ML19345F719
| ML19345F719 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 11/18/1980 |
| From: | Kenna W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML19345F714 | List: |
| References | |
| NUDOCS 8102190111 | |
| Download: ML19345F719 (2) | |
See also: IR 05000280/1980038
Text
-_
_ _ - _ _ _ _ - _ .
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
___ _____ _______ __________________ - __ _______________ __- _____ __________
MATEl"f,L TFJ.NS.',1TTm HQ3'MH
.
COMkldS 2.K3lHiDRllA110y
Q [gma
,
o
UNITED STATES
g
NUCLEAR REGULATORY COMMISSION
M
3
o
$
E
REGION 11
2
g
f
101 MARIETT A sT., N.W.. SUIT E 3100
f
AT LANTA, GEORGIA 303o3
%...+o
NOV 181980
In Reply Refer To:
RII: CDP
50-280/80-38
50-281/80-42
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by C. D. Perny of this office on
September 28 through October 2,1980, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 at the Surry facility and to the discussions of
our findings held with J. L. Wilson at the conclusion of the inspection.
Areas examined during this inspection included your physical security program as
implemented under the provisions of Title 10, Code of Federal Regulations, Part
,
73, " Physical Protection of Plants and Materials" and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the inspector.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to croid further noncompliance; and (3) the
date when full compliance will be achie.ud. Details of activities involving
safeguards and security measures are exempt from disclosure in accordance with
10 CFR 2.790(d). Therefore, your response should be incorporated in a separate
paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter with the exception of the report cover page, which is an inspection
summary, will not be placed in the Public Document Room.
MATERIAL TRA!!S!,UTTED HEREWITil
8302100//l
comAinS 2.E0!!iFORIAAT10N
.
.
_
_
__
,
,
MATE 11111TRA!!S!GTED HECB7;TH
N0V13198o
.
C0! TAllis 2.703 !llTORMAT1011
9
'
Virginia Electric and Power Company
-2-
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Since tly,
i
en a, Chief
.
.
Safeguar s Branch
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt from Disclosure)
2.
Inspection Summary
(Not Exempt)
3.
Inspection Report Nos. 50-280/80-38
and 50-281/80-42
(Exempt from Disclosure)