05000348/LER-1980-052-03, /03L-0:on 800829,electronic Switching Sys B1H Sequencer Failed to Meet Time Requirement for Steps 2 & 3. Caused by Setpoint Drift.Agastat Timers Satisfactorily Reset

From kanterella
(Redirected from ML19347A905)
Jump to navigation Jump to search
/03L-0:on 800829,electronic Switching Sys B1H Sequencer Failed to Meet Time Requirement for Steps 2 & 3. Caused by Setpoint Drift.Agastat Timers Satisfactorily Reset
ML19347A905
Person / Time
Site: Farley 
Issue date: 09/26/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19347A904 List:
References
LER-80-052-03L, LER-80-52-3L, NUDOCS 8009300515
Download: ML19347A905 (1)


LER-1980-052, /03L-0:on 800829,electronic Switching Sys B1H Sequencer Failed to Meet Time Requirement for Steps 2 & 3. Caused by Setpoint Drift.Agastat Timers Satisfactorily Reset
Event date:
Report date:
3481980052R03 - NRC Website

text

l' I T v NRC F027.1346 U. C. NUCLl:AM HIGULATO2Y COMMISSION (7 77)

, f.

7 LICENSEE EVENT REPORT CONTROL 8LOCs0 l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 6 l Al L l Jl M lF l 1 l@l Ol Ol-l 0 l0 h l0 l 0 l -l 0 l 0l@l4 l 1 l ll 1 l 1l@l l

l@

0 1 7

8 3 LICENSEE CQQ1 14 15 LICENSE NuMdER 2*J 26 LICENSE TYPE JO 57 CAT 58 CON'T N',$$ l L l@l 0 l 5l 0 l 0 l0 l 314 l 8 @l 0 l8 l 2 l9 l 8 l 0l@l0 l 9 l 2l 6 l 810 l@

8 60 St DOCK ET NUMBER 64 43 EVENT OATE 74 75 REPORT DATE 80 EVENT OESCRIPTION AND PROBABLE CONSEQUENCES h 8 l At 1810 on 8-29-80, while performing FNP-1-STP-28.1, the ESS BlH I

O 3 l Sequencer failed to meet the time requirement for picking up steps l

1 2 and 3.

Tech. Spec. 3.8.1.1 requires two separate independent diesel I 0 8 lOlsil generator sets and sequencers to be operable.

Diesel Generator 1C was i O s I restored to an operable status at 1940 on 8-29-80. (Diesel Generator l

lTITli 1C would have picked up required loads in an ESS condition.)

This I

l0pil occurrenca did not affect the health and safety of the general public.

I F

E 9 80 S v 5 f E '.f

CAUSE

CAUSE COMP.

VALVE CCOE CODE SU8 CODE COMPONE NT CCOE SUSODE SUSCODE l ElE l@ y@ l Z l@ l R l El L lA lY l Xl@ J@ y @

l 0 9 7

8 9

10 11 12 13 18 19 20 SEQUE N TI AL OCCURRENCE REPORT REVISION ga a EVE *ef YE AR R EPOR T NO.

CODE TYPE N O.

@.,',y.j;o la 101 L--J 101 sl2 l Ld 101 31 LL_J L---J LO_)

_ 28 22 23 24 26 27 28 M

30 38 32 TA A TO ON PL NT ET HOURS S 8 't FOR 8.

f L R'

MANUPA TURER LE_J@l z l@

L zl@

l z_l@

l oIo I olo I LN_j @

l N l@

[A__l@

l A l ll 0 l9 l@

32 J4 3's 36 Ji 40 41 42 43 44 47 C AUSE OESCRIPTION AND CORRECT ; ACTIONS l i l o l l This incident is attributable to retpoint drif t.

The agastat timers I

L'_LU l were adiusted and a satisfactory retest per the applicable cortion of I

y l FNP-1-STP-28.1 was performed.

I LU_u I I

L'_L*_J l I

7 8 9 80

$r2h$

% POWER OrHER STATUS 515 OV RY DISCOVERY DESCRIPTION (E_j@ l1l0lOl@l NA l

[S._.j@lPerformanceofSTP l

1 5 A!T,v,rv CO'erENT

'2 WOUNT OP ACTIVITY @ I RELEASED OP REM ASE LOCATION OF RELEASE t.Ltc] l_zj @ Laj@l I

NA l

NA

.t-OwEL E,0s3Es oEsCRIPTiON @

.u,,ER Tvn l 01010 l@[Z_j@l NA l

t i

'. EnsOwEt,N;U4EsoEsCR.PTiO~@

8

.U.,. E R ITIlIololol@l NA l

7 8 9 ii i2 80 t055 OP OR DAVAGE TO FACILITY Tv8E DE SCRIPitON

(_.Zj@l NA l

' 9 7

8 9 10 80 ISSUE

DESCRIPTION

Ly._181 nam n 0 6 I

IIllillilitill 2 o g g D 'J "

68 69 80 %

7 8 9 10 W.

G. Hairston, III (205) 899-5156 o

NAVE OF PREPARER PHONE:

5,