05000348/LER-1980-058-03, /03L-0:on 801007,discrepancies Between Tendon Installation QC Records & as-found Conditions Detected. Visual Insp Planned to Verify QC Records on All Tendons Which Will Be Tested in 1981

From kanterella
(Redirected from ML19339B645)
Jump to navigation Jump to search
/03L-0:on 801007,discrepancies Between Tendon Installation QC Records & as-found Conditions Detected. Visual Insp Planned to Verify QC Records on All Tendons Which Will Be Tested in 1981
ML19339B645
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/04/1980
From:
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19339B644 List:
References
LER-80-058-03L, LER-80-58-3L, NUDOCS 8011070374
Download: ML19339B645 (2)


LER-1980-058, /03L-0:on 801007,discrepancies Between Tendon Installation QC Records & as-found Conditions Detected. Visual Insp Planned to Verify QC Records on All Tendons Which Will Be Tested in 1981
Event date:
Report date:
3481980058R03 - NRC Website

text

_

a (7 77)

A LICENSEE EVENT REPORT U~

ca.NTaOt stxc l l

I I

l@

(PLE ASE IT,1NT o A TYPE A!.L RICUIRED INFORes4TICMI 1

6 lo l1l l Al Ll Jl Ml Fl 1l@l 0 l 0 l -l 0 l 0 l 0 l 0 l 0 l - l 0 l 0 l@l 4 i l 11 l 1 l 1 l@l l

l@

7 3 9 LICENSEE CC]E 14 15 LICENSE NUV8EH 25 26 LACE'.SE TYPE J0 57 CAT $8 CON'T lol1i Sc,y l Ll@l 0l 5 l 0 l 0 l 0 l 3 l 4 l 8 @l 1 l 0 l 0 l 7 l 8 l 0 @l1 l 1l 0 l 4 I 810 l@

"E' 7

6 60 61 DOCK!T NU'.tBER 68 69 EVENT DATg "a

'5 REPORT DATE 80 i

EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h 10121 IIn accordance with our discussions with the NRC staff on Oc:ober 7,1980, the followingl g lis submitted. The three-year containment tendon surveillan:e performed in accordance l l o 14 l lwith surveillance test procedure #FNP-1-STP-609.0 revealed :nexOected tendon lif t-off l

?

j l o l s l l forces. In addition, discrepancies between tendon installation QC records and "as l

lalsllfound" conditions were detected. The health and safety of :he public were not affected)

]

l o l 71 I l

Lt.

l ois i l I.

I 1

7 sS so q SYSTEM

CAUSE

CAUSE COva.

VALVE CODE CODE SUSCODE COMPONENT CODE T43C :E SUSC00E I sl AIO LP_J@ l z l@ l zl zl zi zi zl zl@ l zi@ tz.J @

o 9 7

8 9

10 11 12 13 13 19 20 J

SEQUENTIAL OCCURRENCE RE80RT REvaSloN (ga ag EVENT YEAR REPORT No.

CODE ME No.

h reg l218l0l l-l l015l8l y

l 0l 3l lLl l-l

[ Oj 22 2J 24 26 27 28

.)

3; 31 32_

7K A

O ONP NT ME O MOURS 22 SB IT FOR 3 9.

SL, LE MA' UF AC RER

' -~

lXl@lXl@

lZl@

[ Z_J@

l 0 l010 l0 l ly l@

lN ]@

lZ l@

l Zj9 l9 l9 l@

33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h 11101 fro clear up the anomalv observed in the lif t-of f forces. A1E'aara Po.rer is advanch the l ITTi l ifive year surveillance to the spring of 1981. In addition, all tendons covered under I

,, i,i ithe three-year surveillance program will have their lif t-off forces checked at this l

11131 Itime.

l l

(SEE ATTACHED FOR CONTINUATION) l i A 7

8 9 80 iTNNS

. PC.*. E R OTH ER STATUS

$50 Y

.'-300, Eav ;ESCR'PTION

[ t_1.5.J lE l@ l 1 l 0 l 0 l@l NA l

[

l@l Surveillance Test l. ).Eti l

ACTIV6 TY CC TENT RELEASED OF RELEASE AMOUNT OF A0TIV67Y

.0CATt N oF Ra'LE ASE

'4h O,d*

y lZ l @ l 2 l@l NA l

l j'$

7 8 3 10 11 44 45

~ go.

b,

,j PER$0NNEL EXPOSURES NOUGER TYPE DESCRIPTION 39 E.

d,# N h d 10101 Ol@lz l@l NA l9

^

  • a

' ERSo w EL m uViES oEScaierioN@"A

~uMuR li la l 1 01 01 01@l I

7 8 9 11 12 80 4

LOSS oF oR OAVAGE TO FACILITY TYPE D E SCRIPTION L'_loJ lz._l@l NA l

7 d 3 10 80 i;SdUE @DE CRIPTION t

l NA I

lllIIIIIlllll,i 2 o 7

8 3 to 63 63 80 3 [205] 899-5156

{

NAVE OF PREPARER P-t N E.

8 011070y7g

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS (27)

The calibration of the rams used'in the surveillance test is the primary suspect contributing to the lift-off force anomaly.

Ra= calibration will be carefully ensured and verified using approved procedures. ? cst-surveillance calibration will be performed and lift-off data verified prior :o completion of the contract.

If the anomaly cannot be tied to the ram calibratics, appropriate action required by technical specifications will be taken.

To resolve possible discrepancies in dccumented tendon installation. ;isual inspections are planned to verify QC records on all tendons which will be tested

. in the spring of 1981. Such visual inspections could be expanded as a result of 4

these findings.