Approves Reactor Operation at Full Power,Per Util Power Ascension Test Program & NRC Confirmatory Action Ltr CAL-86-10.Status of Emergency Preparedness for Communities Around Facility Per NRC Compilation to Commission Encl
ML19351A286
Person / Time
Site: Pilgrim
Issue date: 10/06/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bird R
BOSTON EDISON CO.
References
CAL-86-10, NUDOCS 8910190211
Download: ML19351A286 (25)


Text

y 1

t a s G

00T 8 6 1989 1

l Docket No. 50-293 Boston Edison Company ATTN:

Mr. Ralph G. Bird Senior Vice President - Nuclear i

L Pilgrim Nuclear Power Station RFD #1 Rocky Hill Road Plymouth, Massachusetts 02360 Gentlemen:

l

Subject:

Reactor Operation to Full Power c

+

References:

(1) Boston Edison Power Ascension Test Program, dated

(

August 31, 1988; updated October 27, 1988 (2) Confirmatory Action Letter 86-10 April 12,1986 and i

Supplements dated August 27, 1986 and December 30, 1988 This letter approves reactor operation at full power in accordance with Boston i

Edison Company's (BEco) Power Ascension Test Program and NRC Confirmatory Ac-i

' tion Letter 86-10 and its supplements. This letter neither imposes any new l

requirements nor releases Boston Edison from any existing requirements con-tained in the Facility License or Technical Specifications.

The staff finds that management performance, plant material condition, and operational perform-ance support proceeding to the next phase of the Power Ascension Program.

The bases for approving the continuation of the Power Ascension Program coe sist of: (1) successful completion of the Power Ascension Program up to 75%

power, (2) a comprehensive assessment of plant and personnel performan.e by BECo during this phase of plant startup, and (3) NRC staff inspection and re-t View activities which have confirmed the safety of operations by both the staff and management of BECo during this phase of plant startup.

Enclosure ] is a i

summary of NRC findings which either have been or will be docketed in more de-tail in NRC Inspection Reports 50-293/89-08 and 89-10.

The most recent inspec-tion activities by the NRC Restart Staff monitored and verified selected as-l pects of your power ascension activities, including your own management assess-i-

ments of the facility and personnel performance. Based upon our conclusion that the facility is being safely operated and satisfactorily managed, and is ready for the next phase of power ascension, the NRC has no objection to plant operation to full power.

l Additionally, the current status of emergency preparedness for the communities surrounding the Pilgrim Station as compiled by the staf f and reported to the Commission is shown in Enclosure 2.

We continue to encourage cooperative and l

OFFICIAL RECORD COPY BECO FULL POWER LTR - 0001.0.0 g93o19ont 891006 10/05/89

{DR ADOCK 0500[

[I

pn -

f,9..&

./

4-Boston Edison Company 2

OCT 6 s g l-expeditious action by Boston Edison and the Commonwealth and local governments to further improve the state of emergency preparedness for the area surrounding the Pilgrim facility.

I No reply to this letter is required.

Should you have questions, please contact the NRC Region I office promptly.

l Sincerely, f

j Original Signed By ilILL11.M T. IsUSSELI.

l William T. Russell Regional Administrator

Enclosures:

As Stated

' l cc w/encls.

K. Highfill, Station Director R. Anderson, Plant Manager J. Deitrich, Licensing Division Manager E. Robinson, Nuclear Information Manager

[

R. Swanson, Nuclear Engineering Department Manager The Honorable Edward J. Markey i

The Honorable Edward P. Kirby The Honorable Peter V. Forman The Honorable Lawrence R. Alexander i

The Honorable Nicholas J. Costello The Honorable John F. Kerry i

B. McIntyre, Chairman, Department of Public Utilities i

Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectn:en Plymouth Civil Defense Director P. Agnes, Assistant Secretary of Public Safety Commonwealth of Massachusetts S. Pollard, Massachusetts Secretary of Energy Resources R. Shimshak, MASSPIRG Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector t

Commonwealth of Massachusetts (2) 4

?

l.

l l

OFFICIAL RECORD COPY BECO FULL POWER LTR - 0002.0.0 30/05/89 i

~

e

+

Boston Edison Company 3

007 ## gg

'S i

.t bec w/ enc 1:

Region I Docket Room (with concurrences)

[

J. Taylor. EDO J. Dyer, EDO T. Murley, NRR S. Varga, NRR J. Partlow, NRR B. Boger, NRR R. Wessman, NRR D. Mcdonald, NRR M. Callahan, OCA J. Goldberg, OGC W. Russell, RI W. Kane, RI T. Martin, RI M. Knapp, RI Regional Counsel, RI S. Collins, RI i

J. Durr, RI R. Gallo, RI R. Bellamy, RI J. Johnson, RI 1

R. Blough, RI L. Kolonauski, RI B. Bores, RI i-W. Lazarus, RI M. Miller, RI C. Marschall, SRI - Pilgrim T. Kim, RI - Pilgrim C. Carpenter,,RI - Pilgrim R :DRP R

RP t :D P RI:DRA i

I slb Martin Russell Blough/meo Jchnsog' C

9/26/89 q19 q

OFFICIAL RECORD COPY BECO FULL POWER LTR - 0003.0.0 09/26/89 i

i.

