Text
fV
[yn May
s
UNITED STATES
!
o,t
NUCLEAR REGULATORY COMMISSION
$
I
REGION ll
b[
$
101 MARIETTA ST
N.W., SUITE 3100
o
ATLANTA, GEORGIA 3o3o3
JUL 2 51980
In Reply Refer To:
RII:LM
50-327/80-21
.
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by L. Modenos of this office on June 24
through 26, 1980 of activities authorized by NRC Operating License No. DPR-77
for the Sequoyah Nuclear Plant facility, and to tne discussion of our findings
held with J. M. Ballentine at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
-
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
During the inshiection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-
tions. Section 2.201 requires you t; submit to this office, within 20 days of
your receipt of this notice, a writt:n statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further ,oncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code'of Federal Regalations, a copy of.this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written app'ication within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
l
80100100.23
.
.
-_
..
.. -
__
.,
Tennessee Valley Authority
-2-
.
Should you have any questions concerning this letter, we will be glad to discuss
.
them with you.
.
Sincerely,
..
,
l
C. E. Murphy, hief
'
Reactor Constm.ctT
and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-327/80-21
cc w/ enc 1:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
l
Superintendent
,
l
J. F. Cox, cupervisor, Nuclear
'
.
Licensing Section
l
H. J. Burzynski, Project Engineer
l
H. N. Culver, Chief, Nuclear Safety
Review Staff
'
(
i
l
l
l
l
l
<
~
-y