Forwards Procedures for Hydraulic Snubber Surveillance & Testing,Per 810313 Request
ML19350C180
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/24/1981
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19350C182 List:
References
TAC-10142, TAC-10143, TAC-11300, TAC-11321, NUDOCS 8103310473
Download: ML19350C180 (1)


Text

1 WISCONSIN Electnc n.e coum<

231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEL WI 53201 March 24, 1981 Mr. Harold R. Denton, Director y\Idb O

[

S ,-

Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION py V [k [/ U '[f sk;a\

8 Washington, 3. C. 20555 D

'L : J.'4,- ['O th

' (( +I -!

Mr. Robert A. Clark, Chief IA E Attention:

Operating Reactors Branch #3 (.-}-

k

\odx u.s 7Qe

  • 'c e e .- 3 D

.s-

/ 'x 4N /

Gent 1e:t,.n: c h, >..__. e f'g z\\

DOCKET NOS. 50-266 AND 50-301 HYDRAULIC SNUBBER SURVEILLANCE PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Your letter dated March 13, 1981 requested that we send you the existing Point Beach Nuclear Plant procedures for hydraulic snubber surveillance and testing. A copy of procedures PT R-2,

" Hydraulic Snubber Surveillance and Maintenance Program", and PT R-3,

" Unit 1 and Unit 2 Containment Hydraulic Hanger Inspection", were informally transmitted to the NRC during the week of March 9; we are herewith formally transmitting a copy of each of these procedures.

Very truly yours, C. W. Fay, Director Nuclear Power Department Enclosures 00/