+

ENCLOSURE 1 i

ASSESSMENT OF LICENSEE READINESS FOR RELEASE FROM NRC APPROVAL POINT NUMBER 5 PERMITTING OPERATION TO FULL POWER I.

Background

NRC Confirmatory Action Letter No. 86-10 of April 12, 1986 and the August 27, 1986 supplemental letter identified specific +.echnical issues to be resolved prior to facility restart.

In addition, due to other long-term management, hardware and program issues, Boston Edison Company (BECo) sub-mitted a formal power ascension program to the NRC. As specified in the licensee's NRC-accepted Power Ascension Test Program, the licensee must obtain the NRC Region I Regional Administrator's agreement to proceed be-yond the 75% NRC approval point to full power. The program includes NRC Regional Administrator approval points at 5%, 25%, 50%, 75% of full power, as well as requiring a licensee formal assessment and NRC review after completion of the Power Ascension Program, which includes tasting at full

power, By letter dated August 18, 1989, Mr. Thomas T. Martin, Acting Regional Administrator for NRC Region I, authorized BECo to proceed beyond the fourth approval point and conduct power operations up to 75% of full power. This enclosure provides the NRC Restart Assessment Panel's evalu-ation of licensee performance since the licensee's request for release from the fourth approval point.

II.

Chranology of Significant Plant Events August 18, 1989 Licensee received NRC agreement to proceed from fourth NRC approval point.

August 21, 1989 Licensee completed surveillance tests on the main turbine, turbir.e control /stop valves, turbine by-pass valves, main steam isolation valves and jet pump calibrations at 60% power and the plant sub-sequently reached 75% power.

August 24, 1989 The test program was completed at the 50% - 75%

power plateau as described in the August 31, 1988 Pilgrim Nuclear Power Station Power Ascension Program.

2 August 30, 1989 The reactor automatically scrammed on high reactor vessel pressure. A random component failure, possibly due to aging, caused the failure of a potential transformer associated with the main voltage regulator. This caused a turbine runback and a reactor scram due to high reactor vessel pressure. All safety systems responded as de-signed.

Sertember 6,1989 The Pilgrim plant was taken critical at 10:16 p.m.

Sep: ember 18,1989 The licensee presented results of the Power

,3 Ascension Progra:n at the 50%-to-75% power plateau to the NRC Pilgrim Restart Assessment Panel and requested approval to proceed from PATP Approval Point No. 5.

III. Staff Evaluation 1.

The NRC Restart Assessment Panel considered the following approval poirs release criteria to evaluate the conduct of the Pilgrim Power Ascension Test Program and consider approval of the licensee's con-tinuation of power ascension up to full power:

a.

Plant status and equipment operability b.

Management /persontiel performance and oversight activities c.

Power Ascension Testing Program adequacy d.

Power Ascension Test Program results e.

NRC inspection coverage and program status 2.

Staff assessment of licensee performance is as follows:

a.

Plant Status and Equipment Operability The licensee has determined and the NRC is satisfied that all equipment required for continuation of the Power Ascension Pro-gram is operable. When equipment inoperabilities have occurred, the licensee has generally handled them conservatively and with-in Technical Specification requirements.

Required non-safety-related equipment is in a condition that supports safe plant operation.

Surveillance tests are up-to-date with no signi-ficant identified discrepancies.

The licensee's management re-view of facility operation up to seventy-five percent power is complete. Operation of the facility was conducted in a safe manner and concerns raised by the NRC and BECo management re-garding facility operations were appropriately addressed.

+

3 On August 30, 1989, while the reactor was at about 75 percent power, a potential transformer associated with the main voltage regulator failed. This caused a turbine runback and a reactor scram due to reactor vessel high pressure.

The root cause of l

the potential transformer failure was determined to be a random component failure, possibly age related. The failure of the l

potential transformer caused the voltage to the electrical grid and to the Unit Auxiliary Transformer to rise and exceed 115% of

)

the normal operating voltage.

The licensee replaced the poten-1 tial transformer and performed electrical testing of the main generator, main transformer and those safety-related loads that were running on the buses at the time. The licensee's correc-tive actions with respect to this transient were appropriate, t

Thorough rost cause analysis demonstrated that safety-related i

equipment did not exceed the maximum voltage requirements of the equipment.

As discussed in the previous NRC Approval Point Release Memo for release to 75% power, the licensee continues to experience con-denser biofouling problems, necessitating routine power reduc-tions for thermal backwashing at a frequency of approximately i

once per week.

l In summary, the NRC Re' start Assessment Panel is satisfied that all equipment required for continuation of the Power Ascension Program is operable.

b.

