05000348/LER-1980-065-03, /03L-0:on 801022,total Controlled Leakage During Reactor Coolant Pump Seal Controlled Leakage test,FNP-1-STP- 8.0,exceeded Tech Spec Limit.Caused by Failure to Verify Total Flow After Adjustment.Operating Procedure Changed

From kanterella
(Redirected from ML19345B470)
Jump to navigation Jump to search
/03L-0:on 801022,total Controlled Leakage During Reactor Coolant Pump Seal Controlled Leakage test,FNP-1-STP- 8.0,exceeded Tech Spec Limit.Caused by Failure to Verify Total Flow After Adjustment.Operating Procedure Changed
ML19345B470
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/24/1980
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19345B451 List:
References
LER-80-065-03L, LER-80-65-3L, NUDOCS 8012010367
Download: ML19345B470 (1)


LER-1980-065, /03L-0:on 801022,total Controlled Leakage During Reactor Coolant Pump Seal Controlled Leakage test,FNP-1-STP- 8.0,exceeded Tech Spec Limit.Caused by Failure to Verify Total Flow After Adjustment.Operating Procedure Changed
Event date:
Report date:
3481980065R03 - NRC Website

text

NRC FORA) 66 U. S. NUCLE A7 RE Zut.ATCSY COMMISSION (7 7M

+

g/'

LICENSEE EVENT REPORT CONTROL 3LOCC l

}

I i

h (PLE ASA PRINT OR TYPE ALL REQU6 AED INpoRMATioNi l0 l t l l AlL lJ N 1F l1 l@l 0 l 0 l -l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 l 1 l 1 l 1 l 1. l@l l

l@

I 8 9 LICENSEE COL

  • 14 M

LICEN5E NuMet.4 26 26 LICENSE TveE 40 67 L A I se CON *T lOi11 s{$ l Ll@l 0] 5 l Ol 0 l 013 l 4 l 8 @l 1l 012 l 2 l 8 l 0 l@l 1 l O l 2 l 4 l 8 l o l@

I 5

60 61 QOCKET NUMBER twB 63 EVENT DATE 74 75 REPORT DATE 80' EVENT OESCRIPTION AND PROSASLE CONSEQUENCES h 10 I a I l At 1540 on 10-22-80, during the performance of FNP-1-STP-8.0 (RCP Seal Controlled I

f o l3l l Leakage Test) it was determined that the total controlled leakage (36 com) exceeded j

I o I 4 I l Tech. Spec. 3.4.6.2.e requirements (31 gpm maxi =um allowable). The leakaee was I

l o i 5 I l returned to Tech. Spec.1.imits at 1625 on 10-22-80.

Health / Safety of the public l

Iolel l were not affected by this occurrence.

l 10171 l I

Ioisl I I

80 7

8 9 SYSTEM

CAUSE

CAUSE COMP.

VALVE CCOE CCDE SUSCODE COMPONEN T CODE SUSCODE SUSCOQii 10191 lC l Il@ W@ W@ lZ lZ lZ lZ lZ lZ l@ l Zl@ W @

7 8

9 to 11 12 13 16 19

.3 SiOVEN TI AL OCCURAENCE REPORT REVi$lON LER RO EVENT YEAR REPORT NO.

CCDE TYPE No.

@ syg I al 01 1-1 1016 i s l I/l 10131 LL_J I-I Lo.J a

21 22 22 24 26 27 23 29 Su 31 32 TK N A TO ON PL NT M T HOURS S S i FOR 9.

$U PLIE MANUFAC RER jHl@lZl@

lZl@

[,Z_J@

l l 0l 0l Ol 0[,yj@

l NI@

l Zl@

lZ l 9 l 9 l 9 l@

3J 34 33 36 37 40 41 42 43 4

47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h g i ; o ! l At approximately 1200 on 10-22-80, the seal injection flow for each RCP was adjusted l

by manual throttle valves to 8 gpm without verifying the total flow (with the modula-When the STP was I

15 Iil Itinc sunniv valve F illy nnoni en b lo==

e%n ne n n,, a en u,,,.,

perfor=ed this problem was discovered and the flow'was adjusted to have a total flow I'I2I lof less than 31 epm.

This incident was discussed with the onerators invnived and 1

the governing operating procedure will be changed to add a precaution to check the l i i ll I total flow when individual flows are adiusted.

l t i l41 I l

7 3 3 80 ST

  • I, POW E 9 OTHER STATUS 85 o RY DISCOVERY DESCRIPTION l1_Q,j l l@ l1l0l0l@l N/A l

l B l@l Performance of surveillance tests l

i:

o a

45 o

ao CO0 TENT Av0uNT OF ACTIVITY @ l LOCATION OF RELEASE @

tC TiviTY b l 6 l d @n OF RELEASE l Z l@l RELEASE N/A l

N/A l

eERsONNEL ExPCsuEEs otsCRiPTioN@

NuuaER TYPE l i ! il l 0 l O l 0 l@l Z l@l N/A l

u ao j

PE RsONN E L iN;u'Ri ts NU'.99 E R

DESCRIPTION

ITT 1 10101 Ol@l N/A I

7 8 9 11 12 30 j

LOSS OF OR OAVAGE TO FACILITY Q i

TYPE O E SC RIP TION

%,,/

l1 l 9 l l Zl@l N/A l

7 s 2 so so NRC US ONLY h

issut @ DESCRIPTION l

N/A 1 2 0 1 () n 7 l

lisilitilirilj 2 o 7

8 3 10 68 69 30 7.

W. G. Hairston, III.

m g.(205) 990-5156 2,

mArcopene.Anc.