

'

SEP 171980

'

.

Georgia Power Company

-2-

A

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

.

~

(

P ilip S

hr, Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/80-32

and 50-366/80-32

cc w/ encl:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation