ML19352B004
| ML19352B004 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/13/1981 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Lundvall A BALTIMORE GAS & ELECTRIC CO. |
| Shared Package | |
| ML19352B005 | List: |
| References | |
| NUDOCS 8106020544 | |
| Download: ML19352B004 (2) | |
See also: IR 05000317/1981003
Text
__ _
s
UNITED STATES
[p rtigD
NUCLEAR REGU'_ ATORY COMMisslON
o
$
'
o
REGION l
.
$
g
431 PARK AVENUE
f
MING OF PRU55t A PENNSYLVANIA 19404
y,AR 10 1531
,,,,,
Docket Nos. 50-317
50-318
Baltimore Gas and Electric Company
ATTN: Mr. A. E. Lundvall, Jr.
Vice President, Supply
P. O. Box 1475
Baltimore, Maryland 21203
Gentlemen:
Subject:
Inspection Number 50-317/81-03 and 50-318/81-03
This refers to the routine safety inspection conducted by Mr. W. M. Troskoski of
this office on January 26-30, 1981 at Calvert Cliffs Nuclear Power Plant Units 1
and 2 Lusby, Maryland of activities authorized by NRC License Nos. DPR-53 and
DPR-69 and to the discussions of our findings held by Mr. W. M. Troskoski with
Mr. L. B. Russell of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
1
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, cnclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Regisw Notice
(45 FR 66754) dated October 7, 1980.
You are required to respond to this letter
and in preparing your response, you should follow the instructions in Appendix
A.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of FederT1 Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Documer.t Room.
If this report contains any information
that you (or your contractor) believe ta be proprietary, it is necessary that
you make a written application within '20 days to this office to withhold such
information from public disclosure. Any such application must be accompanied by
an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
!
which addresses with specificity the items which will be considered by the
Comission as listed in subparagraph (b) (4) of Section 2.790.
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
lo (o 6 3 0 5 %
Q
.
-
.
.
Baltimore Gas and Electric Company
2
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
" =E
n
Eldon J. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report Number 50-317/81-03 and 50-318/81-03
'
cc w/encls:
R. M. Douglas, Manager, Quality Assurance
L. B. Russell, Plant Superintendent
T. Sydnor, General Supervisor, Operations QA
R.'C. L. Olson, Principal Engineer
J. A. Tiernan, Manager, Nuclear Power
R. E. Denton, General Supervisor, Training and Technical Services
s
(
)
1
r
t
._ , - . .
.-_ ,.._ _ _ , _
_ . _ .
_
-.
. _ . _ . _ _ _ . _ , _ . _ _ - , _