Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-508/80-09 & 50-509/80-09.Requests Addl Info Re Waste Gas Decay Tanks & Vendor QA Program
ML19347E325
Person / Time
Site: Satsop
Issue date: 01/05/1981
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mcelwee F
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19347E185 List:
References
NUDOCS 8104240600
Download: ML19347E325 (2)


See also: IR 05000508/1980009

Text

.

, q', #gm4 #g

UNITED STATES

'

9

'

  • ,

8

NUCLEAR REGULATORY COMMISSION

,

g

!eq -

c

REG lON V

'

1990 N. C ALIFORNIA BOULEVARD

o

SUITE 202, WALNUT CREEK PLAZA

e,,,e

WALNUT CREE K, CAllFORNIA 94596

January 5,1981

Docket flos. 50-508

50-509

Washington Public Power Supply System

P. O. Box 1223

Elma, Washington 98541

Attention:

F. D. McElwee

WNP-3/5 Program Director

References:

1.

WPPSS letter from F. D. McElwee to R. H. Engelken

of November 21,1980, No. G03-80-2966

2.

NRC letter from R. H. Engelken to R. L. Ferguson

of October 28, 1980, forwarding Inspection Report

No. 80-09

Gentlemen:

Thank you for your letter, Reference 1, responding to the two items

of noncompliance provided to you by Reference 2.

Your written

response has been reviewed and was found to lack sufficient

-

information to permit our assessment of your corrective actions.

Accordingly, pursuant to Section 2.201 of the NRC's " Rules of

Practice", Part 2, Title 10, Code of Federal Regulations, you are

required to submit to this office, within twenty-five (25) days of

the date of this letter, a written statement or explanation addressing

'

'he following questions regarding Finding A (waste gas decay tanks)

,

and the overall vendor quality program:

1.

What specific actions will be taken to correct the nonconforming

- - -

welds on the gas decay tanks? When will this action be completed?

2.

Your letter references a new program for vendor quality assurance.

What is the content of this new program?

Is this program a change

from the program identified in the PSAR?

3.

Your letter states that strong corrective actions have been

initiated to control and correct adverse trends. What are these

actions? What results were achieved?

4.

Do you intend to take any action for other vendor supplied

equipment which has been received at the site? If so, please

identify these actions.

. ;.w810124 o gen

~

.

-

_

-

.

e fs ' a

.

,

,

.-

January 5,1981

F. D. McElwee

-2-

Your written response to Finding B (incorrect equipment quality

classification) is satisfactory. The implementation and effectiveness

of the actions identified will be examined in a subsequent NRC

inspection.

Please contact us if you have any questions regarding the above.

Your cooperation with us is appreciated.

Sincerely,

.Q h~

kG.S.SpencerT-Chief

,

Reactor Construction and

Engineering Support Branch

cc:

R. L. Ferguson, Managing Director

M. E. Witherspoon, Quality As,surance Director

D. E. Dobson, WNP 3/5 Project Manager

.-

% 46