O JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS NOVEMBER, 1980 There was one Unit shutdown in the month of November.
The following safety-related maintenance was performed in November:
1.
Rebuilt #10 river water pump.
2.
Repaired lube oil strainer on 2B charging pump.
3.
Repaired Main Steam Isolation Valves.
4.
Began modification of Service Water Lube and Cooling piping.
5.
Repaired 3 Safety Injection check valves (seat leakage).
6.
Performed miscellaneous maintenance on Diesel Generators.
7.
Replaced fiber optics lamps on control room chlorine detectors.
8.
Began implementation of main control board modifications recommended as a result of human factors evaluation.
9.
Began implementation of NUREG-0578 requirements.
a.
Reactor vessel head venting system.
b.
Auxiliary feed water flow indication to steam generators.
c.
High range containment radiation monitor.
d.
On-site Technical Support Center / operations Support Center.
e.
Containment pressure monitor.
f.
Backup air compressor for Turbine Driven AFW pumps.
g.
Plant shielding review.
h.
Operation of Power Operated Relief Valves after containment isolation.
80121a060Lp
=
OPERATING DATA REPORT DOCKETNO. _50-348 DATE __12/1/80 COMPLETED BY W.G.
Hairston, III TELEPHONE DOOR 99-5156 OPERATING STATUS
- 3. Unit Name:
J seph M. Farley - Unit 1 Notes 1) Cumula'tive tata
- 2. Reporting Period:
November. 1980 since 12/1/77, date of
{
- 3. Lic.msed Thermal Power (MWt):
2652 c mmercial operation.
1
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe):
829
- 6. Maximum Dependable Capacity (Gross MWe):
844.6 r
- 7. Maxirnum Dependable Caaacity (Net MWe):
803.6
- 8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7)Since Last Report.Give Res.ns:
N/A
- 9. Power Level To Which Restncted,If Any (Net MWe):
^
- 10. Reasons For Restrictions,if Any:
W^
~
This heh YrAm.Desa.
r-t-* %
II. Hours In ReportinE Period 720 8 040 26.304 g
- 12. Number Of Hours Reactor Was Cntical 169 6,246.8 17,182.3
[
- 13. ReactorReserve Shutdown Hours 0
1,d41.5 2,446.8
- 14. Hours Generator On-Line 16R*
6.T17.9 16 70L 4 e
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 382,570 15,391,877.4_
41.989,89I.8
- 17. Gross Electrical Energy Generated (MWH) 122,664 4.895.370 _ 13.419.408
- 18. Net Bectrical Energy Generated (MWH) 110,970 4,608,144 12,612,152
- 19. Unit Service Factor 23.3 76.0 63.5 l
- 20. Unit Availability Factor 23.3 76.0 63.5
- 21. Unit Capacity Factor (Using MDC Net) -
19.2 71.3 59.7
- 22. Unit Capacity Factor (Using DER Net) 18.6 69.1 57.8
- 23. Unit Forced Outage Rate 00.0 06.1 06.9
- 24. Shutdowns Sched.ded Over Next 6 Months (Type. Date.and Duration of Each1:
t
~
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
January, 881
- 26. Units In Test Status (Prior to Commercial Operatiosp:
Forecast Achiesed i
INITIAL CRITICALITY R/6/77 g /77 i
~
INITIAL ELECTRICITY
_8/20/77 8/18/77 COMMERCIAL OPERATION 12/1/77 12/1/77 Fill) ped +
-,. _ _ ~
AVLtAGE DAILY UNIT POWER LEVEL
.o DOCKET NO.
50-348
'r l
i.
WT DATE 12/1/80 COMPLEF,D BY 11. G. Hairston, III t
TELEPHONE (205)899-5156 MONTH November, 1980 d
DAY AVERAGE DAILY POWER LEVEL,
DAY AVERAGE DAILY POWER LEVEL (MWe. Net)
(MWe-Net) 3, 722 37 0-721 0
gg 2
3 19 696 0
4 20 683 5
21
680 0
6 22 626 0
7 23
(
0 0
8 24 0
0 9
25 0'
10 26 0
0 11 27 0
0-12
. 28 0
0 13 29 0
14 0
30 0
15 31 0
16 INSTRUCTIONS On this format. list the sverage daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole meg 2 watt.
i L
,e e
e
~
s 4
f DOCKET NO.
50-348 LINil'SlHill) OWNS AND POWER REI)UCllONS UNIT NAME J.M. Farlev - Unit i DATE 12/1/80 COMPLETED BY A C. Elai r s ton. III REPORT MON 181 November. 1980 TELEPHONE (7051899-51'i6 I
?.
I
.$ 3 Y
Licensee E-s, fg Cause & Corrective No.
Date g
5g 2s5 Event gg pu Actiam to j
f5 5
U y, g Report a mO Psevent Recurrence H
g g
b 072 801107 S
552 C
1 NA RC ZZZZZZ Unit was taken off line for refueling.
Y
)6 9
, 6 0
' 2E'E) 6 D
h?'el b eD W
D b
I I
2 3
4 F: Forced Reason:
MethoJ:
Exhibit G Instsuctions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test
- 2. Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D. Regulatory Restriction 4 Other (Explain) 0161)
E-Operator Training & Eicense Examination F-Administrative 5
G.Oper.itional Euros (Explain)
Exlubit ! Same Source (9/77)
Il-Other (E xplain) i