Management / personnel Performance and Oversight Activities The NRC Restart Staff has continued to monitor management and personnel performance on an as-needed, around-the-clock basis since startup. BECo management has been found to be generally responsive to NR0 concerns and to perform in a cautious, de-liberate manner.

Licensee peer evaluators were observed and have been providing good feedback to plant personnel. Operators l

were generally knowledgeable of their duties and plant condi-tions and management maintains an active and effective oversight j

of operations.

The licensee has recognized that there were several lapses of performance during this plateau.

These fell into two areas, each with two examples.

The first area involved initial slow-ness, with NRC questioning required, to fully analyze the poten-tial for effects on safety related equipment of the following:

(1) The overvoltage transient resulting from the voltage regu-lator failure of August 30, and (2) A licensee finding that holddown bolts on a spent fuel pool cooling pump has, at some unknown time in the past, been filed down to less than nominal diameter.

7

l 1

4 j

The second area of performance lapse involved failure to follow f

procedures as follows:

(1) During inspection of holddown bolts on a sampling of pumps in response to the bolting concern addressed above, one 1

maintenance team overtorqued bolts during reinstallation, and l

(2) An effluent release was approved even though computer cal-culations indicated the release did not meet procedural limits for discharge.

(Actually, a data entry error had occurred and effluent radicactivity was well within limits.)

l In each case, the licensee's eventual response was thorough and i

included appropriate reviews, evaluations, and physical inspec-tions.

In addition. the licensee conducted an expanded self-l assessment before approaching the NRC Restart Assessment Panel to propose release from the 75% approval point.

Evaluations by line management, peer evaluators, and Quality Assurance person-nel, as reviewed by the Management Oversight and Assessment Team (MOAT), indicated that progress is being made on areas pre-viously identified as needing management attention but addi-tional emphasis is warranted in several areas, including strict procedural compliance, attention to administrative details, and l

some aspects of the corrective action process (clearinghouse).

The licensee also believes that some recent organizational changes will accelerate progress in some areas. These changes include (1) creation of a Vice President - Nuclear Administra-tion position under a recently-hired former Navy Admiral, and (2) elevation of the Regulatory Affairs organization to full department level with full-time representative on the MOAT.

The Panel has reviewed the above issues and licensee evaluations and determined that (1) appropriate actions were taken in re-sponse to individual events and (2) the licensee continues to t

aggressively pursue a consistently high level of performance.

The NRC Restart Assessment Panel has concluded that the licensee management and plant staff performance support proceeding to full power.

The licensee's performance will continue to be re-viewed during the full power plateau of the Power Ascension Test Program (PATP). Also, the NRC Restart Staff will evaluate an upcoming mid-cycle outage, as well as the licensee's return to power following that outage.

The NRC Restart Assessment Panel will review the results of the Restart Staff inspections and will evaluate the licensee's PATP final assessment report in conjunction with panel deliberations regarding potential final closure of Confirmatory Action Letter 86-10.

5 l

i c.

Power Ascension Testing Program Adequacy i

The licensee's Power Ascension Test Program continues in accord-i ance with the licensee's commitments documented in the December 30, 1988 supplement to Confirmatory Action Letter 86-10. No l

significant problems or technical issues are outstanding as a t

result of implementing this program.

By letter dated July 12, 1989, the licensee indicated intent to defer the second phase of the Shutdown from Outside the Control Room Demonstration from its originally scheduled test plateau (50%) to the Fall 1989 maintenance outage. The staff found this approach acceptable and documanted staff agreement in a letter to the licensee on August 18, 1989.

l d.

Power Ascension Test Program Results L

The NRC is satisfied that tests and conditions required to be completed by the licensee during performance of the NRC-accepted Power Ascension Program up to 75 percent of rated power have been completed.

Satisfactory results were achieved during the performance of.

(1) Reactor Engineering Testing (2) Drywell Temperature Profile Measurements Also, the NRC evaluated licensee management and plant staff per-formance during planned periods of normal operations at about 75% of rated power. During this period, licensee management had, as planned, reduced the level of operations oversight. The NRC panel has concluded that plant operations are being con-ducted safely and conservatively.

The NRC has reviewed BEco's actions in response to inspection findings which had potential to impact further reactor opera-tions and found no outstanding issues which would preclude the licensee from proceeding to full power.

e.

NRC Inspection Coverage and Program Status The NRC integrated inspection plan covering activities from 75%

to full power has been approved. The inspection plan and in-spection coverage levels are equivalent to those delineated in the Pilgrim Restart Staff Operating Plan dated Octc,ber 13, 1988 for the Power Ascension Test Program.

There are no open allegations at Pilgrim affecting this recom-mendation.

