Forwards IE Insp Repts 50-317/80-01 & 50-318/80-01 on 800204-29 & Notice of Violation
ML19337A993
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/22/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19337A991 List:
References
NUDOCS 8010010182
Download: ML19337A993 (2)


See also: IR 05000317/1980001

Text

,/

\\

-

UNITE 3 STATES

o

NUCLEAR REGULATORY COMMISSION

[

o

REGION l

$

g

83I PARK AVENUE

"

\\[*****}f

KING OF PRUSSI A, PENNSYLVANIA 19408

API, 2'2. 1930

Docket Nos. 50-317

50-318

1

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

,

Gentlemen:

Subject:

Inspection 50-317/80-01; 50-318/80-01

This refers to the inspection conducted by Mr. R. Architzel of this office

on February 4-29, 1980 at the Calvert Cliffs Nuclear Power Plant, Lusby,

Maryland of activities authorized by NRC License Nos. DPR-53 and DPR-69 and

to the discussions of our findings held by Mr. Architzel with Mr. L. Russell

of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter,

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

i

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

l

These items of noncompliance have been categorized into the levels as

described in our correspondence to you dated December 31, 1974.

This

'

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation in

reply including:

(1

corrective steps which have been taken by you and the

'

results achieved; (2 corrective steps which will be taken to avoid further

items of noncompliance; and (3) the date when full compliance will be

achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room.

If this report contains

any infonnation that you (or your contractor) believe to be proprietary, it

-

is necessary that you make a written application within 20 days to this

office to withhold such infonnation from public disclosure. Any such application

i

I

9010e10

_ _ _ _

.

.

APR 2 21980

Baltimore Gas and Electric Company

2

must be accompanied by an affidavit executed by the owner of the infomation,-

which identifies the document or part sought to be withheld, and which

contains a statement of reasons which addresses with specificity the items

,

which will be considered by the Comission as listed in subparagraph (b)

(4)ofSection2.790. The infomation sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified period, the

report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

dk O d h .h.,

Eldon J. Brunner, % M

Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-317/80-01; 50-318/80-01

cc w/encis:

R. M. Douglass, Manager, Quality Assurance

L. B. Russell, Chief Engineer

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Senior Engineer

K. H. Sebra, Principal Engineer