ML19344A509
| ML19344A509 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 06/25/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19344A492 | List: |
| References | |
| NUDOCS 8008200528 | |
| Download: ML19344A509 (2) | |
See also: IR 05000413/1980012
Text
f
.
,
p>* U:0
9'o
UNITED STATES
c4
t
?
g
NUCLEAR REGULATORY COMMISSION
n
E
E
REGION 11
s
%.....p*['
~
o
101 MARIETTA ST
N.W.. SUITE 3100
ATLANTA, GEORCIA 3o303
JUN 2 51980
In Reply Refer To:
RII:GFM
50-413/80-12
50-414/80-12
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by G. F. Maxwell of this office on
May 1-30, 1980, of activities authorized by NRC Construction Permit Nos. CPPR-116
and CPPR-117 for the Catawba facility, and to the discussion of our findings
held with at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed
report.
During this inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of our receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncom-
pliance; and (3) the date when full compliance will be achieved. With regard to
item B, corrective actions to prevent recurrence were completed prior to
conclusion of this inspection; therefore, a reply is not requested for this item.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietarf, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
800820'0 7 [
F
.
.
.
f
Duke Power Company
-2-
JdN 2 51980
Should you have any questions cor.cerning this letter, we will be glad to discuss
them with you.
Sincerely,
h{
f
C. E. Murphy, Chie
Reactor Construction and Engineering
Support. Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/80-12
and 50-414/80-12
< v/ encl:
W. Hampton, Station Manager
.
G. Beam, Project Manager