MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141A5021997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Oyster Creek Nuclear Generating Station ML20141H7441997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Oyster Creek Nuclear Generating Station ML20137X8231997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Oyster Creek Nuclear Generating Station ML20137C3771997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Ocnpp ML20134P6151997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Oyster Creek Nuclear Generating Station ML20133M1751996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Oyster Creek Nuclear Generating Station ML20132D1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Oyster Creek Nuclear Generating Station ML20134M9761996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Oyster Creek Nuclear Generating Station ML20129B1631996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Oyster Creek Nuclear Generating Station ML20117M7561996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Oyster Creek Nuclear Generating Station ML20116M6761996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Oyster Creek Nuclear Generating Station ML20115F8561996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Oyster Creek Nuclear Generating Station ML20112J7431996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Oyster Creek Nuclear Generating Station ML20112A6891996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Oyster Creek Nuclear Generating Station ML20101R0401996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Oyster Creek Station ML20101D7701996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Ocnpp ML20100G5101996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Oyster Creek Nuclear Generating Station ML20096E8071995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Oyster Creek Nuclear Generating Station ML20099L7571995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Oyster Creek Nuclear Generating Station ML20094P8431995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Oyster Creek Nuclear Generating Station ML20093H3571995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Oyster Creek Nuclear Generating Station ML20092H7741995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Oyster Creek Nuclear Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K4451999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Oyster Creek Nuclear Generating Station.With ML20211P6731999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Oyster Creek Nuclear Generating Station.With ML20211A7051999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Oyster Creek Nuclear Station.With ML20209G0631999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Oyster Creek Nuclear Generating Station.With ML20212H5491999-06-18018 June 1999 Non-proprietary Rev 4 to HI-981983, Licensing Rept for Storage Capacity Expansion of Oyster Creek Spent Fuel Pool ML20195E7961999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Oyster Creek Nuclear Generating Station.With ML20206N7431999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Oyster Creek Nuclear Generating Station.With ML20205P5401999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Oyster Creek Nuclear Generating Station.With ML20204C8201999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Oyster Creek Nuclear Generating Station.With ML20199E4671998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Oyster Creek Nuclear Generating Station.With ML20195E8321998-12-31031 December 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Sys & Procedures, for Period of June 1997 to Dec 1998.With ML20198D2091998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Oyster Creek Nuclear Generating Station.With ML20195J8591998-11-12012 November 1998 Rev 11 to 1000-PLN-7200.01, Gpu Nuclear Operational QA Plan ML20195C4271998-11-0606 November 1998 Safety Evaluation Supporting Proposed Ocnpp Mod to Install Core Support Plate Wedges to Structurally Replace Lateral Resistance Provided by Rim Hold Down Bolts for One Operating Cycle ML20155J3021998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Oyster Creek Nuclear Generating Station.With ML20154R4981998-10-20020 October 1998 Core Spray Sys Insp Program - 17R ML20154L3051998-10-14014 October 1998 Safety Evaluation Accepting Licensee Request to Defer Insp of 79 Welds from One Fuel Cycle at 17R Outage ML20154Q3371998-09-30030 September 1998 Rev 8 to Oyster Creek Cycle 17,COLR ML20154L5571998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Oyster Creek Nuclear Generating Station.With ML20151V6311998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Oyster Creek Nuclear Generating Station.With ML20237D5691998-08-31031 August 1998 Rev 0 to MPR-1957, Design Submittal for Oyster Creek Core Plate Wedge Modification ML20237D5711998-08-18018 August 1998 Rev 0 to SE-000222-002, Core Plate Wedge Installation ML20237B0131998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Oyster Creek Nuclear Generating Station ML20236R0511998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Oyster Creek Nuclear Generating Station ML20249B2981998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Oyster Creek Nuclear Station ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted ML20247F1891998-05-0505 May 1998 Risk Evaluation of Post-LOCA Containment Overpressure Request ML20247G0581998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Oyster Creek Nuclear Generating Station ML20216K0341998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Oyster Creek Nuclear Generating Station ML20151Y4651998-03-31031 March 1998 Non-proprietary Version of Rev 1 to GENE-E21-00143, ECCS Suction Strainer Hydraulic Sizing Rept ML20217A4631998-03-23023 March 1998 Safety Evaluation Accepting Use of Three Heats/Lots of Hot Rolled XM-19 Matl in Core Shroud Repair Assemblies Re Licenses DPR-16 & DPR-59,respectively ML20212E2291998-03-0404 March 1998 Rev 11 to 1000-PLN-7200,01, Gpu Nuclear Operational QAP, Consisting of Revised Pages & Pages for Which Pagination Affected ML20216J0841998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Oyster Creek Nuclear Generating Station ML20203B2781998-02-16016 February 1998 10CFR50.59(b) Rept of Changes to Oyster Creek Systems & Procedures ML20203A3801998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Oyster Creek Nuclear Generation Station ML20198P1791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Oyster Creek Nuclear Station ML20217C7591997-12-31031 December 1997 1997 Annual Environmental Operating Rept for Oyster Creek Nuclear Generating Station ML20197E9131997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Oyster Creek Nuclear Station ML20199E4561997-11-13013 November 1997 Safety Evaluation Accepting Ampacity Derating Analysis in Response to NRC RAI Re GL-92-08, Thermo-Lag 330-1 Fire Barriers, for Plant ML20199D4381997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Oyster Creek Nuclear Station ML20202E8511997-10-21021 October 1997 Rev 0 to Scenario 47, Gpu Nuclear Oyster Creek Nuclear Generating Station Emergency Preparedness (Nrc/Fema Evaluated) 1997 Biennial Exercise. Pages 49 & 59 of Incoming Submittal Were Not Included ML20211M9481997-10-0303 October 1997 Supplemental Part 21 Rept Re Condition Effected Emergency Svc Water Pumps Supplied by Bw/Ip Intl Inc to Gpu Nuclear, Oyster Creek Nuclear Generation Station.No Other Nuclear Generating Stations Effected by Notification ML20198J7361997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Oyster Creek Nuclear Generating Station ML20211B7461997-09-24024 September 1997 Part 21 Rept Re Failure of Emergency Service Water Pump Due to Threaded Flange Attaching Column to Top Series Case Failure.Caused by Dissimilar Metals.Pumps in High Ion Svc Will Be Upgraded to 316 Stainless Steel Matl ML20210V0181997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Oyster Creek Nuclear Generating Station ML20210L2961997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Oyster Creek Nuclear Station ML20149F9961997-07-18018 July 1997 Safety Evaluation Re Gpu Nuclear Operational Quality Assurance Plan,Rev 10 for Three Mile Island Nuclear Generating Station,Unit 1 & Oyster Creek Nuclear Generating Station ML20196H0111997-07-11011 July 1997 Special Rept 97-001:on 970620,removed High Range Radioactive Noble Gas Effluent Monitor (Stack Ragems) from Service to Allow Secondary Calibr IAW Master Surveillance Schedule. Completed Calibr on 970628 & Returned Stack Ragems to Svc ML20210L3081997-06-30030 June 1997 Corrected Page to MOR for June 1997 for Oyster Creek Nuclear Generating Station ML20141H2051997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Oyster Creek Nuclear Station 1999-09-30
[Table view] |
Text
.-.
l
\
O '
CPERATICBE SO2GRY i )
l tbvenber 1980 4 At the beginning of the reporting period, the Oyster Creek Pv-laa* Geaarating Station was operating at 96.3% r-apar-dty (628 Mie) . Icad was limited by 0 - hate dami~n14 zer differential pressure. 24 ultimate cause of the differential pressure limitation was the irability cf em New Radwaste Systan to process liquid and solid waste as desigrad.
8 _ Icad.was rar** hsarily en Novenber 4,1980 for an ABBO cn a cende:usate e'-4v r=14 m v.- Cn November 7,1980 load was again raA r=a for mainte:vince en .
"C" faarAmter string and 14 *nrhine step valve. After maintenance, full lead i
' was reached cn November 10, 1980. Se plant was shut &mn cn Nowntber 21, 1980 for unintenanm on "C" High Pressure Feedwater Beater and the Ncrth Feedwater Line Cbeck Valve in the T::unien accm. t e reactor was started up cn Novw=+=r 28,1980 but delayed thrctsh to November 29, 1980 due to prcblers
' . with containment inertiW. . 24 gerarator came cn lire cn November 29, 1980 and lead was being incmad at the end of the .vd.w period.
Pare were 9 Fepertable Occurrences and 3 Ncn-Fcutine Envircomental Cperating Peports duri.g the ucnth:
BO4 80-47 occurred en November 1,1980 @an Core Spray High Crywell . 1 Pressure Switches R.V. 46 A, B, C, and D were found to haw settings less conservative than Technic:a1 Srar-ificatien requirements.