One recently received allegation is presently under review by the NRC.

r h

af L

6 There are no enforcement actions pending which would preclude continued plant operations.

On August 23, 1989, the NRC issued a Notice of Violation and Proposed Imposition of Civil Penalty for the April 12, 1989 RCIC system overpressurization event.

However, the licensee had already implemented corrective ac-tions.

Reviews by the NRC Staff indicated that the corrective actions for those events were acceptable and formed a reasonable basis to conclude that such events would not recur. NRC Region I Inspection Report 50-293/89-07 details three violations (Level IV) concerning the changeout of equipment and control identification name plates on control room front panels without procedural controls or a maintenance request, failure to perform an adequate procedurel review for the testing of logic relays, and having only one instrument channel in one trip system oper-able for the RCIC turbine compartment wall temperature detection function when two were required.

However, the Panel has deter-mined that corrective actions for these issues are sufficient to support continued plant operation. Therefore, the panel con-cludes that there are no pending enforcement issues which would preclude operation up to full power.

IV.

Conclusion The NRC continues to monitor facility operation and licensee actions in conjunction with the Pilgrim Nuclear Power Station Power Ascension Pro-gram. The licensee has completed the activities of the Power Ascension Program from 50% to 75% power. BEco has conducted oversight of those ac-tivities, assessed performance ind requested agreement from NRC to proceed to the next NRC approval point of full power.

The NRC Power Ascension Program Restart Inspection Staff has monitored licensee activities and conducted an independent assessment of operational training, personnel and equipment performance. The licensee occasionally was slow in initially identifying potential safety concerns related to plant equipment.

How-ever, after questioning by the NRC Restart Staff, the licensee performed a thorough engineering analysis of the events and took appropriate correc-tive actions where warranted. Additionally, although isolated procedural compliance issues continue to exist, the licensee continues to aggres-sively pursue and emphasize strict procedural compliance. The NRC Restart Panel noted that the licensee approached plant operations in a generally conservative manner.

On September 18, 1989 the Pilgrim Restart Assessment Panel convened in the NRC Region I offices to review licensee readiness to proceed beyond 75%

power.

Presentations were made by the licensee and the NRC inspection 1

program Restart Manager.

The basis for the BEco performance evaluation conclusion was reviewed and NRC inspection activity results were assessed.

Based on these activities, the Restart Assessment panei is satisfied that plant operations up to full power can proceed in a safe and deliberate manner.

1

l ENCLOSURE 2 Current Status of Emergency Pre)aredness for the Communities Surrounding the

>11 grim Station Progress continues to be noted in the state of emergency preparedness for r

Pilgrim in the areas of training of personnel, in the identification and re-i solution of Reception Center issues, in supplying equipment to local towns, in the active and visible involvement in the review process by the Federal Emer-gency Management Agency (FEMA), and in the scheduling and planning for the October 1989 full participation emergency exercise.

Plymouth has 91 of 92 implementing procedures approved in concept by the Board of Selectmen. All 92 procedures have been forwarded to MCDA for review and Plymouth has authorized MCDA to forward all but the school committee procedure to FEMA. All procedures except the school procedure were subsequently forwarded to FEMA on August 8, 1989.

Plymouth has requested technical assistance from MCDA on the school procedure.

In Duxbury, all 44 of the procedures have been reviewed by the Department Heads and the review committee and were forwarded to the Board of Selectmen on May 1, 1989. On July 28, 1989, the Town of Duxbury voted to send the updated drafts of the Emergency Phn and Implementing Procedures to MCDA. They also requested MCDA to forward thest draf ts to FEMA for review and comment.

These were sub-sequently forwarded to FEMA on August 8, 1989.

The other towns have received a copy of the FEMA technical review of their emergency plaq and implen,enting procedures.

There are no major issues iden-tified and the towns are working to address FEMA comments.

Overall training continues to progress. The Commonwealth has been working closely with BEco and the towns to approve lesson plans.

To date, approxi-I mately 70% of training, (based upon BEco status) for state, federal and local agencies has been completed.

Progress continues on the reception centers.

In Taunton, all equipment is in place and available for use.

Staff has been identif ni for all reception center activities and training is escentially complete.

In Bridgewater, all l

equipment is in the town and available for use at the reception center.

Staff l

has been identified for all positions except registration. A pool of personnel l

is available for registration, but the individuals have not yet been selected.

L On September 6, 1989, Bridgewater State College approved the agreement for Re-l ception Center renovations.

In Wellesley, decontamination facilities are in l

place on-site. There are no major equipment needs outstanding.

BECo and the l

Commonwealth are actively working to identify Congregate Care f acilities. BECo l

recently completed an agreement with a life insurance company with a large parking garage across the street to allow use of the facility in an emergency.

i l

Training for Department of Public Works personnel has commenced.

Renovations have not yet commenced.

1

2 The Public Information Brochure has been published; distribution began the week of August 21, 1989 and is complete.

The staff has continued to attend planning meetings with town Civil Defense Directors, local elected officials, Commonwealth and MCDA Area II officials that discuss the status of off-site emergency preparedness.

FEMA and the Commonwealth Secretary of Public Safety continue to hold regular meetings.

These meetings have been invaluable in addressing the remaining issues to be completed prior to the exercise.

FEMA continues to be actively involved with the Commonwealth and local towns, attending many meetings and work sessions, as well as the regular weekly planning meetings. A Regional Assistance Committee (RAC) meeting was held on September 6,1989 at which the Emergency Plan and Implementing Procedures for Plymouth and Duxbury were reviewed. No significant problems were noted.

Significant meetings scheduled include a September 28, 1989 follow-up meeting between FEMA and the Commonwealth Secretary of Public Safety and a RAC meeting on October 3, 1989.

The attached emergency preparedness summaries provide the September 8, 1989 status of selected emergency preparedness issues for each town surrounding the Pilgrim Station, the Commonwealth and MCDA Area II as compared to that of July 20, 1989. The staff provided the summaries to the respective town officials through the Civil Defense Directors of each area and subsequently contacted each official to verify the accuracy of the summaries.

I l

i l

{

1 l

1 l

j CARVER EMERGENCY PREPAREDNESS OTATUS j

AS OF 7/20/89 AS OF 9/8/89

{

EMERGENCY PIAN FEMA comments to Carver's FEMA comments to Carver's i

AND corrective action corrective action

]

IMPLEMENTING response were received on response have been l

PROCEDURES June 29, 1989 and are incorporated and the i

being reviewed for emergency plan revised as l

incorporation.

Carver is of June 30, 1989.

Work negotiating with Plymouth is underway to renovate to co-use the Energency the Plymouth Airport for Worker Monitoring and use as an Emergency Decontamination Station Worker Monitoring and Facility at the Plymouth Decontamination Station.

Airport.

This agreement This renovation includes will depend upon facility showers and changing i

co-staf fing resources.

rooms and identification of staffing is in progress.

3 i

TRAINING 1306 of 2108 hours0.0244 days <br />0.586 hours <br />0.00349 weeks <br />8.02094e-4 months <br /> of 75% of the training goal training completed.

Six has been completed.

one sessions have been session has been conducted since 6/2/89 conducted since July 20, and none are currently 1989.

Practical training l

scheduled.

Practical (Hands-on Training) is training (hands-on continuing.

Four training) has commenced, sessions have been Three sessions have been conducted and one is conducted and five are scheduled through scheduled through August September 1989.

1989.

l STAFFING One additional operations A staffing survey position has been conducted by Carver I~

identified and trained identified two additional (currently 44 of 46 positions.

Currently 47 total).

Recruiting of 48 positions are efforts are continuing.

filled.

Recruiting i

i efforts are continuing for the remaining i

position.

1 EQUIPMENT The pagar notification The pagar notification l

system has been delivered system has been delivered but not yet installed.

and installed.

Pagers are currently being i

distributed.

EOC Fully operational.

Fully operational.

l I

STATUS REVIEWED BY:

Helen canello, Deputy Civil Defense Director DATE:

September 8, 1989 By telecon with NRC C.

Conklin.

Comments incorporated.

i;-

DUXBURY EMERGENCY PREPAREDNESS STATUS l

l AS OF 7/20/89 AS OF 9/8/89 EMERGENCY PLAN 44 of 44 procedures have On July 28, 1989 the town AND been reviewed by all of Duxbury voted to IMPLEMENTING Department Heads and forward the updated' PROCEDURES submitted to the Board of drafts of the Emergency selectmen along with an Plan and Implementing i

executive summary.

The Procedures to MCDA.

They j

citizens Radiological also requested MCDA to i

Emergency Response Plan forward these drafts to Advisory Commi-tee is FEMA for technical review reviewing the procedures.

and comment (and to be' The Board of Selectmen used for that purpose met on May 13, 1989 with only) and they were both the Department Heads subsequently forwarded to FEMA on August 8, 1989.

and the Advisory committee in a workshop As of 9/8/89, the session to receive Advisory Committee has comments.

As of 7/21/89, reviewed 6 of 44 l

the Advisory Committee procedures.

has reviewed 5 of 44 procedures and is continuing a weekly f

l

!~

schedule to review the remaining procedures.

Department heads are responding to the l

Selectmen's questions and I

comments raised at the l

May 13, 1989 workshop.

i L

TRAINING 325 of 540 emergency 53% of the training goal 5

l workers have received has been completed.

training with 1031 of Practical training 2365 hours0.0274 days <br />0.657 hours <br />0.00391 weeks <br />8.998825e-4 months <br /> of training (Hands-on Training) is

-i l

completed.

Practical continuing.

Five training (Hands-on sessions have been training) has commenced.

completed since 7/20/89 i

Three sessions have been and one is scheduled i

conducted with three through September, 1989.

i scheduled through August, 1989.

T 1

STAFFING 31 of 41 operations 6 of 7 executive j

l positions and 8 of 10 positions, 16 of 18 l

administrative positions operations positions, 11 have been filled.

of 12 communications positions and 12 of 12 l

support positions are filled, for a total of 45 of 49*.

i

I l

I a

c

, '. EQUIPMENT Tho pag:r actificatien Th3 pag r n3tificOtiCn j

i system has been delivered system has been instolicd 3

but not yet installed, and the pagers are

.c scheduled for distribution the week of 9/11/89.

Five additional:

portable redios.have been identified as being needed by the School j

department.

Procurement

'is underway.

j EOC Fully operational.

Fully operational.

  • Revised to reflect staffing survey conducted by Duxbury.

3-STATUS REVIEWED BY:

Carl O'Neill, Civil Defense Director

{

DATE:

Sectember 11. 1989 By telecon with NRC C.

Conklin.

Comments incorporated.

i I

e l

l 1 -

L e

ll l

l l-l 1

l' r.,--.

7 r'

J o

s KINOSTON EMERGENCY PREPAREDNESS STATUS AS OF 7/20/89 AS OF 9/8/89 EMERGENCY PLAN FEMA comments on No Change.

AND Kingston's corrective IMPLEMENTING action response were i

PROCEDURES received on June 29, 1989 and are being reviewed for incorporation.

TRAINING 1245 of 2023 hours0.0234 days <br />0.562 hours <br />0.00334 weeks <br />7.697515e-4 months <br /> of 77% of the training goal training completed, has been completed.

.Three sessions have Three sessions have been conducted since 6/2/89 conducted since 7/20/89.

?

and three are scheduled Practical Training (Hands-on Training) is through August, 1989.

Practical Training continuing.

One session (Hands-on Training) has has been conducted since commenced.

One session 7/20/89 and two are has been conducted and scheduled through three are scheduled September, 1989, through August, 1989.

t STAFFING 44 of 46 operations No change.

positions and 7 of 8 administrative positions are filled.

EQUIPMENT The pager notification The pagar notification L

system has been delivered system is operational.

but not yet installed.

There are no other identified equipment needs.

l EOC Pully operational.

Fully operational.

i l

STATUS REVIEWED BY:

Frederick Woodworth, Deputy Civil Defense Director DATE:

Sectember 5.

1989 By telecon with NRC C. Conklin.

No comments.

+

a

['

L l

l l

L l>

L.

l MARSHFIELD EMERGENCY PREPAREDNESS STATUS l

AS OF 7/20/89 AS OF 9/8/89 EMERGENCY PLAN FEMA comments to FEMA commer.ts to i

AND Marshfield's corrective Marshfield's corrective.

J IMPLEMENTING action response were action response have been j

PROCEDURES-received on June 29, 1989 incorporated and the and are being reviewed Emergency Plan revised.

for incorporation.

i TRAINING 1016 of 1951 hours0.0226 days <br />0.542 hours <br />0.00323 weeks <br />7.423555e-4 months <br /> of 58% of the training goal training completed.

Four has been completed.

Nine sessions have been sessions have baan conducted since 6/2/89 conducted since 7/20/89.

and seven are scheduled Practical Training through July, 1989.

(Hands-on Training) is Practical training continuing.

Two sessions (Hands-on Training) has

.are scheduled through commenced.

Three September, 1989.

t sessions are scheduled through September, 1989.

I STAFFING 33 of 34 operations No change.

l positions and 4 of 6 l

administrative positions L

are filled.

t c

h l

EQUIPMENT The pager notification The pagar notification system has been received system has been by BEco but not yet dolivered, but pagers are L

delivered.

not yet distributed.

l EOC Fully operational.

Fully operational.

1 l

STATUS REVIEWED BY:

Maureen Robinson, Civil Defense Administrative Assistant l

l DATE:

Sectember 11, 1989 By telecon with NRC C. Conklin.

Comments incorporated.

4 l

h'

)

1

)

c J

PLYMOUTH EMERGENCY PREPAREDNESS STATUS AS OF 7/20/89

  • AS OF 9/8/89

)

)

EMERGENCY PLAN 91 of 92 IPs have No change.

I AND received Selectmen REVIEW IMPLEMENTING AND APPROVAL IN CONCEPT.

PROCEDURES All 92 IPs have been forwarded to MCDA for review and Plymouth has authorized MCDA to forward all IPs but the School IP to FEKA for technical review.

Plymouth has requested technical assistance from MCDA on the School IP.

Clarifying information added by Plymouth.

The School Department I

IP has not yet been approved by two school committees, but'has been forwarded to the Selectmen and then to the State for technical review.

The Saquish/Gurnet egress issue has still not been resolved.

A State run special needs survey is underway and

. should be completed in about 60 days.

