ML19343B252
| ML19343B252 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/10/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19343B253 | List: |
| References | |
| NUDOCS 8012160403 | |
| Download: ML19343B252 (1) | |
Text
.
Atbamn Power C mpany 600 North 18th Street Post Off.ca Box 2641 Birmmgham, Alabama 35291 Teiephc.le 205 250-1000 F. L. CLAFON, JR.
Sen.or Vice President gggg3 gg,g the sournem erectic system December 10, 1980 Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the November,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, A
re u*
%' [ iYa4.p h4 /s F. L. Clayton, Jr.
FLCJr/JRC:bhj Attachments cc:
Mr. Ted Cintula (1 copy)
CDirector, IE (10 copies)
Direct'oi, RII (1 copy)
~~
ij q
=
8012160 W