05000348/LER-1981-004-03, /03L-0:on 810205,fire Barrier Wall in Control Room Ventilation Equipment Room Declared Inoperable Due to Unsealed Penetration.Caused by Failure to Provide Followup to Action Work Request Issued,But Not Accomplished
| ML19347D441 | |
| Person / Time | |
|---|---|
| Site: | Farley, 050348B |
| Issue date: | 03/09/1981 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19347D439 | List: |
| References | |
| LER-81-004-03L, LER-81-4-3L, NUDOCS 8103170610 | |
| Download: ML19347D441 (2) | |
| Event date: | |
|---|---|
| Report date: | |
| 3481981004R03 - NRC Website | |
text
4 l
17 77).
- LICENSEE EVENT REPORT CONTROL SLOCK:
l l
l l
l (PLEASE PRINT OR TYPE ALL REQUIRED INFORatATIONI l0 itJ l Al Ll J l M! F l 1l@l010l-10 10 l 0 l 0 l 0 l - l O' I O l@l 4 l 1 l 1 l 1l 1l@l l
l@
~
7[ d 9 UCENSEE CCOE I4 15 LICEME NLMas A 25 25 uci'.SE 2YPE 40 57 OAT 58 Pt tl 3c,"y l L @l 0 l 5 l 0 l 0 l0 l 3 l 4 18 @l 0.l 2 l 015 l 8 l 1 @l 013 l 0 l 9 l 8 l1 l@
7 3
60 6.
DOCKET NUM8Ea 68 53 EVENT DATE 74 75 RE7CRT OATI 33 EVENT OE3CRIPTION AND PRO 3ASLE CONSECUENCES h to12j l At 1320 on 2/5/81 a fire barrier wall in the Control Room Ventilation Equipment Room l
l o l a i l was declared inoperable due to an unsealed penetration. As a result of finding this l
I o I A 1 l unsealed penetration, an investigation on 3/2/81 revealed an additional unsealed l
l o i s 1 I penetration in the above wall. Tech. Spec. 3.7.12, in part, requires the above fire l
,3,,j l barrier to be operable. Upon discovery on 2/5/81, Tech. Spec. action statement
- o;7g l requirements were met.
Health / safety of the public was not affected.
l lo!sl I l
T y
g g 80 SYSTE11
CAUSE
CAUSE COMP.
VALVE CODE CODE SUSCCDE CO*.'#CNENT CODE SUSC005
$USCO;E lo191 l Al Blh l A lh l Xlh lZ lZ lZ lZ lZ lZ lh l Z lh lZ lh 7
6 9
to 11 12 13 18 la 20 SEcVENTI AL CCOURRENCE REPCRT REVISICN LES RO EV ENT YE A R R EPCRT No.
CCCE TYPE No.
@ gsg l218 l1 l l-l l0l0l4l l/l l0 l3 l [Ll l-l l0l 22 23 24 28 27 28 29 JJ 31 32 Ks AC C C PL NT tET HoyRS 22 S8 IT 5 FC 3.
- Lif P.f A N F TURER l X lgl4X [g
[ Z lg lZ [g l0l0l0l l
lY l g lN lg l Zl@
lZl9l9l9lg 22 2
25 a
as w
ai 42 42 a
47 cAuSE DESCRIPTION AND CORRECTIVE ACTIONS h ltloI l An investigation revealed that these penetrations were in walls that were to be fire i2,,,jbarriers effective Sept. 1,1980 in accordance with previous rire program re-evaluation I
,,,,,y commitments. These penetrations were identified in August requiring sealing. A l
g maintenance work request was written to seal the penetrations, however the work was l
,,,,, l not accomplished and the work request could not be found. Thisoccurrenceis(continuey l
7 8 9 80 STN
% POWER oTHER STATUS IS RY OfSCOVERY DESCRIPTION l
l1 l 5 l l Clh l 0 l 0 l 0 lgl NA l
lClglPerformanceofsurveillancet ts l
ACTIVITY CC TENT RELEASED OFRELEASE AMOUNT CF ACTIVITY LCCATIC'N OF RELEASE y l Zl @ l Z [gl NA l
l NA l
7 8 3 10 11 44 45 80 PERSCNNEL EXPCSURES NUM8ER TY'E
DESCRIPTION
li t r i 1010101@l Z i@l l
NA l
l
'a
,ERSo~~ELmu'AES cE1CRIPTION@
NuveER UpJ l I 0I l@l NA l
7 1 9 11 12
, 30 h _ LCs3 op CR OAVAGE To FACILtTV TY8E CESCRIPTION 43 l
li 19 I lZ l@l NA l
3 8 9 to go 121 o l l N fhloESCR, Tion @
810317 o 6IO
" " "S " "
.S$u E NA l
lllllllll[ ; ; l 7
8 9 30 68 69 33 -
L W. G. Hairston, III (205)899-5156 o
.=.
~.
i LER 81-004/03L-0 (Page 2)attributable to failure to provide correct followup action and appropriate followup inspection of these penetrations.
All other penetrations added in Sept. 1980 have been verified to be sealed.
This incident will be discussed with appropriate plant personnel.