ML19345F933

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-317/80-20 & 50-318/80-17 on 801027-29 & Notice of Violation
ML19345F933
Person / Time
Site: Calvert Cliffs  
Issue date: 11/24/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19345F926 List:
References
NUDOCS 8102190562
Download: ML19345F933 (2)


See also: IR 05000317/1980020

Text

e

.

j[

<

UNITED STATES

J

,.,'q

j;

NUCLEAR REGULATORY COMMisslON

'

5 l )+(

o

REGION l

j

g-

g

t,

63t PARK AVENUE

fg

KING OF PRUS$1 A. PE NNSYLV ANI A M4M

,

  • ' * *

NOV 2 ; a

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall,Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Combined Inspection 50-317/80-20 and 50-318/80-17

This refers to the routine inspection conducted by A. D. Sassani, Jr. of this

office on October 27 - 29, 1980 at Calvert Cliffs Nuclear Power Plant, Units 1

and 2, Lusby, fiaryland of activities authorized by NRC License Nos. DPR-53 and

DPR-69 and to the discussions of our findings held by A. D. Sassani, Jr. with

Mr. L. Russell of your staff at the conclusion of the inspection, and to

subsequent telephone discussions between A. D. Sassani, Jr., and A. Marion on

November 6, and between Mr. Sassani and W. Gibson on November 7,1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representativ records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appe'ars that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncom-

pliance has been categorized into the levels as described in our correspondence

to you dated December 31, 1974.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations. Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written state-

(1) corrective steps which have been

ment or erlanation in reply including:(2) corrective steps which will be taken

taken by you and the results achieved;

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must be accom-

panied by an affidavit executed by the owner of the information, which identifies

'

8102390h(:7

-

. _ _ . _ _ _ _ _ _ . . - _ . _ . _ _ _ . _ _ - - - _ _ _ _ . _ . _ . _ _ _ _ _ . _ .

. _. . ._.- __ _ ._ - _ .

i

.

'

-

.

Baltimore Gas and Electric Company

2

,

J

t

l

the document or part sought to be withheld, and which contains a statement of

reasons which addresses with specificity the items which will be considered by

i

l

the Commission as listed in subparagraph (b)(4) of Section 2.790.

The infor-

mation sought to be withheld shall be incorporated as far as possible into a

separate part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

j

Room.

.

t

.

Should you have any questions concerning this inspection, we will be pleased to

.

discuss them with you.

.l

Sincerely,

l

.,

f.

Robert T. Carlson, Chief

i

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection Report

Number 50-317/80-20 and 50-318/80-17

cc w/ enc 1:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

i

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Panager, Nuclear Power

'

I

R. E. Denton, General Supervisor, Training and Technical Services

l

K. H. Sebra, Principal Engineer

l

i

!

4

3

I

1

.

I

i

.

, , - , , . - - , , , - , , , . . - - - - , , , - , - , - - , - - , ~ , , - - - - ,

- - - -

- - . ~ , -


v-

--,-.,r,~,,

,-c,-,--

, . - -.~,


.c...wr,,- - - - - .. - , . ,-.,. , - , - , , ~--