OPERATING DATA REPORT DOCKET NO.
50-302 DATE 12-5-89 COMPLETED BY J. E. Lane TELEPHONE (904)563-4485 OPERATING STATUS 1.
UNIT hAME:
CRYSTAL RIVfR UNIY 3 i
i
! 2 '.
REPORTING PERIOD:
December 1-31. 1989 l NOTES:
l 3.
LICENSED THERMAL POWER (HWt):
2544 l_
l
- 4.
. NAMEPL7TE RATING (GROSS MWe):'
890
-l l
~
'.S.
DESIGNELECTRICALRATING(NetMWe):
825 l
l
- 6, MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
860 l
l 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe);
B21 8,'
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.
POWER LEVEL TO VHICH RESTRICTED, IF ANY (NET MWe):
516 MWe from 11/30/89 thru 12/7/89 10.
_ REASONS FOR RESTRICTIONS, IF ANY: Control Rod 3-2 became unlatched and inserted into the core causino an automatic runback to 60% cower.-
THIS MONTH YR. TO DATE CUMULATIVE M
11.
HOURS IN REPORTING PERIOD 744.0 8760.0 112.248.0 12. -
NUMBER OF HOURS REACTOR WAS CRITICAL 693 3 4274.4 71.057.7 13.
REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6 14,
. HOURS GENERATOR ON-LINE
'684.6 4193.3 69.586.7 15.
UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.
GROSS THERMAL' ENERGY GENERATED (MWH) 1.467.G21 9.140.572 156.657.536
- 17.
GROSSELECTRICALENERGYGENERATED(MWH) 500.595 3.090.497 53.528.167 18.
NET ELECTRICAL ENERGY GENERATED (MWH) 473.240 2.929.990 50.831.632 19.
UNIT SERVICE FACTOR 92.0%
47.9%
62.0%
20' UNIT AVAILABILITY FACTOR 92 0%
47 9%
62.0%
21.
UNIT CAPACITY FACTOR (Using MDC net) 77.5%
40.7%
56.3%
22.
UNITCAPACITYFACTOR(usingDERnet) 77.1%
40.5%
54.9%
23.
UNIT FORCED OUTAGE RATE 0.0%
28 3%
21.5%
24.
SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (Type Date, and Duration of Each):
Refuelino Ou'.aae Vil: start 3/14/90. duration of 74 days.
25,1 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED OATE OF STARTUP:
26.
~ UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9001220262 900112 PDR ADOCK 05000302 R_
3.~-
.s i
MONTHLY OPERATIONAL
SUMMARY
STATEMENT I
DOCKET NO.
50-302 UNIT FLCRP 3
)
Ot.TE J1 3-90 T
COMPLCTED BY J. E. tene TIL[ PHONE
[9041 795-t 4BB l
i
, MONTH __ DECEMBER
]
)
SUMMARY
$TATEMENT:
- The plant experienced an automatic ruaback on 11/30/89 to less than 607 power when a control rod was' inserted into-the core.
The plant ran at reduced power until 12/7/89 at which time the plant was shut down to repair the problem. The plant returned to service on 12/10/89 but had to reduce power on 12/12/89 to repair a broken shear pin in the Amertap debris filter.
During. normal operation, plant-output was limited due to low circulating water flow causing
. condenser delta-T restrictions.
t t
h t-
r y -- -
q.-
i e
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
! D-30?
(MIT
.ftCRP 3 Daft 01 3-90 COMPLETED BY J. Pink owsk i g
I TELEPHONE f 904) %3-44P5 MONTH-DECEMBER i
t DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net) 1 399 17 814 2
397 18 817
-3 398 19 815 4
407 20 816 5
4; O 21 808 6
423 22 808
-7 359 23 808 8
0 24 813 9
0 25 805 10 110 26 815 11 715 27 820
-12 722 28 823 13 734 29 811 14
-798 30 804 15 829 31 836
- 16 806
- -INSTRUCTIONS:
I On this format, list the average daily unit power level in MWe-Net for each day in the
-reporting month.
Compute to the nearest whole megawatt.
1
UNIT SHUTD0 tris Als POWER REDUCTIONS socxtT me.
So-3er IMITIWWE flatP-3 i
REPORT NOMTH DECDBER ontt uvse CourLETED BY J. E. IJK TELFPMDEE (spel 155-6486 No.
Date Type' Duration Reason Method of Licensee Systems r._~..".
Cause & Corrective 2
Hours Shutting Event Code
- CoM Action to Frevent 8
Doun Reactor ileport #
89-13 891130 F
D.0 A
4 N/A RB CRORVE Automatic ruc4mck to less tNm 50% me ter Tectmical Secifications when control rod 3-2 became uniatched end inserted into the cere.
89-14 891207 59.4 B
1 m/A RB CRDRVE the plant was taken off-itne to repair a failed stator on control red 3-2.
89-15 891212 S
0.0 B
5 N/A HF FILTER Reduced load to replace a sheer pin in the 5
"D" water ben Amrtap detels filter.
1 1
s e
s F: Forced Reason:
Method Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets.for Licensee C-Refueling 3-Auto Scram Event Report (LER) Flie D-Regulatory Restriction 4-Continued (N'JREG-0161)
E-Operator Training &
S-Reduced toad License Examination F-Administrative 9-01her G-Operatlonal Error (Erplain)
H-Other (Erplain) c.._
LMIT SHUTDOWNS MW' POWER REDUCTIONS socxrT mo.
so-3s2 tpITluut FlatP-3 REPORT NONTH DECEMBER onTt U3/se CtpFLETED BY J. E. LAK TELEPMoNE 1904) 195-6486 No.
Date Type' Duration Weason*
Nethod of Licensee System Cemyonent Cause & Corrective Hours Shutting Event Code
- Cbde' Action to Prevent Doun Reactor' Report #
89-13 891130 F
0.0 A
4 N/A RB C4DRVE Automatic runbeck to less then 60% power per Technical Specif icat ions when control rod 3-2 became uniatched and inserted into thecore, 89-14 891207 5
59.4 8
1 ft/A RB CRDRVE The plant was taken off-line to repair a failed stator en control red 3-2.
89-15 891212 5
0.0 B
5 N/A HF FILTER Reduced load to replace a shear pin in the "D* water box Arnertap debris filte.
I 2
3 4
5 F: Forced Reason:
Method Exhibst G - Instructions Exhibit ! - Sa m Source S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry $ beets.for Licensee C-Refueling 3-Auto Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-C161)
E-Operator Training f.
5-Redred Lead License Examination F-Administrative 9-Other G-Operational Error (Explain)
H-Other (Explain) a