The renovation of the Plymouth Airport hanger is underway and training has resumed for l

the Emergency Worker Monitoring and Decontamination Station personnel.

l TRAINING 4216 of-7402 hours of 59% of training is training completed.

No completed.

Five training l

sessicns have been sessions are scheduled conducted since 6/2/89-through September 1989.

and none are currently Practical training l

scheduled.

Practical (Hands-on Training) is training (Hands-on

- continuing.

Nine 3

Training) has commenced, sessions have been Two sessions have been conducted since July 20, conducted and seven are 1989 and three are scheduled through August scheduled through 1989.

September, 1989.

l L

STAFFING 17 of 22 first shift 21 of 22 first shift I

operations positions (32 operations positions (41 of 44 tota 3) and 2 of 4 of 42 total) and 5 of 10 first shifc of the administrative administrative positions support positions are (2 of 8 total) are filled.

l filled.

ea

+"a.--*

---.--.u m

.v.

me u-_,,_wgygw--e-ge,,.,,e3 ee w,ai, y,g

,.ww-pw m-..g gyyg g9 g.g.

4

e EQUIPMENT BEco hoa rccoived th3 The pagar cyctcc h30 boon pogor notifico,tien oyotos dolivorod and 10 but has not yet delivered functioning well within it.

the range of the police repeater.

EOC Fully operational.

Fully operational.

STATUS REVIEWED BY:

J.

Doualas Hadfield, Director, Office of Emergency Preparedness and Alba Thompson, Chairman, Board of Selectmen.

DATE:

Sootember 8.

1989 By facsimile transmission to NRC C.

conklin, comments incorporated.

e 4

6 0

_... ~...

i 1

BRIDGEWATER EMERGENCY PREPAREDNESS STATUS AS OF 7/20/89 '

AS OF 9/8/89 9

I EMERGENCY PLAN FEMA comments on No chsnge.

i AND Bridgewater's corrective

)

IMPLEMENTING action response has been PROCEDURES.

received on Jitne 29, 1989 and is being reviewed for j

incorporation.

TRAINING 647 of 1124 hours0.013 days <br />0.312 hours <br />0.00186 weeks <br />4.27682e-4 months <br /> of 90% of the training goal j

training completed.

has been completed.

Eight sessions have been conducted since 7/20/89.

j Practical training 4

(Hands-on Training).is continuing.

Three sessions have been conducted.

j l

i EOC STAFFING 19 of 19 first shift No change.

operations positions (38 of 38 total) and 4 of 4 first shift administrative positions (8 of 8 total) are j

filled.

i EQUIPMENT BEco has received the No change regarding the pager notification system pager notification but has not yet delivered system.

Bridgewater has i

it, identified a need for-J hand held radios and a i

base station CB unit.

j i

'EOC Fully operational.

Fully operational.

]

L I

1 '

L 1

e

m 4

REckPtION' Tha Occrotary of Public Tho Cridg;w;tcr StOto LCSNTERS Safety has agreed to work College approved the ll with Bridgewater State agreement for Rooeption College.to expedite Center renovations on V

training of' staff and to September 6, 1989.

acquire the necessary Renovation planning is-approvals for underway.

Staffing for renovations.

Reception Center Managers, Reception Center EOC staff, Traffic Control staff, and Monitoring and Decontamination staff has been identified and training is in progress.

Efforts are underway.to staff the remaining..

registration positions.

STATUS REVIEWED BY:

Frank Maher, Executive Secretary and L.

i Perry, Bridgewater State College.

DATE:

Sectember 8.

3111 By telecon with NRC C. Conklin.

Comments incorporated.

1 1

I i

l 1

l 1

I 1

1 l

l' l

- ~ ~ ~

TAUNTON EMERGENCY PREPAREDNESS STATUS

)

n

" AS OF 7/20/89

  • AS OF 9/8/89 l

EMERGENCY. PLAN The Emergency Plan and No change.

AND Procedures have been IMPLEMENTING revised to incorporate

' PROCEDURES FEMA comments and to

)

reflect the change in the Reception Center I

location.

These revisions have been provided to MCDA.

l TRAINING

~1212 of 2008 hours0.0232 days <br />0.558 hours <br />0.00332 weeks <br />7.64044e-4 months <br /> of 82% of the training goal training completed.

has been completed.

Three sessions have been Training is considered conducted since 6/2/89 essentially complete and and seven are scheduled no further sessions are through August, 1989.

scheduled prior to the Practical training exercise.

Practical (Hands-on Training) has training (Hands-on commenced.

Two sessions Training)^is continuing.

have been conducted and-Sessions have been four are scheduled conducted for each EOC through August, 1989.

position as well as a combined EOC practical.

?

EOC STAFFING All operations and No change.

administrative positions are filled.

. EQUIPMENT All equipment has been No change.

delivered and is in place.

There are no identified equipment needs.

EOC Fully operational.

