ML19344A840

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/80-13 on 800321-28 & Notice of Violation
ML19344A840
Person / Time
Site: Crystal River 
Issue date: 04/14/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19344A824 List:
References
NUDOCS 8008220329
Download: ML19344A840 (2)


See also: IR 05000302/1980013

Text

1, I )

. ._ _. _ _ .

--

_ . . _

(

ss

-

.

i 9

4,pa necoy#o,'

'

UNITE 3 BTATES

e

!

NUCLEAR REGULARRY COMMISSION

n

.,

bg

$

I

REGION il

o,

[

101 MARIETTA ST., N.W., SulTE 3100

e

ATLANTA, GEORGIA 30303

      • a*

APR 1 41999

In Reply Refer To:

RII:AGW

50-302/80-13

Florida Power Corporation

ATTN:

J. A. Hancock, Director

Nuclear Operations

,

P. O. Box 14042, Mail Stop C-4

St. Petersburg, FL 33733

Gentlemen:

This refers to the inspection conducted by A. G. Wagner of this office on

March 21-28, 1980 of activities authorized by NRC License No. DPR-72 for the

Crystal River facility, and to the discussion of our findings held with G. R.

Westafer at the conclusion of the inspection.

'I

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinect requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

,

including:

(1) corrective steps which have been taken by you and the results

.

achieved; (2) corrective steps which will be taken to avoid further noncompli-

ance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Docum(st Room.

If this

-

.

report cont & ins any information that you (or your contractor) b-lieve to be

proprietary, it is necessary that you make a written application within 20 days

to this of fice to withhold such information from public disclosure. Any such

applfcation must include a full statement of the reasons on the basis of which

it is' claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application.is contained in a

separate part of the document.

If we do not hear from you.in this regard within

the specified period, the report will be placed in the Public Document Room.

.

6

6006220 W

.

. ~ .

-

-

.

.

Florida Power Corporation

-2-

APR 14193)

.

Should you have any questions concerning this let ter, we will be glad to discuss

them with you.

Sincerely,

E. c.

..

R. C.

ewis, Acting Chief

,

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-302/80-13

cc w/ enc 1:

D. C. Poole

Nuclear Plant Manager

P. O. Box 1240

Crystal River, FL 32629

.

it

-

.

.

a

-. .-

% r.W *

~

$

.

+ hem-

-

-