Forwards IE Insp Repts 50-317/81-03 & 50-318/81-03 on 810126-30 & Notice of Violation
ML19352B004
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/13/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19352B005 List:
References
NUDOCS 8106020544
Download: ML19352B004 (2)


See also: IR 05000317/1981003

Text

__ _

s

UNITED STATES

[p rtigD

NUCLEAR REGU'_ ATORY COMMisslON

o

$

'

o

REGION l

.

$

g

431 PARK AVENUE

f

MING OF PRU55t A PENNSYLVANIA 19404

y,AR 10 1531

,,,,,

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection Number 50-317/81-03 and 50-318/81-03

This refers to the routine safety inspection conducted by Mr. W. M. Troskoski of

this office on January 26-30, 1981 at Calvert Cliffs Nuclear Power Plant Units 1

and 2 Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and

DPR-69 and to the discussions of our findings held by Mr. W. M. Troskoski with

Mr. L. B. Russell of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

1

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, cnclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels described in the Federal Regisw Notice

(45 FR 66754) dated October 7, 1980.

You are required to respond to this letter

and in preparing your response, you should follow the instructions in Appendix

A.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of FederT1 Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Documer.t Room.

If this report contains any information

that you (or your contractor) believe ta be proprietary, it is necessary that

you make a written application within '20 days to this office to withhold such

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of reasons

!

which addresses with specificity the items which will be considered by the

Comission as listed in subparagraph (b) (4) of Section 2.790.

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

lo (o 6 3 0 5 %

Q

.

-

.

.

Baltimore Gas and Electric Company

2

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

" =E

n

Eldon J. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

Report Number 50-317/81-03 and 50-318/81-03

'

cc w/encls:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R.'C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services

s

(

)

1

r

t

._ , - . .

.-_ ,.._ _ _ , _