ML19339A860
| ML19339A860 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/11/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19339A858 | List: |
| References | |
| NUDOCS 8011050564 | |
| Download: ML19339A860 (2) | |
See also: IR 05000321/1980035
Text
r /.,s]
[m, a carg'o,
,
UNITED STATES
8
~f,
NUCLEAR REGULATORY COMMISSION
3
.E
REGION ll
b[
q
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA, GEORGIA 30303
In Reply Refer To:
Ng g
RII:RFR
50-321/80-35
50-366/80-35
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by R. F. Rogers of this office on July 15
through August 15, 1980 of activities authorized by NRC Operating License No.
DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion of
our findings held with M. Manry at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and referecces
to prtinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice." 7 :rt 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you to aomit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written app.'ication within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
1
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
8 0.Q
Nf
. .
-.
,
{
..
. _ _ .
. . . _
_
4
..
i
SEP1 ) pgg
Georgia Power' Company
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
-
_
Sincerely,
E. C.
R. C.
ewis, Acting Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
i
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-321/80-35
1
!
and 50-366/80-35
'
cc w/ enc 1:
'
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
W. A. Widner, Vice President and
General Manager-Nuclear Generation
.,
l
,
J
. - -
._,
,
,,
,
,