Text
I
.
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
.
REGloN I
$31 PA RK AVENUE
KING OF PRUSSI A. PENNSYLV ANI A 19406
MAy13;975
Yankee Atomic Electric Ccmpany
License No. DPR-3
Attention:
Mr. Robert H. Groce
Inspection No. 76-10
Licensing Engineer
Docket No. 50-29
20 Turnpike Road
Westborough, Massachusetts 01581
Centlemen:
This refers to the inspection conducted by Mr. D. Neely of this office
on March 30-31, 1976 at Rowe, Massachusetts, of activities authori::ed by
NRC License No. DPR-3 and to the discussions of our findings held by Mr.
Neely with Mr. H. Autio and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the Office of
Inspection and Enforeccent Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Eased on the results of this inspection, it appears that one of your
activities was not conducted in full compliance with NRC requirements,
as set forth in the Notice of Violation, enclosed herewith as Appendix
This item of noncompliance has been categorized into the levels
'
>
.
as described in our correspondence to you dated December 31, 1974. This
sotice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice", Part 2, ' Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of thic notice, a written
statement v. explanation in reply including:
(1) corrective steps
which have oeen taken by you and the results achieved; (2) corrective
steps which will be taken to avoid further items of noncompliance; and
(3) the date when full compliance will be achieved.
qctuTioy
,.
. ..
- .
s. pf x4a
ie
b
, %.e
.
8011ono#97
.-.
,
.
.
.
,
-2-
i
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosures will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to
be proprietary, it is necessary that you make a written application
within 2^
.fs to this office to withhold such information from public
disclosure. Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is
proprietary, and should be prepared so that proprietary information
identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the speci-
4
fied period, the report will be placed in the Public Document Room.
,
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
b%
/
v
Paul R. Nelson, Chief
Fuel Facility and Materials Safety
.
Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
IE Inspection Report No. 50-29/76-10
cc: