text
.
Ie
?
=mc pere 36e U 5. NUCLE A2 AttutatOfet CouwessioN APM.OYED OMS NO 3190 0$0e LICENSEE EVENT REPORT (LER)
*"'S**'
F ACILITY N AME lit Doc u t t Nuwet R 121 PAGE il TITLE tai 2
o l5 l 0 l0 l 0131614 1lOFl011
.!m o n h f.'
Farlev - Unit Scecial Reoort:
Fire Darcer Incoerable Due To Failure To Close With Air Flow Ev4NT Catt it!
L E m Nuws E n 16 R EPont Datt in 0?Hin F ACILIttEl INVOLvtD 't.
VON'a 04v vtAR vtas Q
"'j,Q VONT Das 4 EAR Pactuf v Nauts DOcalT Nuvstm s
6 0 1510 1010 1 I I d1 1l 9 '
8 8
d8
~
0l 0l1 0l0 Of 1 1l 5 8l 8 0 1 5 1 0 1 0 1 0 1 I l tw's at* Cat is suswittio runsva%t to tal atoviatut%ts Os to Co n i <cu... e< we e',a* re4.+s> nii "Oc t 5 '
I ro sott to i.i no ?3142H vi 73 7,
- n 405.H1Hd 60 34. emit 60 73.H2Hvl 7 3.71 tet o.,
i ni n n o no-n..u,,
n,nu,..,
^
- ,t,j;p,.;,g g.,
n o.,n,,_,
.., >. u, n,,
,1.uin
, Ai m,
n o.ui,-
- 71. ", ".,
,. n n.. H.,
n <.i n n.,
l so i2.uiu.,
Special Report per so,a.uan.'
Toeh Snpr. 3.7.I?
LICEN$tt CO% tact FOR tMil Lim (131 NAVE t t LE*=0%E %.vtf o aeta CGO4 l 5,6 J. D. Woodard, General Manager - Nuclear Plant a05 899 i i S i 1
1 i i
CCveLitt ONE Li%E FOR E ACM COW'ONENT F AILynt DisCaistD IN twit at*047113, CALSE f v s T t '.'
C OV'C % E N' N h
'a ijn
'o genD'f em 3 CAL 80 S Y STIU COV'ONENT I
I I I I I I I
I I I I I i i
l i l I I,
I I I !
I I I tverts wt NT AL REPORT IIPECTf D 114-WQNtm Day vtam Yskg,$?
18 5 tres es cong e., p art:rgg gg gy $3,.cs ga yg, p
uitAC7,o-,,,,,x.-.,..,-..-.,.....,,.m.,,,,.,,,,,..,n..
(
On 7-13-87, FNP sul;nitted a special Report (LER 87-011-00) concerning inoperable control roon fire darpers.
As a result, a fire damper naintenance and testing program is in progress. As a part of this program, on 1-11-88, fire damper 121-116-05 was tested and would not close with air flow in the system.
This event was caused by design deficiency ir that the fire damper will not close fully with air flow.
Design changes have been initiated to evaluate the options available and provide the appropriate design to ensure the proper operation of the fire dampers.
These design changes are expected to be implenented within the next six months.
Technical Specification 3.7.12 requires these fire dampers to be returned to operable status within seven days or a Special Report must be submitted within the following 30 days.
Therefore this Special Report is being submitted.
All Technical Specification action statement requirements for the fire damper are being ne t.
ll 8802220033 880115 PDR ADOCK 05000364 S
DCD
5 A!atama Fower Cem;c.
600 Nort* 15tt Stre et Pest O't ce 8? If 49 Beir;*a-A:arama 3529' :o Ie4 0*"s e 22 5 Ef 9-ib3 f a
L A. P. Mcdonald Alabama Power
<-,me c.e, - -.
ve samen ecc s>vem r ebru a ry 15, 1988 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTN: Docurent Control Desk Washington, D.C.
205b5
Dear Sir:
Joseph M. Farley Nuclear Plant - Unit 2 Licensee Event Report No. LER 88-001-00 Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Report No. LER 83-001-00 is being submitted in accordance with 10CFR50.73.
If you have any questions, please advise.
Respectf ul,1y70bmi t t ed,
- - 3 o I
i /)/, n s -
' 41
' (L s
s R. P. Mcdonald RPM / JAR: dst-D-LER Enclosure cc:
IE, Region 11
$6
'l
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000348/LER-1988-001-01, :on 880114,unauthorized Contractor Employee Entered Main Control Room.Caused by Personnel Error. Contractor Escorted Out & Counseled.Local Alarm Installation & Applicable Training Programs Planned |
- on 880114,unauthorized Contractor Employee Entered Main Control Room.Caused by Personnel Error. Contractor Escorted Out & Counseled.Local Alarm Installation & Applicable Training Programs Planned
| | | 05000364/LER-1988-001, :on 880111,discovered Control Room Fire Damper Inoperable.Caused by Design Deficiency.Deficiency Changes Initiated to Evaluate Options.Design Changes Will Be Implemented within 6 Months |
- on 880111,discovered Control Room Fire Damper Inoperable.Caused by Design Deficiency.Deficiency Changes Initiated to Evaluate Options.Design Changes Will Be Implemented within 6 Months
| | | 05000364/LER-1988-002-01, :on 880218,Tech Spec 3.0.3 Entered When Fire Damper in Filtration Sys Common Suction Line Closed.Caused by Personnel Error.Design Change Initiated to Ensure Proper Operation of Fire Damper.Personnel Counseled |
- on 880218,Tech Spec 3.0.3 Entered When Fire Damper in Filtration Sys Common Suction Line Closed.Caused by Personnel Error.Design Change Initiated to Ensure Proper Operation of Fire Damper.Personnel Counseled
| | | 05000348/LER-1988-002, :on 880120,master Override Switch for Pyrotronics Panel Found in Override Position,Causing Preaction Water Protection Sys to Be Inoperable.Caused by Personnel Error.Individual Counseled |
- on 880120,master Override Switch for Pyrotronics Panel Found in Override Position,Causing Preaction Water Protection Sys to Be Inoperable.Caused by Personnel Error.Individual Counseled
| | | 05000364/LER-1988-003, :on 880223,fire Dampers Tested Inoperable Due to Failure to Close W/Air Flow in Sys.Caused by Design Deficiencies.Design Changes Initiated |
- on 880223,fire Dampers Tested Inoperable Due to Failure to Close W/Air Flow in Sys.Caused by Design Deficiencies.Design Changes Initiated
| | | 05000348/LER-1988-003, :on 880212,discovered Special Rept Required by Tech Spec 3.7.12 for Inoperable Fire Door Not Submitted. Caused by Personnel Errors.Individuals Responsible Counseled |
- on 880212,discovered Special Rept Required by Tech Spec 3.7.12 for Inoperable Fire Door Not Submitted. Caused by Personnel Errors.Individuals Responsible Counseled
| | | 05000348/LER-1988-004, :on 880219,hourly Fire Watch Patrol Not Established as Required.Caused by Personnel Error.Fire Watch Patrol Established & Personnel Counseled |
- on 880219,hourly Fire Watch Patrol Not Established as Required.Caused by Personnel Error.Fire Watch Patrol Established & Personnel Counseled
| | | 05000364/LER-1988-004, :on 871113,insp of non-plugged Tubes in Steam Generators Confirmed Degradation Indications at Tubesheet & Support Plate Locations.Caused by Antivibration Bar Wear & Stress Corrosion Cracking.Tubes Plugged |
- on 871113,insp of non-plugged Tubes in Steam Generators Confirmed Degradation Indications at Tubesheet & Support Plate Locations.Caused by Antivibration Bar Wear & Stress Corrosion Cracking.Tubes Plugged
| | | 05000364/LER-1988-004-01, :on 880315,fire Watch Patrol Not Established as Required.Shift Foreman Failed to Recognize Penetration Released to Be Breached as Fire Barrier Penetration.Caused by Personnel Error.Shift Foreman Counseled |
- on 880315,fire Watch Patrol Not Established as Required.Shift Foreman Failed to Recognize Penetration Released to Be Breached as Fire Barrier Penetration.Caused by Personnel Error.Shift Foreman Counseled
| | | 05000364/LER-1988-005-01, :on 880501,failure to Perform Hourly Fire Watch Patrol Required by Tech Spec 3.7.12 Discovered.Caused by Personnel Error.Shift Foreman Involved in Event Counseled |
- on 880501,failure to Perform Hourly Fire Watch Patrol Required by Tech Spec 3.7.12 Discovered.Caused by Personnel Error.Shift Foreman Involved in Event Counseled
| | | 05000348/LER-1988-005, :on 880226,fire Door 453 Inoperable for More than 7 Days.Caused by Broken Latching Device.Lock Set on Door Replaced & Door Declared Operable on 880227 |
- on 880226,fire Door 453 Inoperable for More than 7 Days.Caused by Broken Latching Device.Lock Set on Door Replaced & Door Declared Operable on 880227
| | | 05000348/LER-1988-006, :on 880301,determined That Hydrogen Accumulating in Supply Line from RHR Pump.Caused by Piping Configuration in Layout of Train Supply Line A.Hydrogen Vented from Piping.Periodic Program Initiated |
- on 880301,determined That Hydrogen Accumulating in Supply Line from RHR Pump.Caused by Piping Configuration in Layout of Train Supply Line A.Hydrogen Vented from Piping.Periodic Program Initiated
| | | 05000364/LER-1988-006-01, :on 880417,inoperable Fire Detection Sys 2A-22 Could Not Be Returned to Svc within 14 Days,Per Tech Spec 3.3.3.9.Caused by Investigation Into Cause of Spurious Alarm That Made Sys Inoperable.Sys Will Be Repaired |
- on 880417,inoperable Fire Detection Sys 2A-22 Could Not Be Returned to Svc within 14 Days,Per Tech Spec 3.3.3.9.Caused by Investigation Into Cause of Spurious Alarm That Made Sys Inoperable.Sys Will Be Repaired
| | | 05000348/LER-1988-007, :on 880306,both 1A & 1B Battery Were Inoperable for 19 Minutes & Tech Spec 3.0.3 Entered.Caused by Failure of 1B Battery Charger While Swing Charger 1C Aligned to 1A Battery.Failed Parts Replaced |
- on 880306,both 1A & 1B Battery Were Inoperable for 19 Minutes & Tech Spec 3.0.3 Entered.Caused by Failure of 1B Battery Charger While Swing Charger 1C Aligned to 1A Battery.Failed Parts Replaced
| | | 05000348/LER-1988-008, :on 880420,during Current Cycle 8 - 9 Refueling outage,17 Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Tubes Plugged |
- on 880420,during Current Cycle 8 - 9 Refueling outage,17 Tubes Exceeded Pluggable Limit Based on Eddy Current Testing Results.Tubes Plugged
| | | 05000348/LER-1988-009, :on 880412,fire Dampers Discovered Inoperable. Caused by Design Deficiency.Design Changes Initiated to Evaluate Options Available & Provide Appropriate Design to Ensure Proper Operation of Fire Dampers |
- on 880412,fire Dampers Discovered Inoperable. Caused by Design Deficiency.Design Changes Initiated to Evaluate Options Available & Provide Appropriate Design to Ensure Proper Operation of Fire Dampers
| | | 05000348/LER-1988-010, :on 880411,determined That Individually Neither of Control Room Pressurization Units Able to Maintain Required Pressure of at Least 0.125 Inches Water Gauge. Caused by Open Penetrations |
- on 880411,determined That Individually Neither of Control Room Pressurization Units Able to Maintain Required Pressure of at Least 0.125 Inches Water Gauge. Caused by Open Penetrations
| | | 05000348/LER-1988-011, :on 880413 & 0505,Tech Spec 3.7.12 Violated. Caused by Containment Personnel & Equipment Hatches Being Open for More than 7-day Limit.Personnel & Hatches Will Be Closed Prior to Entry Into Hot Shutdown |
- on 880413 & 0505,Tech Spec 3.7.12 Violated. Caused by Containment Personnel & Equipment Hatches Being Open for More than 7-day Limit.Personnel & Hatches Will Be Closed Prior to Entry Into Hot Shutdown
| | | 05000348/LER-1988-012, :on 880421,fire Hose Station N1V43-D-128 Inoperable for More than 14 Days.Caused by Inability to Effect Timely Repair of Broken Valve.Valve Will Be Repaired as Soon as Replacement Parts Arrive |
- on 880421,fire Hose Station N1V43-D-128 Inoperable for More than 14 Days.Caused by Inability to Effect Timely Repair of Broken Valve.Valve Will Be Repaired as Soon as Replacement Parts Arrive
| | | 05000348/LER-1988-013, :on 880425,fire Detection Sys 1A-22,disabled on 880411 to Support Mods to Containment Cooler Svc Water Piping,Not Returned to Svc within 14 Days.Caused by Scope of Work.Rept Submitted Per Tech Spec 3.3.3.9 |
- on 880425,fire Detection Sys 1A-22,disabled on 880411 to Support Mods to Containment Cooler Svc Water Piping,Not Returned to Svc within 14 Days.Caused by Scope of Work.Rept Submitted Per Tech Spec 3.3.3.9
| | | 05000348/LER-1988-014, :on 880424,fire Barrier Penetration 17-139-9 Breached.Caused by Failure to Fill Up Forms for 880417 Breached Penetration.Penetration Sealed & Personnel Reinstructed Re Breaching Penetration |
- on 880424,fire Barrier Penetration 17-139-9 Breached.Caused by Failure to Fill Up Forms for 880417 Breached Penetration.Penetration Sealed & Personnel Reinstructed Re Breaching Penetration
| | | 05000348/LER-1988-016, :on 880525,fire Door 408 Inoperable for More than 7 Days.Caused by Damage on Door Secured in Open Position to Facilitate Access While Doing Work in Area.Door Repaired & Returned to Functional Status |
- on 880525,fire Door 408 Inoperable for More than 7 Days.Caused by Damage on Door Secured in Open Position to Facilitate Access While Doing Work in Area.Door Repaired & Returned to Functional Status
| | | 05000348/LER-1988-017, :on 880615,Tech Spec Action Requirement Not Met for Inoperable Fire Hose Station in That Addl Hose Not Brought to Area within 1 H.Caused by Personnel Error. Day Shift Sys Operator Counseled |
- on 880615,Tech Spec Action Requirement Not Met for Inoperable Fire Hose Station in That Addl Hose Not Brought to Area within 1 H.Caused by Personnel Error. Day Shift Sys Operator Counseled
| | | 05000348/LER-1988-019, :on 880928,fire Detection Sys Declared Inoperable for More than 14 Days.Caused by Spurious Alarm Which Would Not Clear.Fire Detection Sys Repaired During Unscheduled Outage |
- on 880928,fire Detection Sys Declared Inoperable for More than 14 Days.Caused by Spurious Alarm Which Would Not Clear.Fire Detection Sys Repaired During Unscheduled Outage
| | | 05000348/LER-1988-020, :on 881012,discovered That Sprinkler Fire Protection Sys Inoperable Since 881006,violating Tech Spec 3.7.11.2.Caused by Personnel & Improper Planning,Testing & Restoration.Workers Involved Counseled |
- on 881012,discovered That Sprinkler Fire Protection Sys Inoperable Since 881006,violating Tech Spec 3.7.11.2.Caused by Personnel & Improper Planning,Testing & Restoration.Workers Involved Counseled
| |
|