ML19354D850

From kanterella
Jump to navigation Jump to search
Revised Unit Shutdowns & Power Reductions Page for June 1989 for Crystal River Unit 3
ML19354D850
Person / Time
Site: Crystal River 
Issue date: 06/30/1989
From: John Lane
FLORIDA POWER CORP.
To:
Shared Package
ML19354D848 List:
References
NUDOCS 9001220263
Download: ML19354D850 (1)


Text

,

.uai UNIT SHUTDOWNS N W POWER REDUCTIONS-

's a

900ET 50.

50-302 s*-

HEIT NUE flatP-3

' ' ~

E REPORT MONTH JUNE (REV. 2)

- eart 1/3/9e CINFLETED BY J. E. EM TELEPMDRE 1908) 195-6886 7JT34 CO 73 0 h

No.

Gate Type' Durat ion Reason

  • Method of Licensee Systeer Cemy'onent Cause & Corrective DN Hours Shutting Event Code
  • Code Actlen to Prevent D

Doun Reactor Report #-

8 66 7,0) oc

< no 89-06 890226 48.9 A

4 m/A CB FijMFXX Continuatten of outece to investigete and 6o o-repair Reactor Coolant Pumps A. B. and C.

"U O -

OWN 89-06a 890603 F

359.1 A

4 W/A CB PUMPXX At the end of the scheduled outag*. the Reactor Coolant Pumps forced the plant to remain off-line to repelr the shaft seals.

09-07 8906E6 F

0.0 A

5 N/A CH VALVEX Reduced load to approximately 50% full power to repair a steam leak on Turbine Drain Valve 23.

89-08 890630 F

38.0 D

1 89-025 EE ENGINE Emergency Diewi Generator was declared inoperable per Tech. Specs. due to low crankcase vacuum. The ble=er and turbocharger were replaced.

s z

s e

s F: Forced.

Reason:

Mathed Exhibit 6 - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Auto Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training &

5-Reduced load License Eramination F-Adninistrat tve 9-Other 6-Operational Error (Explain)

H-Other (Explain)

.. -.--..