Responds to NRC Re Violations Noted in IE Insp Rept 50-029/76-10.Corrective Actions:Plant Personnel Responsible for Source Checks Have Been Instructed to Perform Checks at Intervals Not to Exceed Six Months
ML19339B396
Person / Time
Site: Yankee Rowe
Issue date: 06/07/1976
From: French J
YANKEE ATOMIC ELECTRIC CO.
To: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19339B392 List:
References
WYR-76-66, NUDOCS 8011060845
Download: ML19339B396 (2)


Text

.___

e-.d f it C h Y t G A N Y4 i,

,% ne (..

p Telephone cl7 366-90ll

  • 9 7tO-3 90 0739 YANKEE ATOIAIC ELECRIC 00lAPANY 20 Turnpoke Road Westborough, Massachusetts 01381 Yauxes June 7, 1976 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention:

Mr. Paul R. Nelson, Chief, Fuel Facility and Materials Safety Branch

Reference:

1.

License No. DPR-3 (Docket No. 50-29) 2.

USNRC Inspection Report No. 76-10, May 19,1976.

Dear Sir This letter is in response to your report, Reference 2, concerning a deficiency reported by your inspector.

Deficiency License Conditien 15A of Byproduct Material License 20-06216-01 requires that each ' sealed source centaining byproduct material, other than Hydrogen-3, with a half life greater than thirty days and in any form other than gas, shall be tested for leakage and/or contamination at intervals not to exceed six months.

Contrary to this requirement, four Co-60 sources of 1 millicurie, 1.71 millicuries, 35 19 millicuries and 115.9 millicuries, and one Cs-137 source of 50 curies were not tested between June 4, 1975 and February 1, 1976, an interval of eight months.

Response

Due to a misinterpretation of a letter from the AEC dated March 1,1974, it was assumed that all plant surveillance intervals could be adjusted

+25%.

Using this assumption and other operational considerations a source check war perfo med in June, 1975, approximately 25% earlier than scl.eduled.

Likewise, the January 1976 source check was approximately 255 later than the date of the surveillance schedule.

S $72b

.o 8 o 1106 o Sy[

d' t

9 r

United States Nuclear Regulatory Commission June 7, 1976 Office of Inspection and Enforcement Page Two Plant personnel responsible for the source checks have been instructed to perform such checks at intervals not to exceed six months in accordance with license and Tech. Spec. requirements.

We trust that you will find this response satisfactory.

Very truly yours, YANKEE ATCMIC ELECTRIC CCMPANY 5

k'LV b

J. L. French l

Manager of Operations r

REMR/kg e