I i PO4 80-48 cccurred en Octcher 29, 1980 when sri N r 23-7 failed I functional testing.
, i
!! BC# 80-49 occurred en !bverber 5,1980 when Isolaticn Cerv'an=ar "B" vent
- valves were found to be incperable and Isolation Cer
- denser was incperable.
i BC# 80-50 occurred en November 6,1980 when Ccn+aimant Spray High Crywell I; Pressure Switems IP 15 A, B, C, and D were fetzd to have settings less cor.servative than Technical Specificatien recuirements.
PC# 80-51 occurred on November 8,1980 when the daily surw411a= for i APIH3R, IIR3R, and !C3R was not performed.
3 l$
l 20# 80-52 occurred en E vamr** 18, 1980 when Beacter Triple Icw Water Ievel Indicat=r Switenes RE 18A and D were found to haw settings less j
' conservative than Tec.%ical Spar-4 fir-ation requirunents.
1
- 1 BC# 80-53 cccurred en tbvember 30,1980 @.en CSD Puq:s A and B were made l
incr=_nble at separate times to repair a seal water leak.
l BO4 80-54 occurred on November 30, 1980 when Core Spray Ptsps A and C were 6 Warily incperable at separate times tan wet by leakage frcm
- the CRD ptmps.
i l !
h I
' .: c_ .. '" O
NIECR$ 80-10 occurred en Nevernber 11, 1980 when less than two dilution punps were operating for a period of 25 minutes with ambiant intake water W_m_ture less thvi 60.0*F.
NREDRt 80-11 occurred on Nevereber 18,198J when ambient intake water
- Wmture drcpped resultiry in a cerra&d4m drop in the diehrge i
Wrature which m'M a tW fish kill.
NREERt 80-12 occurred on .h 11, 1980 when the plant shut down and the resulting diehrge temperature drop k4llad a rmhar of fish in the
- surrcunding waters.
% .4 . . . . . ..
n h
I t
i, i
e I
i 4
i S
t r s 7
\ I 1 ;
O g
l
a . . . -: . :--
, OPERATING DATA REPORT OPERATING STATUS UNIT NAME.. 0YSTER CREEK 1 DOCKET NUP3ER.. 50-219 J UTILITY. DATA PREPARED BY...J.B. SKLAR 609-693-6013 REPORTING PERIOD... November 1980
~
! LICENSED THERMAL PCWER(MWT)'.. 1930
. NAMEPLATE RATING (GROSI MWE).. 450 DESIGN ELECTRICAL RATING (NET MWE).. 650 i MAXIMUM DEPENDABLE CAPACITY (GROSS MWE).. 650 MAXIMUN DEPENDABLE CAPACITY (NET MWE).. 620 IF CHANGES OCCUR IN CdPACITY RATING SINCC LAST REPORT, GIVE REASON...
NONE POWER LEVEL TO WHICH RESTRICTED, IF ANY(NET MWE)... NO RESTRICTION REASON FOR RESTRICTION, IF ANY...
, NO RESTRICTION MONTH YEAR CUMULATIVE HOURS IN PERIOD '720.0 8039.0 95903.0
, HOURS RX CRITICAL 543.9 3046.3 71685.6 RX RESERVE SHUTDOWN HRS. 0.0 0.0 448.2 HRS. GEN ON LINE 535.3 2918.5 70223.9 i -
.. UT RESERVE SHUTDOWN HRS 0.0 0.0 ,
0.0
, GROSS THERMAL ENERGY 926488.0 4942321.2 118821480.5 t
- GROSS ELEC ENERGY 309270.0 1593960.0 40476275.0 f NET ELEC ENERGY 296410.0 1522558.0 39003571.0 UT SERVICE FACTOR 74.3 36.3 73.2 i
j UT AVAILABILITY FACTOR 74.3 34.3 73.2 f UT CAPACITY FACTOR MDC 64.4 30.5 67.1 i'
UT CAPACITY FACTOR DER 63.3 29.1 62.6
. FORCED OUTAGE FACTOR 25.7 12.2 6.7 THE NEXT SCHEDULED OUTAGE IS TO SEGIN ON SPRING OF 1981
- . g - y - ----w-w-- - - - - -r-- +e - m-- - - ---*- -
+ _ . .
~
'~'
~-_- _ . . .
