ML19354E846
| ML19354E846 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 01/19/1990 |
| From: | GENERAL PUBLIC UTILITIES CORP. |
| To: | |
| Shared Package | |
| ML19354E845 | List: |
| References | |
| NUDOCS 9002020032 | |
| Download: ML19354E846 (1) | |
Text
s I
I TABLE 4.13-1 ACCIDENT MONITORING INSTRUENTATION SURVEILLANCE REQUIREMENTS 4
CHANNEL CHANNEL INSTR 0ENT CHECK CALIBRATION 1.
Primary and Safety Valve Position A
B i
Indicator (Primary Detector *)
+
Reitef and Safety Valve Position A
8 l
Indicator (Backup Indications **)
Relief Valve Position Indicator C
B (Connon Header Temperature El ement** )
2.
Wide Range Drywell Pressure Monitor A
D i
(PT/PR 53 4 54) 3.
Wide Range Torus Water Level Monitor A
0 (LT/LR 37 4 38) l 4.
Drywell H2 Monitor Al E
5.
Containment High Range Radiation A
F *"
Monitor
- 6.
High Range Radioactive Noble Gas l
Effluent Monitor i
t.
Main Stack A
F b.
Turbine Building Vent A
F l
\\
Legend:
A = at least once per 31 days B = at least once per _18 months (550 days)
C = at least once per 15 days until channel calibration is performed and thence l
at least once per 31 days I
O = at least once per 6 months l
E = at least once per 12 months F = each refueling outage 1 = Span and Zero using calibration gases i
Acoustic Monitor Thermocouple i
Channel calibration shall consist of electronic signal substitution of the channel, not including the detector, for all decades above 10R/hr and i
a one point calibration check of the detector at or below 10R/hr by _means of a calibrated portable radiation source traceable to NBS.
OYSTER CREEK 4.13-2 Amenenent No: 54,88,94,116, 9002020032 900119 PDR ADOCK 05000219 P
PDC I
9
,-,,w-.a-.
... ~, -
L