05000348/LER-1980-062-03, /03L-0:on 801017,diesel Generator Failed to Reach Rated Voltage within Tech Spec Time Limit,Voltage Could Not Be Controlled from Emergency Power Board & B1F Sequencer Step Six Was Below Setpoint.Cause Not Determined

From kanterella
(Redirected from ML20002A775)
Jump to navigation Jump to search
/03L-0:on 801017,diesel Generator Failed to Reach Rated Voltage within Tech Spec Time Limit,Voltage Could Not Be Controlled from Emergency Power Board & B1F Sequencer Step Six Was Below Setpoint.Cause Not Determined
ML20002A775
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/17/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20002A771 List:
References
LER-80-062-03L, LER-80-62-3L, NUDOCS 8011210512
Download: ML20002A775 (1)


LER-1980-062, /03L-0:on 801017,diesel Generator Failed to Reach Rated Voltage within Tech Spec Time Limit,Voltage Could Not Be Controlled from Emergency Power Board & B1F Sequencer Step Six Was Below Setpoint.Cause Not Determined
Event date:
Report date:
3481980062R03 - NRC Website

text

_ __ _ __ _

w cime cv en i nervn.

CONTROI. BLOCX: l l

\\* l l

l (Pt. EASE PRINT 02 TYPE ALL REQUIRE 3 INPCIMATIONS l-l 0l 0l g 4 [1 l1 l1 l1 g l

l (oltllAlLlJJMlFl1 Ql0l0 l -l 0 l 0 l 0 l 0

)

3 3 UCt's544 Coat 14 15 ucthsa.eumdai4 45 26 uc1NSA TYPE JG, S2 C f 34 con T g

Q'Cg l L @l 0 l 5 i 0 l 0 l 0l 3 l 4 l 8 g[ 1 l0 l1 [7 l8 l0 Jgl 1 l 1 l 1 l 7 l 8 l0 !@

7 8

60 65 coex5T Numet A 64 G3 (VENT oATE 74 75 REPORT cA(E 80 EVENT CESCRIPTION AND PROSASLE CONSEQUENCES h

. I o 12 j l At 091.0 on.10/17/80, while performing FNP-1-STP-28.2'(Diesel Generator 1-2A Operability j g l Test) the diesel generator failed to reach rated voltage within the Tech. Spec. time f-- g o,.,, l 11mit~of E10 seC, voltage coold not. be controlled from the Emergency Power Board (EPB),

g land B1F' sequencer step 6 was below Tech. Spec. 3.8.1.1 setpoint. Tech. Spec. 3.8.1.1 lol6l l requij"J'3, tWo separate and independent diesel generator sets o be operable. Tech. Spec.

, a,, y l 3.8.1.1. action 's catement.. requirements were met.

The, health / safety of the public were i

10 6 81 l not af fected. -

2 ss

.e sysrum causs. __ causs._._

_ccuponaNT eoos sueco.s suecoce __

coup.

. vatve caos coon suscoes 10191 l 5 l E l@ ~]@ l Z l@ lX l Xl X l X l X (X Jh l X l@ lZ l@

7 4

s to 13 e 12 13 18 19

.N E

SEQUENTIAL

. ' OCCURRENCE REPoMT MEVIStoM tan,Ro svaurvram RePoRr ua.

coce wPe

@ Reg l 8l 0l l_ l l0 l6 l2 l lyl l0 l3 l lLl g

ggo.

25 22 23 24 24 27 23 29 30 21 32 N

ON O P r

M MouR$

3 8 PoM 8.

U EA ".

MA A

REM Qdh dh Wh l0 l0 10 l0 l

[_N_j@

IN l@

l Z l@

lz l9 l9 l9 32 J4 33 -

26 3J 40 48 42 43 44 4;

CAUSE CESCRIPTION AND CORRECTIVE ACTIONS l t t o I l The voltage regulator was looked at to determine the cause. No indication for the loss g lof. voltage control could be determined. The diesel was restarted and control of the

.,,,7, l voltage was confirmed. The B1F step 6 agastat relay time setpoint had drifted below

,_,,,3, [ the Tech. Spec setpoint. The agastat relay was adjusted and D.G. 1,2A was r.eturned '

,,,,,, l to service at 1600 on 10/17/80 after successful completion of.FNP-1-STP-28.2.

7 ss so STAT

  • LPoWER OTHER status el RY alSCcVERY oESCatPTioM 11 151 l f.,jh II l 0 l0 lh!

NA l

lB lhlPerfortanceofSurveillanceTest s Envin c5 Taur 7

A l5 l6 l d h Whl Aucuaron AcitvirY h l LocAriom on Rei. sass.h~

RetsAsso op ast.sasa NA l

NA

(

F S 9 to 11 44 45 SO PER$oNNEL EXPOSURES NuastER TYPE oEscalPT10M i1 I il I 01 0 l O l@l Z l@l NA l

' ',iR5o~d'ium'J,.s

@ l 0l 0 l Ol@l sseninfionh wuweeR e

NA l

7 s9 11 82 Loss cP oft oAmaGE To PActuTY to TYPE etSCRirfloN lt' E l Zl@ l NA l

7 4 9 to go 113uf

& CAIPT1oM L

g lN l

NA

[

llllllllll ll l 3U' W. C. Hairston, III (205f899-SI56

,NAME OF PREPARER Pt(@Nrb