Forwards IE Insp Repts 50-369/80-11 & 50-370/80-07 on 800527-30 & Notice of Deviation
ML19344E427
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 06/17/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19344E420 List:
References
NUDOCS 8008280543
Download: ML19344E427 (2)


See also: IR 05000369/1980011

Text

em*

{

f M%q#o

UNITED STATES

!

~g

NUCLEAR REGULATORY COMMISSION

n

6

ti

y a

REGION 11

o,

[

101 MARIETTA ST

N.W., SUITE 3100

% *****/

ATLANTA, GEORGIA 30303

JUN 171980

In Reply Refer To:

RII:WHM

50-369/80-11

50-370/80-07

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by W. H. Miller, Jr. , of this office on

May 27-30, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-83

and CPPR-84 for the McGuire facility, and to the discussion of our findings held

with R. C. Rogers at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is dis-

cussed in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

Within the scope of this inspection, no items of noncompliance were disclosed.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and have safety significance.

This item is identified in the Notice of Deviation enclosed herewith as Appendix A.

Please nrovide us in writing within 20 days of your receipt of this letter your

comments including a description of corrective actions that have been or will be

taken, corrective actions which will be taken to avoid further deviations, and

the date corrective actions were or will be completed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regalations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprieta ry, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

8008280 %

'

---

-

- - -

--

-

.

,

Duke Power Company

-2-

'JUN 17198C

,

1

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

psy.g

I

C. E. Murphy, Ch

,

Reactor Construction and Engineering

,

Support Branch

-

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-369/80-11

and 50-370/80-07

cc w/ encl:

M. D. McIntosh, Plant Manager

P. O. Box 488

Cornelius, NC 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, NC 28242

!

i

!

l

l

i

i

l

\\

-

- -

-

- -

-

- -

-

- -

-

-

-

-

- -

-

- .

-

- - -

-

- -

-