Forwards IE Insp Repts 50-259/80-28,50-260/80-21 & 50-296/80-22 on 800601-30 & Notice of Violation
ML19351E887
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/15/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19351E866 List:
References
NUDOCS 8012190499
Download: ML19351E887 (2)


See also: IR 05000259/1980028

Text

Rf

c uc

'o

UNITED STATES

\\

+

8

7g

NUCLEAR REGULATORY COMMISSION

o

A

REGION .1

,-

{

_ [E

o,

101 MARIETTA ST., N.W., SulTE 3100

p*

ATLANTA, GEORGI A 30303

In Reply Refer To:

AljG 1 51980

RII:RFS

50-259/80-28

50-260/g-21

50-296/80-22

-

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by R. F. Sullivan of thir office on

June 1 through June 30, 1980 of activities authorized by NRC Operat10g License

Nos. DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility, and to the ciscus-

sion of our findings held with H. L. Abercrombie or J. L. Harness at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection ccasisted af

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of tiirs-iertennd the enclosed inspection

report will be placed in the NRC's Public Document Roo:n. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

.

8e12190

'

_

.

-

.

,

.

Tennessee Valley Authority

-2-

AUG 1 51C30

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

s.

-

.-

S. C.

R. C. Lewis, Acting Chief

Nuclear Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-259/80-28

50-260/80-21, 50-296/80-22

cc w/ encl:

H. L. Abercrombie, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

,

%