AVERAGE DAILY POWER LEVEL DOCKET 4...... 50-219 UNIT.......... O. C. 41 REPORT DATE... December 10, 1980 I COMPILED BY... J.B. SKLAR TELEPHONE..... 609-693-6013 I
- MONTH November 1980 DAY MW DAY MW' t
4 4
- 1. 602. 17. 604.
! 2. 604. 18. .606.
l l 3. 604. 19. 603.
1
- 4. 582. 20. 600.
- 5. 513. 21. 583.
- 6. 588. 22. 15,.
j 7. 593. 23. O.
?
- 8. 335. 24. O.
[
.. 9. 453. 25. 6.
- 10. 579. 26. 6. .
i
, ii. 602. 27. 9.
- 12. 602. 28. 9.
- 13. 603. 29. 9.
~
- 14. 602. 30. 302.
1
- 15. 604.
l
- 16. 604.
I t
l l
l l
l 9 .
' - ~ ___ - - _ . . _ _ . _ . .
I ~
l ~ . . . . .. - - , .- -
i i
ii l
l '.
UNIT SilUTDOWNS AND F0WER REDUC 110NS I E NO.
DATE December 9. 1980 l
COMr E I J B r r REPORT MONill November , 1980 l, '
I q ,
- s. o g i Eg * ** U
- l.icensee {* vb Cause A Corsecilve Nie. Daie N
B.
jd=
3M Event Repwt
- gi Acelon so o j (5 vi u g Prevent Recussence 6 11-7-80 F 0.0 B 5 N/A ZZ ZZZZZ Leaking drain valves on "C" feedwater pump and a flow con-trol valve were replaced.
Maintenance was also performed on f4 Turbine stop valve and 1B2 moisture removal valve.
7 11-21-80 F 184.75 B 1 N/A ZZ ZZZZZ Plugged 27 leaking tubes in IC3 HP Feedwater lleater and repaired seal weld on feed checi valve check valve hinge pin.
I 2 3 4 F: Forced Reason: Method: Exhible G. insieuctions 5: Scheduled A.Equipnwnt Falluse(Emplain) 1 Manual foe riepseselon of Dets -
B-Maintenance of Test 2-Manuel 5ctsni. Entry Sheets fw tiensee
' Event Report (LER) Fil:(NUREG.
C-Refueling 3.Automalle Scism.
D Regulatmy Re:Isiction 4 Oiher(Explain) 0161)
E Operator Training A Ucense Emandastion F Administistive 5 .
G-Operselonel Esson (Explain)
Exhible 1 5saw Source (9/77) Il-Oeher(Earlain)
~
s MON 111IN OASL MDCilANICAL MARTIT2WCE RElWP
?
System Malfunction Corrective Action Biergency Diesel
~
C001119 air fan securing Ikplaced bolt.
I Gererator #1 bolt failed frun fatigue.
A CIO Punp Outboard Dearing oil leak IYpaired Oiler.
A CIO Filter Illgh aP across filter IYplaced Filter clements CIU42-11 V-106 valve leaks past seat -
Irmtalled new ball arx1 packing.
CIO42-23 V-106 valva leaks past seat Installed new ball arx1 packing.
CIO 42-07 V-106 valve leaks past seat Installed new ball and peking.
, Dnergency Cusulenser systczn V-14-1, 5, 19, 20, 7, 3, 4, 8 Itpackal all valves.
packing leaks CIO 38-19 Packing leak on V-107 Mjusted packing.
CIO 02-27 V-127 leaks past seat Ivplaced disc.
CIO Ilydraulic Control V-15-26 and 25 packing leaks Mjusted packing.
neactor Iwcirculation Sanple V-24-29 diaphragm Itplaced diaphragm l Line ',-
leaks l Dnergency condenser ', V-14-30 packing leaks Ikpacked valve i
- CPD 34-31 -
V-127 leaking past seat neplaced seat and gaskets "B" CRD Filter IIigh aP ,
Beplaced filters.
CIO 42-07 V-111 malfunction Itpl.x:ed valve.
, . - - . . . . - . . . . . . ......-...........g.. ., , ... , . ,. ..- _, ..; , , _ _
I NOVIMER SittWW OF OEL EI1XXRICAL PRINIT2WKE R1uipycnt Malfunction Corrective N; tion Isolation Condenser Vent Failed in operate Ibplaced valves, troublesloot entire i Valves circuit arx1 verified operability.
Core Spray Dooster Ptsip Wiring entrances not water- tew gaskets for covers installed arx1 btors proofed adeqtately waterproofiry foarn teed to seal cuxluits.-.
