05000364/LER-1981-001-03, /03L-0:on 810310,personnel Air Lock Declared Inoperable Prior to Completion of Initial Fuel Loading. Caused by Vent Valve Const Error.Operating Linkage Was 90 Degrees from Indicated Position.Linkage Reinstalled

From kanterella
(Redirected from ML19343D162)
Jump to navigation Jump to search
/03L-0:on 810310,personnel Air Lock Declared Inoperable Prior to Completion of Initial Fuel Loading. Caused by Vent Valve Const Error.Operating Linkage Was 90 Degrees from Indicated Position.Linkage Reinstalled
ML19343D162
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 04/06/1981
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19343D161 List:
References
LER-81-001-03L, LER-81-1-3L, NUDOCS 8104090643
Download: ML19343D162 (1)


LER-1981-001, /03L-0:on 810310,personnel Air Lock Declared Inoperable Prior to Completion of Initial Fuel Loading. Caused by Vent Valve Const Error.Operating Linkage Was 90 Degrees from Indicated Position.Linkage Reinstalled
Event date:
Report date:
3641981001R03 - NRC Website

text

.. - -... - -..............

i I

i i I40 gc9motstoceI iPtE2sE raiuT oR TvP Att aEcuiaEo inroa=ATiosi l A I L l J lM l F l1 !@l OI Ol l 0101 O l 010 I - l 010 I@6411 Il Il 11 l@l__L_l @

o 1 L10ENSE NuvaER 25 LtCENSE TvPE JO 57 Gaf 64 7

8 3 LtCENSEE CCOE I4 15 con'T E

$cs ll' l@l015 10 10 10 13 15 14 l@l 01311101811 @l 01 a l 01614 l 1 l@

i 8

60 63 OOCuCET NUM8ER 68 63 EVENT DATE 74 75 R EPOR T OATE S3 EVENT DESCRIPT1oM AND PROSAstE CONSEQUENCES h 10121 i At 11:45 on 3-10-81, and orior to comoletion of initial fuel loadiro.- the oorsnanal i

ITTil I air lock was declared inocerable due to a vent valve construction error which crovidedl Io o i l a potential path from the containment buildino to the Auxiliary Buildino. Tech. Soec. I g o s si ; 3.9.4, in part, requires the personnel air lock to be operable. Uoon discovery of thel ioisi ; condition, Tech. Saec. 3.9.4 action statement recuirements were met. Followino correc-1

oi2; ; tive actic'n, the air lock was returned to service at 1315 on 3-10-81. The health /

I nota I safety of the ger.eral public was not affected.

I 1

OE E

SU E

CC%tPONENT CODE

$8 $E

$4 3

loisi is lA l@ LB.J@ l c I@ Iz Iz 12 Iz Iz Iz I@ Iz l@ II I@

7 8

9 30 ft 12 13 IS 19 23 SECUENTIAL OCCURRENCE REPORT REV353oN g o, po EVENT YEAR REPORT NO.

CCCE TYPE N O.

O.";j.E I8l1l L_1 10 lo 11 I tr_1 I0I3i LL__j l-l [0]

23 22 23 24 26 27 25 29 30 38 32 7

r.

A CNP

  • T M M HOUR $

$ 8%4 D

FOR?.s 5.

PPLIE 1% FA RER LEJ@ls l@

lzI@

Izl@

l 01 01 01 01 ll]@

LEJO I z l@ IzI9I9I9l@

32 34 05 35 37 40 41 42 43 44 47 CAUIE oESCRIPTioN ANo CORRECTIVE ACTIONS h w=<

l I i i Il I,_y.

,v-c.,rranco ic =++ris.r=x1. +, =

c--e+r.,

+4-n error.

The neer=+ing linu ca FlT1 I installed in such a way that the valve was 90' from the indicated cositic'i which I

1211 resulted in the valve being open when the outer air lock door was closed. The valve 1

ii is t al I linkage was installed correctly and proper valve operation verified. Surveillance 1

,,,,,; test procedures have been revised and issued to require verification of the*ccrrect I

so T

s s position of tne vent valve.

'YAN

% power QTHER STATUS 15CC RY DISCOVERY DEOCR:PTICN Ii isI (H j@ l 0 [ 010 l@l NA l-l Al@l Operator observation l

a ETrviTv Cc'SrEu?

AucuNTo, ACTiviTv @ I

. oCiTioN o, RaEAsE @-

RuEAsE@3 c, auf.sELIJ@l I

na l

Lz.J nA i s 7

8 3 to 13 44 45 53 PE As M il EXPQ$QRES TYPE @l NA I

CESCRIPTION NUVS E.4 li i rl 1010 lo l@l l

' ' ERsm El'muns oEsCRi,neN@ NA

' l Nu..u R FITl 101010 I@l 7

8 9 11 12 63 LCSS 08 CR CauACE TO FAC:LtTV TYPE D ESCRIPTION Fits 1 [_z_j@l nA I

83 y

8 9 to PVE' iC17Y Ngcgggc3ty ISSUE a OE50R*PTION

!: l ol l N [@l NA I

!IIl!IlillIIII 69 63 sa ;

r s 9 10 NAME OF PREPARER PHONE:

8104090 N