Fully operational.

j

.-. =

=

T -.:

v

. RECEPTION Th3 T;unten School Tho R c pticn COntOr io,

' CENTEkS-C;mmittee vcted to fully cperOtien21.

designate the taunton Renovations are scheduled High School as the city to commence September 18, 1

Reception Center and the 1989.

i Mayor subsequently designated this facility for Taunton.

All equipment has been moved to the high school.

The Taunton State Hospital is no longer used as a Reception Center.

STATUS REVIEWED BY:

Robert snearin, Civil Defense Director DATE:

Sectember 11, 1911 By telecon with NRC C.

Conklin.

comments incorporated.

m 1

9 l

1

(

1 1

i.

1' i l

l

,i l

.. = = - = =.

1 E

i

>L' i

~

MCDA AREA II EMERGENCY PREPAREDNESS STATUS

  • J.-

j

~

AS OF_7/20/89

  • AS OF 9/8/89

' EMERGENCY PLAN Revision 7 of the FEMA comments on the

]

AND emergency plan, including-

_ emergency plan have been j

IMPLEMENTING corrective action to FEMA incorporated and the R

. PROCEDURES review comments and Emergency Plan revised.

letters of agreement was MCDA is awaiting comments submitted to FEMA on June from FEMA on the 5,

1989.

Procedure procedures.

]

revisions are continuing.

TRAINING

'25 of 406 hours0.0047 days <br />0.113 hours <br />6.712963e-4 weeks <br />1.54483e-4 months <br /> of 58% of the training goal l

training completed.

Two; has been completed.,

sessions have been Severa) training sessions conducted since June 2, are scheduled prior to 1989 and none are the September 20, 1989 currently scheduled.

The dress rehearsal exercise.

Commonwealth has agreed L

to expedite the scheduling of training for the Area II. staff.

. STAFFING The' Secretary of Public National Guard personnel Safety has agreed to have been identified and utilize the National training has commenced.

Guard to staff Area II 1'

positions.

/EQUIPMEN1 Status boards and maps to No change.

be delivered by BECo.

i' Additional communications

[

equipment to be ordered r

j by BECo.

lL p

L EOC BEco and the Commonwealth The agreement for l '-

have agreed on the scope renovations has becn of renovations to the approved.

Renovations Area II EOC.

The have commenced and are L

Commonwealth has agreed scheduled for completion i

to expedite the approvals by October 1, 1989.

f L

so renovation can o

commence.

l c,

l

.(

STATUS REVIEWED BY:

Thomas Rodaer, Director MCDA Area II DATE:

Seotember 11. 1989 By telecon with NRC C.

Conklin.

Comments incorporated.

n COMMONWEhLTH OF MASSACHUSETTS EMERGENCY PREPAREDNESS STATUS AS OF 7/20/89 '

AS OF 9/8/89 EMERGENCY PLAN The amargency plan was MCDh EOC procedures were AND forwarded to FEMA for a submitted to FEMA for

' IMPLEMENTING technical review on technical review on PROCEDURES 1/26/89.

August 10, 1989.

l TRAINING 1156 of 5550 hours0.0642 days <br />1.542 hours <br />0.00918 weeks <br />0.00211 months <br /> of

32) of the training goal J

training completed.

has been completed.

These numbers reflect Numerous training supporting state sessions are scheduled departments, including prior to the 9/20/89 Wellesley staff.

dress rehearsal exercise.

1 STAFFING

'All EOC positions are No change.

fully staffed.

EQUIPMENT There are no outstanding No change, equipment needs, although EPZ and Ingestion Pathway o

Zone '(IPZ) maps need to be updated.

EOC Fully operational.

Fully operational.

-RECEPTION BEco and the Commonwealth No change.

1 CENTERS-have reached agreement on t

the scope of renovations at Wellesley.

BEco and

.the Commonwealth also agreed to expedite completion of the E.

Emergency Plan and Procedures for Wellesley.

TRANSPORTATION 3563 of 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of No change.

PROVIDER training complete.

No TRAINING sessions are currently l:

scheduled.

TRANSPORTATION Complete.

After adequate No change.

FEMA is PROVIDER training has been reviewing these L

LETTERS OF provided, the agreements and comments AGREEMENT Commonwealth will conduct are scheduled in early a test to determine the September, 1989.

adequacy of these letters.

g l.-

l l

l l

PURLIC Tho Ccamonwo01th and BEco Distributicn of tho

  • INFORMATION have reached agreem3nt of Public Information CROCHURE publishing the'Public Brochure began the week Information Brochure.

of August 21, 1989 and is The Brochurc was sent to scheduled for completion the publisher on July 10, by mid-September, 1989.

1989.

Distribution is scheduled for late August or early September, 1989.

STATUS REVIEWED BY:

Jeffrev Hausner, Director, Nuclear Safety and Emergency Preparedness DATE:

SeDtember 18. 1989 B) telecon with NRC C. Conklin.

Comments incorporated.

a