_ _.
U i
l i
I Ui M
P.o.o.. e,o.wr 30 April 1980 co 3-0-3-a-2 CS-80-134 i
Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcement Licensee No. DPR-72 U.S. Nuclear Regulatory Commission Ref:
RII:AGW l
101 Marietta Street, Suite 3100 50-302/80-13 l
Atlanta, GA 30303
Dear Mr. O'Reilly:
We offer the following response to the Item of Noncompliance in the referenced j
inspection report.
NOTICE OF VIOLATION As required by Technical Specification 6.8.3, temporary changes to procedures may be made provided the intent of the original procedure is not altered.
l Contrary to the above, on March 26, 1980, a temporary change to Operating Pro-cedure 414, Revision 5, Nitrogen and Hydrogen System, was used to supply helium to the "B" Steam Generator which was not in the original intent of the procedure.
Response
This Item of Noncompliance was discussed with the affected plant personnel, who were reminded that a temporary change to a procedure cannot be l
made if it changes the original intent of the procedure.
The applicability of i
temporary changes to procedures will also be discussed with all plant person-l nel. Additionally, a new procedure (PT-119) Leak Checking OTSG "C" with Heli-um, has been generated and implemented into the Plant Operating Quality Assur-l ance Manual as of 2 April 1980.
These corrective actions should prevent a re-currence of this deficiency.
Full compliance has been achieved.
Should their be further questions, please contact us.
Very truly yours, FLORIDA POWER CORPORATION AL+f
'"/ A v
M
.C, [,vd J. A. Hancock Nuclear Plan ( Matigger Asst. Vice President, Nuclear Operations Baynard(Viol)DM-27 8008220 22M 0.- m M t
General Office 32o1 in.nsounn street sou:n. P O Ben 1042. St Petersbu'g Flor.da 33733 e 813*-866 5151
_