Responds to NRC Re Violations Noted in IE Insp Rept 50-369/80-04.Corrective Actions:Rept Issued to Record Items of Noncompliance & Evaluation Performed to Determine Proper Actions Necessary to Resolve Problems
ML19338D929
Person / Time
Site: McGuire 
Issue date: 06/05/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19338D920 List:
References
NUDOCS 8009240220
Download: ML19338D929 (3)


Text

.

.r'

+e-

'g y

ed.*

't J

~

DUKE POWER ' COMPANY s

Powsm Butt.ntxo 422 Sourn Cnuncu Srazzi, CnAntorTz, N. C. 28242 wituAme o. **anca..sn.

June 5,19'8tj JUij S P3 5?

ViCE Pars otm?

TcLap o=c:Anca704 Straw Paoouction 373 4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II

~

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Subj ect: McGuire Nuclear Station Docket No. 50-369

Reference:

RII:WPA 50-369/80-04 i

Dear Mr. O'Reilly:

As requested by your letter of May 12, 1980 please find attached a response to the item of noncompliance' identified in the subject inspection report.

f I

Duke Power Company does not consider any information contained in IE Inspec-tion Report No. 50-369/80-04 to be proprietary, ry truly your,

.an..-U.

William O. Parker, r.

1.JB:ses Attachment l

I l

{

8009240 OFFICIAL COPY kh

~

~.

a __ p

-- ~w

~ ~'~'

~

4 s

L MCGUIRE NUCLEAR STATION ~

Response to IE' Inspection Report No. 50-369/80-04 I

-As required by 10 CFR 50,LAppendix B, Criteri'n-V and as implemented by o

Duke Power Company Topical-Report 1A, Activities affecting quality shall be

~

prescribed by documented instructions, procedures, or drawings.

i

.. and shall be accomplished.in accordance.with-these instructions, procedures or l

drawings.

E i

i a.

Construction Procedure 308 Table on Steve Anchors requires 5/8 inch I

diameter self drill expansion anchors to be installed with a torque valve of 40 to 45 ft-lbs.

7 P

l b.

Math model drawing MCA.1414-03.20-05 requires reactor coolant system supports;1NC-711 and 1-NC-712 to be 28 inches apart.

Drawing.1-MCA-HD-H76 requires the Residual Heat Removal (RHR) system c.

hanger ND H76 to have a 1/8-inch maximum gap with the pipe.

d.

Drawing MC-1678-4 requires the RHR penetration M 381 to have a minimum sleeve to'pipeLclearance of 1/8 inch.

Contrary.to the above:

i a.' On April 17, 1980, 5/8 inch self drill expansion anchors for RHR support I

l-ND-H76 were found to be torqued less than 40-45 ft-lbs.

b.

On April 17, 1980, spacing between supports 1-NC-711 and INC-712 was measured to be'20 inches.

On Aprii 17, 1980, RHR support ND-H76 had a gap of 1/4 inch.

c.

d.

RHR penetration M 381 had no gap at the bottom of the pipe.

RESPONSE' V

In regard to Items a and c, a nonconforming item report has been issued to document these discrepancies. -An; evaluation will be performed to' determine L

.the appropriate actions to be taken to resolve these problems. Required action will.be~ completed by_ June 30, 1980.

t In regard.to Item.b, when a support restraint is located on the analyzed side

~

of a component:and does not exceed the axial restraint criteria, the location

~

tolerance. acceptance criteria is + - 1 foot.

Supports 1-NC-711 and 1-NC-712 are springs (not axial restraintsf and are on the analyzed side of the nearest' component. 'The difference between the analyzed and erected locations is 8 1/16 inches which'is acceptable. Therefore,' Duke Power Company does not consider this item to.be.an item of' noncompliance.

~

k 1

i a

y g-y r

e v,A+

-4 g s N" e-T'w-

^::

- ^ ^ ' - ~ ~ ^ - ' " ' - ~~

- ~ ' ~ ~ " ~ ~ - - ^ -

~

s a s 6 In regard to Item d, drawing MC-1678-4 will be revised to clarify that the gap requirement for penetration M381 is nominal and is only required to assure free movement.

.-