ML19338D924

From kanterella
Jump to navigation Jump to search
Responds to IE Insp Rept 50-369/80-04.Corrective Actions: Performed Reinsp of Hangers
ML19338D924
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 06/30/1980
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19338D920 List:
References
NUDOCS 8009240212
Download: ML19338D924 (2)


Text

.. _.... _ _

)

.. vj ',

  • e DUKE POWEH COMPANYjs;tRC REG!ON ::

Powra Den.nswo

' IL AdIb.

(

422 Socin Cnuncu Sraxtr, CHAalDTrz, N. C. asa4a vi w aw o.Pannen,sa.

June 30, 1980 VCF Perseerut it L t a=om t:Anta704 Straes Peoovenoes 373-4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II i

101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

McGuire Nuclear Station Docket No. 50-369/80-04

Reference:

RII:WPA 50-369/80-04

Dear Mr. O'Reilly:

As requested by Mr. W. P. Ang of your staff, please find attached a supplemental response to the item of noncompliance identified in IE Inspection Report 50-369/80-04. This letter supplements my response of June 5, 1980.

Very truly yours, 7

C. P William O. Parker, Jr.

Wk LJB:scs Attachment 8009240 ci F1CIAL COPY w

s DUKE POWER COMPANY MCGUIRE NUCLEAR STATION Supplemental Response to IE Inspection Report No.

50-369/80-04

RESPONSE

My letter of June 5, 1980 stated that in regard to Items A and C a nonconforming item report had been issued to document the discrepancy and an evaluation would be performed to determine the appropriate actions to be taken to resolve these problems. The action required by the nonconforming report involved the reinspec-tion of ten hangers which had been signed off by the QC inspector responsible for the inspection of RHR support ND-H76.

Of the hangers inspected two hangers had concrete anchors which failed the torque inspection. Forty additional hangers will be inspected for proper torque in order to evaluate the extent of this problem. This additional inspection will be complete July 16, 1980. Any discrep-ancies will be evaluated to determine if further action is necessary. A supple-mental response will be sent to the NRC describing the results of this evaluation on July 18, 1980.

Nonconforming items associated with hanger ND-H76, as identified in the subject inspection report, have been corrected.

In regard to Item D, the only requirement necessary was to assure free movement of the pipe. An evaluation of this problem has established that drawing MC-1678-4 is the only design drawing which incorrectly contains penetration clearance requirements.

It is felt that the provisions of the Quality Assurance Program adequately assure compliance with design drawings.

i i