OPERATING DATA REPORT DOCKET NO.

50-302 DATE 12-5-89 COMPLETED BY J. E. Lane TELEPHONE (904)563-4485 OPERATING STATUS 1.

UNIT hAME:

CRYSTAL RIVfR UNIY 3 i

i

! 2 '.

REPORTING PERIOD:

December 1-31. 1989 l NOTES:

l 3.

LICENSED THERMAL POWER (HWt):

2544 l_

l

4.

. NAMEPL7TE RATING (GROSS MWe):'

890

-l l

~

'.S.

DESIGNELECTRICALRATING(NetMWe):

825 l

l

6, MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

860 l

l 7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe);

B21 8,'

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

N/A 9.

POWER LEVEL TO VHICH RESTRICTED, IF ANY (NET MWe):

516 MWe from 11/30/89 thru 12/7/89 10.

_ REASONS FOR RESTRICTIONS, IF ANY: Control Rod 3-2 became unlatched and inserted into the core causino an automatic runback to 60% cower.-

THIS MONTH YR. TO DATE CUMULATIVE M

11.

HOURS IN REPORTING PERIOD 744.0 8760.0 112.248.0 12. -

NUMBER OF HOURS REACTOR WAS CRITICAL 693 3 4274.4 71.057.7 13.

REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1.280.6 14,

. HOURS GENERATOR ON-LINE

'684.6 4193.3 69.586.7 15.

UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.

GROSS THERMAL' ENERGY GENERATED (MWH) 1.467.G21 9.140.572 156.657.536

- 17.

GROSSELECTRICALENERGYGENERATED(MWH) 500.595 3.090.497 53.528.167 18.

NET ELECTRICAL ENERGY GENERATED (MWH) 473.240 2.929.990 50.831.632 19.

UNIT SERVICE FACTOR 92.0%

47.9%

62.0%

20' UNIT AVAILABILITY FACTOR 92 0%

47 9%

62.0%

21.

UNIT CAPACITY FACTOR (Using MDC net) 77.5%

40.7%

56.3%

22.

UNITCAPACITYFACTOR(usingDERnet) 77.1%

40.5%

54.9%

23.

UNIT FORCED OUTAGE RATE 0.0%

28 3%

21.5%

24.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (Type Date, and Duration of Each):

Refuelino Ou'.aae Vil: start 3/14/90. duration of 74 days.

25,1 IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED OATE OF STARTUP:

26.

~ UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9001220262 900112 PDR ADOCK 05000302 R_

PDC

3.~-

.s i

MONTHLY OPERATIONAL

SUMMARY

STATEMENT I

DOCKET NO.

50-302 UNIT FLCRP 3

)

Ot.TE J1 3-90 T

COMPLCTED BY J. E. tene TIL[ PHONE

[9041 795-t 4BB l

i

, MONTH __ DECEMBER

]

)

SUMMARY

$TATEMENT:

The plant experienced an automatic ruaback on 11/30/89 to less than 607 power when a control rod was' inserted into-the core.

The plant ran at reduced power until 12/7/89 at which time the plant was shut down to repair the problem. The plant returned to service on 12/10/89 but had to reduce power on 12/12/89 to repair a broken shear pin in the Amertap debris filter.

During. normal operation, plant-output was limited due to low circulating water flow causing

. condenser delta-T restrictions.

t t

h t-

r y -- -

q.-

i e

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

! D-30?

(MIT

.ftCRP 3 Daft 01 3-90 COMPLETED BY J. Pink owsk i g

I TELEPHONE f 904) %3-44P5 MONTH-DECEMBER i

t DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)

(MWe-Net) 1 399 17 814 2

397 18 817

-3 398 19 815 4

407 20 816 5

4; O 21 808 6

423 22 808

-7 359 23 808 8

0 24 813 9

0 25 805 10 110 26 815 11 715 27 820

-12 722 28 823 13 734 29 811 14

-798 30 804 15 829 31 836

16 806
-INSTRUCTIONS:

I On this format, list the average daily unit power level in MWe-Net for each day in the

-reporting month.

Compute to the nearest whole megawatt.

1

UNIT SHUTD0 tris Als POWER REDUCTIONS socxtT me.

So-3er IMITIWWE flatP-3 i

REPORT NOMTH DECDBER ontt uvse CourLETED BY J. E. IJK TELFPMDEE (spel 155-6486 No.

Date Type' Duration Reason Method of Licensee Systems r._~..".

Cause & Corrective 2

Hours Shutting Event Code

  • CoM Action to Frevent 8

Doun Reactor ileport #

89-13 891130 F

D.0 A

4 N/A RB CRORVE Automatic ruc4mck to less tNm 50% me ter Tectmical Secifications when control rod 3-2 became uniatched end inserted into the cere.

89-14 891207 59.4 B

1 m/A RB CRDRVE the plant was taken off-itne to repair a failed stator on control red 3-2.

89-15 891212 S

0.0 B

5 N/A HF FILTER Reduced load to replace a sheer pin in the 5

"D" water ben Amrtap detels filter.

1 1

s e

s F: Forced Reason:

Method Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets.for Licensee C-Refueling 3-Auto Scram Event Report (LER) Flie D-Regulatory Restriction 4-Continued (N'JREG-0161)

E-Operator Training &

S-Reduced toad License Examination F-Administrative 9-01her G-Operatlonal Error (Erplain)

H-Other (Erplain) c.._

LMIT SHUTDOWNS MW' POWER REDUCTIONS socxrT mo.

so-3s2 tpITluut FlatP-3 REPORT NONTH DECEMBER onTt U3/se CtpFLETED BY J. E. LAK TELEPMoNE 1904) 195-6486 No.

Date Type' Duration Weason*

Nethod of Licensee System Cemyonent Cause & Corrective Hours Shutting Event Code

  • Cbde' Action to Prevent Doun Reactor' Report #

89-13 891130 F

0.0 A

4 N/A RB C4DRVE Automatic runbeck to less then 60% power per Technical Specif icat ions when control rod 3-2 became uniatched and inserted into thecore, 89-14 891207 5

59.4 8

1 ft/A RB CRDRVE The plant was taken off-line to repair a failed stator en control red 3-2.

89-15 891212 5

0.0 B

5 N/A HF FILTER Reduced load to replace a shear pin in the "D* water box Arnertap debris filte.

I 2

3 4

5 F: Forced Reason:

Method Exhibst G - Instructions Exhibit ! - Sa m Source S: Scheduled A-Equipment Failure 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry $ beets.for Licensee C-Refueling 3-Auto Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-C161)

E-Operator Training f.

5-Redred Lead License Examination F-Administrative 9-Other G-Operational Error (Explain)