ML19350E398

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/80-15 & 50-509/80-15 on 801118-21 & Notice of Violation
ML19350E398
Person / Time
Site: Satsop
Issue date: 01/09/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mcelwee F
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19350E394 List:
References
NUDOCS 8106220510
Download: ML19350E398 (2)


See also: IR 05000508/1980015

Text

g-

.

[

f (

-

f

\\

UNITED STATES

, y ,,q*'j

NUCLEAR REGULATORY COMMISSION

,c

REGION V

  • -

.

D 'i

[

,1990 N. CALIFORNI A BOULEVARD

-

[

GulTE 202, WALNUT CREEK PLAZA

ee

,a

WALNUT CREEK, CALIFORNI A 9450G

JAfl

9 7331

Docket flo. 50-508, 50-509

4

Washington Public Power Supply System

&

JUN13;ggy ,Aq

P. O. Box 1223

u,1, %

-

com%.'" C

Elma, Washington 98541

c)

uo

&

Attention: Mr. F. D. McElwee

- g

@

Program Director, WNP-3/5

a

Gentlemen:

Subject:

HRC Inspection at Washington Nuclear Projects Nos. 3 and 5

This refers to the inspection conaucted by Messrs. D. P. Haist and G. Hernandez

of this office on Hovemoer 18-21, 1980 of activities . -barized by NRC Construction

Pemit Nos. CPPR-154 and CPPR-155, and to the oiscussion ,f our findings

with Mr. C. E. Love and otner memoers of your staff at the conclusion of

the inspection.

Areas examineo during this inspection are described in the enclosed inspection

report. '.iithin these areas, the inspection consisted of sele <.tive examinations

of procedures and represencacive records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with URC requirements, as

set forth in the Motice of Violation, enclosed herewith as Appendix A.

These

items of noncompliance have Laen categorized into a level as described in

the Federal Register Motice (45 FR 66754) dated October 7,1980.

n accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the MRC's Public Document Room.

If this

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure. The application must include a full statement of

the reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Cocument Room.

l

D

,

~~ %

P00R ORIGINAL

.

-.

-

,

_

_

-

-

3

.' ~

'>>

'

'

-

'

..;

.

y

2-

'

9 M1

Washington Public Power; Supply System ~

-

Should you.have any: questions cencerning this inspection', we will be glad -

to discuss.them with you.

Sincerely,

F

h,(Y

yv

'

uv

,

G. S. Spe cer, Chief

.

..

Reactor Construction and Engineering.

Support Branch

Enclosures:

'A.

tiotice of . Violation

B.

IE Inspection Report

.No. 50-508/80-15

50-509/80-15

cc vi/o Enclosure B:

.

fi. E.-Witherspoon, WPPSS

D.-E. Dobson,'WPPSS

.

.

l

s

s

-

--

_

,_

-.