Condensate Transfer Ptsip Contactor Ontterits Cleaned contactor arx1 checked current 1-2 . through power leads.
Duergency Service Water Corroded Filtern Ibplaced with stainless steel type filters.
Ptsrp Peters ..I Fire Protection Alarm Defective ZII-30 Pix 1ule Ibplaced. l Diesel Generator 1 - 2 Fuel transfer punp trotor Ibplaced notor starting switch (in notor) i Diesel Generator 1 - 2 Voltage regulator rectifier Ibplaced rectifier.
stack assorbly (CRS) faulty Diesel Generator 1 - 2 lblay STYA faulty Ibplaced.
Battery Owtrger Diesel Generator 1 - 2 Battery O mrger Cleaned burned contact on STYA relay.
Diesel Generator 1 - 2 Ihttery O nrger Irmtalled ttsiporary clarger.
Diesel Generator 1 - 1 Mail breaker light indication out leplaced light socket (open in11 cation)
Service Water Ptarp 1 - 1 Motor required replacanent Ibplaced.
Isolation Condenser Valve Double Irxlication hijusted valve timing.
V-14-30 <
Main Steam valves V-1-llo Valve 11x11 cates full shut 'Ibrque switch replaced on V-1-110 constantly CIO Ptmp Motor Trips out on overload Ibplaced overload in breaker.
NOVEMBER SLMMRY OF OASL INSITRNENT MAINIT24ANCF,
- Pkjulpnent Halftmetion Corrective Action
! Drywell Vantillation neceived Alarm Clearni contacts of 6K60 arx16K61 Isolation dypass 4
Fuel Ibol Iot Icvel Alarm Alarm Irx11 cations Mjusted Dubbler flow.
SIM diannel 23 Ibriod Irxlicaticn failed Replaced control module.
l IIN Okinnel 14 necorder irxlication different Mjusted recorder than noter.
APIM diannel 3 Pegged downscale neplaced a diode in trip aux. unit Beactor Vessel 'Ibip. All points printed toscale Stelping soleroid bearings clearni Decorder arx1 oiled.
Area Itx11ation 2nitor - Failed upscale neplaced faulty detector containment Spray lieat Exchanger D
- Rx1 Position Irx11cator 14-11 Missing pos. 42, 43, 46, and neplaced problem and installed jtsiper
- 47 due to cpen lead Isol Corx1 "B" press indicator Out of onlibration neplaced and calibrated irx11cator i
"A" necirc Flow Indicator Out of calibration neplaced and calibrated indicator i
Accoustic Safety & nelief No atx11ble response frun Tightened cable connector and replaced valve Irulicator NR-108A and NR-28N acceleroneter resnectively.
ERV-A ERV-A opeint @ approximutely Fbund pressure switch would trip alnve arx1
.800 psi below 1000f (i.e.,10509 , arx18658 ) -
Replaced pressure switdi asserrbly.
9 j u -.. q'q . . -
m.. . . . . . . -. .-.n... -
. . . n . .. _ . . . . . . . ~ . . . . . . v. _.
'I ..
i .
'! Oyster Creek Station #1 t
Occket No. 50-219 REFUELING INFORPATION -
I Name of Facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown: h h 28, 1981 .
Scheduled date for restart following refueling: May 31,.1982 ,
Vill refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
! lb Mdcal Specification charge rilative to the refuelirs is anticipated.
Scheduled date(s) for submitting proposed licensing action and supporting in fo rma tion:
!b sukmittals are schaA;1M.
' Important licensing considerations associated with refueling, e.g., new or L different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
- 1) General Electdc fuel as==h14== - fuel design & perfccance analysis methods have been a wid by tM NIC. Nea cperatirs swc:d:res, if racessary, wi.11
, be submitted at a later date.
- 2) Exxcn Fuel Asserh1iM - No majcr charges have teen made nor are there any anticipated.
l l
l The number of fuel assembiles (a) in the core -
560 (b) in the spent fuel storage pool - 781 The present licensed spent fuel pool storage capacity and the size of any .
increase in licensed storage capacity that has been requested or is planned,
. In numcer of fuel assemblies:
Present: 1,800 Planned: 2,600
, , The projected date of the last refueling that can be discharged to the spent l
fuel pcoi assuming the present licensed capacity:
2:e Scri:q 1987 0:q
- i t
f i
s !
l l