Forwards IE Insp Rept 50-293/80-22 on 800527-0603 & Notice of Violation.Notice Withheld (Ref 10CFR2.790)
ML19338E497
Person / Time
Site: Pilgrim
Issue date: 07/24/1980
From: Martin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Andognini G
BOSTON EDISON CO.
Shared Package
ML19338E495 List:
References
NUDOCS 8010030101
Download: ML19338E497 (2)


See also: IR 05000293/1980022

Text

T%s

UNITED STATES

t

NUCLEAR REGULATORY COMMisslON

%

REClON I

<

'f

631 PARK A JENUE

MING OF PRUSS I A. PENNby:.VANI A 19406

Docket No. 50-293

.

Boston Edison Company M/C Nuclear

ATTN: Mr. G. Carl Andognini, Manager

Nuclear Operations Department

800 Boylston Street

Boston, Massachusetts

02199

Gentlemen:

Subject:

Inspection No. 50-293/80-2.2

This refers to the inspection conducted by Mr. R. E. Shepherd of this office on

May 27-30 and June 2-3. 1980 at Pilgrim Nuclear Power Station, Plymouth, Massachusetts

of activities authorized by NRC License No. DPR-35 and to the discussions of our

findings held by Mr. Shepherd with Mr. P. J. McGuire and other members of your

staff at the conclusion of the inspection, and to a subsequent telephone discussion

between Mr. E. MacCormack and R. E. Shepherd on June 9,1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the stsps you have taken to correct the item of

noncompliance brought to your attention in a letter dated April 24, 1980.

We

have no further questions regarding your action at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This' item of noncompliance

has been categorized into the levels as described in our correspondence to you

dated December 31, 1974. This notice is sent to you pursuant to the provisions

of Section 2.201 of the NRC's " Rules of Practice," Part 2. Title 10, Code of

Federal Regulations.

Section 2.201 requires you to submit to this office,

within twenty (20) days of your receipt of this notice, a written statement or

l

explanation in reply including:

(1) corrective steps which have been taken by

you and the results achieved; (2) corrective steps which will be taken to avoid

i

further items of noncompliance; and (3) the date when full compliance will be

achieved.

8010osojof

_

.

D

-

.

Boston Edison Company M/C Nuclear

2

2 4 Jul 1830

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, documentation of findings of your control

and accounting procedures for safeguarding special nuclear materials and your

facility security procedures are exempt from disclosure; therefore, the enclosures

to this letter, and your response to this letter will not be placed in the

,

Public Document-Room and will receive limited distribution.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

,

Sincerely,

JAh

'

alter G. Martin, Chief

di Safeguards Branch

Enclosures:

1.

Appendix A, Notice of Violation (Contains 2.790 Information)

2.

Office of Inspection and Enforcement Inspection Report

Number 50-293/80-22 (Contains 2.790 Information)

cc (with report cover sheet only):

P. J. McGuire, Pilgrim Station Manager

l