Forwards IE Insp Repts 50-361/81-04 & 50-362/81-01 on 810303-06 & Notice of Violation
ML19350E449
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 04/23/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19350E444 List:
References
NUDOCS 8106230082
Download: ML19350E449 (2)


See also: IR 05000361/1981004

Text

//J/C-

.

...

. se.v

.

jo,,

UNITED STATES

8

TUCLEAR REGULATORY COMMISSION

_

l

,

o

' -y

,I

/@(f @* l t

j

REGION V

V; . O,%

[g

.

1990 N. CALIFORNIA BOULEVARD

i

I13

h

Q ' f !g

SulTE 202, WALNUT CREEK PLAZA

4eoe

WALNUT CREEK, CALIFORNIA 94596

-April 25, 1981

({L

q

4

3 011 1 B $ 8 F;

Docket Hos. 50-361, 50-362

uis.%E

)

0)

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Posemead, California 91770

Attention: Dr. L. T. Papay, l' ice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2/3

This refers to the inspection conducted by Messrs. J. H. Eckhardt and G. Hernandez

of this office on March 3-6, 1981 of activities authorized by.NRC Construction

Permit Nos. CPPR-97 and 98, and to the discussion of their findings held

with members of your staff on March 6,1981.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and observations

by the inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

- the Notice of Violation, enclosed herewith as Appendix A.

In accorde.nce with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report wCl be placed in the NRC's Public Document Room.

If this

report contains an) information that you believe to be proprietary, it is

necessary that you Jmit a written application to this office, within 30

days of the date of thu letter, requesting that such infonnation be withheld

from public disclosure. The application must include a full statement of

t

the reasons why it is claimed that the informatirn is proprietary.

The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

8106 28 0 ON

a_

_

.r->

,

-

'

--

'

,

.

-

.

,

Southern California Edison Corrpany

-2-

April 23.1981

Should you have any' questions concerning this inspection, we .will. be glad'

to discuss them with you..

Sincerely,

7 .71 d I JLJ1

-

B. H. Faulkenberry,-Chief

"eactor Construction Project

anch

.

%

Enclosure:

A.

Notice of Violation

B.

'IE Inspection Report

Nos. 50-361/81-04

50-362/81-01