| Site: | Sequoyah |
| Issue date: | 09/17/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19351E945 | List: |
| References | |
| NUDOCS 8012190576 | |
| Download: ML19351E947 (2) | |
See also: IR 05000327/1980030
Text
.
.
- O efpu:';o
'
UNITED STATES
-
,
8
%
NUCLEAR REGULATORY COMMISSION
$
- . E
REGION 11
A
o
101 MARIETTA sT., N.W., SUITE 3100
ATLANTA. GEORGIA 3o303
.....
In Reply Refer To:
SEP 171980
-
RII:TCM
50-327/80-30
50-328/80-17
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to an unannounced inspection conducted by T. C. MacArthur of this
office on July 29, 1980.
A shipment of radioactive waste shipped from your
Sequoyah facility was inspected upon arrival at the Chem-Nuclear Systems, Inc.,
Barnwell, South Carolina disposal site.
Areas examined during the inspection and our findings are discussed in the
enclosed Inspection Report. Within these areas, the inspection consisted of a
review of the shipping papers, placarding and labeling requirements, radiation
measurements, selective contamination surveys, and observations by the inspector.
During the inspection, it was found that certain activitles under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
80122s007/0
. .
_
.
.
.
is
'
Tennessee Valley Authority
-2-
SEP 171980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
~
.
d. Philip St hr, Chief
Fuel Facility and Materials
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-327/80-30
and 50-328/80-17
cc w/encls:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
'
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff