05000364/LER-1985-001, :on 850119,nine Tubes in Steam Generator 2A Plugged Based on Eddy Current Testing Results.Cause Not Stated

From kanterella
(Redirected from 05000364/LER-1985-001)
Jump to navigation Jump to search
:on 850119,nine Tubes in Steam Generator 2A Plugged Based on Eddy Current Testing Results.Cause Not Stated
ML20101T726
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/28/1985
From: Mcdonald R, Woodard J
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
LER-85-001, LER-85-1, NUDOCS 8502060321
Download: ML20101T726 (1)


LER-1985-001, on 850119,nine Tubes in Steam Generator 2A Plugged Based on Eddy Current Testing Results.Cause Not Stated
Event date:
Report date:
3641985001R00 - NRC Website

text

-_ -

senc W aos U.S. NUCLEAR REOULATORY.

APPROvt0 case NO.3150-(104 LICENSEE EVENT REPORT (LER)

'*""8'**

PACILITV psAmet (11 DOCEET NUtWER tal F8ME N Joseph M. Farley - Unit 2 o Is l o lo l o l3 l 6l 4 1 lOFl 0l 1 TITLE tel Steam Generator Tube Plugging EVSeff DATE (Si LER 90URADER (el REPOftT DATE (7)

OTHER PACILITIES serv 0LVED IBl MONTH DAY YEAR YEAR

~ 'I,, u a

- w" MONTM OAY YEAR P AC8LITY names DOCKET Nut #SER(S)

L o islo g oloi i l 0 l1 1l 9 85 8l5 0l0 l1 0 l0 0l1 2l8 8 l5 ois10 ioioi l i

~

~

THet REPORT IS SUstelTTED PURAUANT TO THE REOUIREasENTS OF 10 CPR j: IChoct sae er mere of sne fonew4P pll OPERATises b

20.483M 30.405(el SS.730sl@Hivl 73.71M se.73deHalM 73.718el Pousta M.4054eH1HO se.asteH1B

_2 Ogg,yg n.)

i p

.73.el..v.)

m HiH.I

== l.

30.4854 ell 1HW)

K731eit3H4 30.731e}@HumHA)

Jagdi E4884sH150vl go.73teH3Hul 88.73deH3HumHet s.

K4AS4eH1)M 30.734eH3Het 30.734elt3Hal LICENSEE CO88 TACT POR TMas LER tial NAME TELEPHONE NUMSER AREA CODE J. D. Woodard 2l 0 l5 8l9l9 1 5 l1 l5 l 6 t

CoasPLETE ONE LINE FOR EACH COaAPONENT PAILURE DESCRISEO IN TMtB REPORT (130 UA UA AE" N

A

$$N C#,USE SYSTEM COMPONENT TU T

PR

CAUSE

SYSTEM COMPONENT ss i

I I I I I I I

i i i l i I

'^

l l l l I I I I

I I I I I I suPPtEMENTAL REPORT ExPECTEO nes MONTw OAv lvEAR U. Min ON

  • A"

^l vEs uf

,N evecreo suomwOn oArts Tl

,,0 l

l l

P A.sTRACT m =,=

a. R e-P nR e-

,P--.

e., o i The following steam generator tube plugging report is submitted in accordance with Technical Specification 4.4.6.5.a.

During the Unit 2 Cycle III-IV refueling outage, a total of nine tubes were plugged in the 2A steam generator based on eddy current l

testing results. Of these nine tubes, three exceeded the pluggable limit. The remaining six tubes were plugged as a precautionary measure because there was evidence of tube wall degradation.

Additionally, one tube was plugged in the 2B steam generator because an eddy current probe was stuck in the tube. Tube plugging was completed 1-19-85.

The complete results of the steam generator tube inservice inspection.will be reported in accordance with Technical Specification 4.4.6.5.b.

8502060321 850128 ~

PDR ADOCK 05000364>

S PDR-

>h R. P._ 3 Gr43) l

Mailing Address

~

. h --

Alibima Power CompIny -

C

. 600 North 18th Str3ct Post Office Box 2641

- Birmingham, Alabama 35291 Telephone 205 783-6090 R. P. Mcdonald Senior Vice President Flintridge Building AlabamaPower t?v sourtem em:rc sts%vn January 28, 1985
- Docket No. 364

.DocumentControldesk U. S. Nuclear Regulatory Comission Washington, D.C.-20555

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 2, Licensee Event Report

.No. LER 85-001-00 is forwarded in accordance with Technical Specification 4.4.6.5.a.

If you have any auestions, please advise.

Yours very tr j

Q. P. McDonal d RPM: sam Enclosure xc: IE, Region II 4

S